Safety measures for aerial work include setting protective railings, covering holes, installing safety doors, hanging safety nets and setting safety protection sheds when necessary.
General construction safety regulations and technical measures for aerial work
1. Before construction, conduct safety technical education and disclosure step by step, and implement various safety technical measures and personal protective equipment. No construction can be carried out without implementation.
2. Safety signs, tools, instruments, electrical facilities and various equipment for aerial work must be inspected before construction, and can only be put into use after being confirmed in good condition.
3. Personnel who hang, climb and erect high-altitude safety facilities must receive special safety operation training in accordance with the relevant provisions of the state and obtain the qualification certificate for special operations before they can work at their posts.
4. Personnel engaged in aerial work must have regular physical examination. When he is diagnosed with heart disease, anemia, hypertension, epilepsy, acrophobia and other diseases that are not suitable for aerial work, he shall not engage in aerial work.
5, aerial work personnel should wear safety helmet, tight overalls, feet wear non-slip shoes, waist belt.
6. First, remove or fix all objects that may fall in the aerial work place. All used articles should be piled up smoothly, so as not to hinder the passage and loading and unloading. Tools should be conveniently put into the tool bag, and the removed objects, surplus materials and waste materials should be cleaned up and transported away in time. When cleaning, transfer or tying should be adopted, and throwing is prohibited.
7. In case of strong winds, dense fog, heavy rain and other bad weather, it is forbidden to hang and climb in the open air. After typhoon and rainstorm, check the safety facilities for aerial work one by one. If it is found to be loose, deformed, damaged or falling off, leaking rain or electricity, it should be repaired or reset immediately.
8. All safety protection facilities and safety signs. No one is allowed to damage or move or dismantle it without authorization. If the safety protection facilities and safety signs need to be temporarily removed or changed due to the operation, it must be approved by the relevant person in charge of construction, and corresponding reliable measures should be taken immediately after the operation is completed.
9. When defects and hidden dangers are found in the safety technical facilities for aerial work during construction, they must be reported immediately and solved in time. When personal safety is endangered, the operation must be stopped immediately.