1, the construction organization design and construction scheme prepared at the start of each project should be included in the various safety technical measures involved in the aerial work of the project, so as to nip in the bud. And try to take ground operations to reduce all kinds of aerial work.
2. The safety technical problems of working at heights cover a wide range, including general requirements, such as setting up safety signs, setting up safety nets and safety flat nets, and various special safety protection measures. During construction, safety protection measures should be strictly implemented, people-oriented principle should be adhered to, and operations should be carried out on the premise of ensuring the safety of construction personnel.
3. Operators of special jobs working at heights generally need to have a physical examination once a year. People suffering from heart disease, hypertension, psychosis, epilepsy, etc. Personnel who are not suitable for aerial work shall not be arranged to engage in this work.
Workers working high above the ground should wear elastic clothes, but they should never be shirtless and naked. Wear soft-soled non-slip shoes under your feet, and never wear slippers, hard-soled shoes or shoes with nails. When operating, we must strictly abide by various safety operation procedures and labor discipline, and adhere to the principle of not hurting others, not hurting ourselves and not being hurt by others to ensure safe production.
5, climbing and hanging operations (such as scaffolder, structural installer, etc. ) personnel are more dangerous, so such personnel must pass the training examination and obtain the operation certificate of special types of work before they can take up their posts, and conduct regular training and safety knowledge update education.
6. The materials used in aerial work should be piled up smoothly, and should not be placed near the limb or the hole, nor should they hinder safe passage. Running walkways, access panels and climbing appliances should be cleaned at any time. Dismantled objects, surplus materials and wastes shall be cleaned up and transported away in time, and shall not be placed or discarded down at will. You can't throw objects when passing them. In all construction workplaces, all materials that may fall should be removed first to prevent people from falling.
7. When defects or hidden dangers are found in the safety facilities for working at heights during construction, they must be dealt with immediately. For the hidden dangers that endanger personal safety, the operation should be stopped immediately and rectified. No one is allowed to move or remove all safety protection facilities and safety signs without authorization. Some must be removed or moved due to construction needs, and can only be removed after being approved by the person in charge of construction, and then resumed after completion.
8, the builder should do a good job of each type of work process handover procedures, different types of work in the construction of different hazards, the builder should be targeted according to different types of work for workers to do a good job of safety technical disclosure, resolutely implement the principle of production must be safe, put safety in the production process, to ensure production safety.
9. During the main construction of the project under construction, the external scaffold must be synchronized with the main construction, and the external scaffold must be beyond the operating surface1.2m. During the decoration construction, the safety inspection and maintenance of the external scaffold should be strengthened, and the falling objects on the external scaffold should be cleaned up in time to avoid injuries caused by falling objects.