In order to fully mobilize the enthusiasm of teaching staff to engage in scientific research, realize the scientific and standardized management of scientific research projects and promote the smooth completion of various scientific research tasks. The following are the management methods of scientific research projects in normal universities that I brought to you, hoping to help you.
Measures for the Administration of Scientific Research Projects in Teachers College 1 Chapter I General Provisions
Article 1 These Measures are formulated in order to improve the quantity and quality of scientific research achievements and improve the efficiency of scientific research services.
Article 2 Scientific research projects are divided into vertical scientific research projects and horizontal scientific research projects. Vertical scientific research projects refer to scientific research projects approved, approved and funded by the state, ministries, provincial science and technology departments, provincial education departments and other government agencies; Horizontal scientific research projects refer to service contract projects such as scientific and technological development signed with enterprises and institutions.
Article 3 The main contents of scientific research project management
1. The Scientific Research Division is mainly responsible for formulating the annual work plan of scientific research projects; Organizing the declaration, summary and reporting of scientific research projects; Supervise and inspect the implementation of the scientific research work plan; Investigation, statistics and summary of project research progress; Managing the use of funds for scientific research projects; Organizing the appraisal and popularization of scientific research achievements; Organize the acceptance of scientific research projects.
2 colleges or independent research institutions are mainly responsible for formulating the annual scientific research work plan and work points of the unit, and organizing the project declaration, major project demonstration and quality control of the unit.
Chapter II Project Classification
Article 4 Category I Scientific Research Projects
Key projects of National Natural Science Foundation of China; Major projects of National Natural Science Foundation of China; Major research projects of the National Natural Science Foundation of China (supported by more than 6,543,800 yuan); Key projects of National Social Science Fund; Science Fund for Distinguished Young Scholars; National science and technology office
Support the planned projects (the fund is more than 6,543,800 yuan); Major projects of the national soft science research plan; 863 Program (supported by 6,543,800 yuan); 973 Project (supported by 6,543,800 yuan); Special fund for national excellent doctoral dissertations in colleges and universities.
Article 5 Category II Scientific Research Projects
National Natural Science Foundation Project; Director Fund of Science Department of National Natural Science Foundation of China; Special project of National Natural Science Foundation; National Social Science Fund Project; National soft science research plan project; National policy science and technology plan (Spark plan, agricultural science and technology achievement transformation fund support project, torch plan, national key new product plan, international science and technology cooperation plan); Special projects entrusted by national ministries, provinces, autonomous regions and municipalities directly under the Central Government (research funds for natural science projects are more than 400,000 yuan, and humanities and social science projects are more than 200,000 yuan); 863 Project (with a fund of more than 300,000 yuan); 973 project (funded by more than 300,000 yuan); Fok Ying-tung Foundation for Young Teachers Education in Colleges and Universities; Special research fund for doctoral programs in colleges and universities; Outstanding Talents Support Program of the Ministry of Education in the New Century; Key project of philosophy and social science research of the Ministry of Education.
Article 6 Three types of scientific research projects
Science and technology research project of the Ministry of Education; Research Start-up Fund for Returned Overseas Students of the Ministry of Education; Humanities and Social Sciences Research Project of Ministry of Education; Open Fund for State Key Laboratory and National Engineering (Technology) Research Center; National ministries, provinces, autonomous regions and municipalities directly under the central government entrust special projects (the research funds for natural science projects are more than 200,000 yuan, and the research funds for humanities and social sciences projects are more than 65,438+10,000 yuan); National educational science planning project; Supported by China Postdoctoral Science Foundation; Special research fund for doctoral programs in colleges and universities (new teacher fund project); 863 Project (funded by 654.38 million yuan); 973 project (funded by 654.38 million yuan); Provincial Natural Science Foundation Project; Provincial Science and Technology Fund for Outstanding Youth; Provincial key scientific and technological projects; Scientific research plan project of provincial science and technology department; Provincial soft science research scale
Planning projects; Provincial philosophy and social science planning project; Project supported by Talent Development Fund of Provincial Personnel Department; Key Project of Natural Science Research of Provincial Education Department; Key research project of humanities and social sciences of provincial education department.
Article 7 Four types of scientific research projects
Natural science research project of provincial education department; Humanities and Social Sciences Research Project of Provincial Education Department; Anhui Excellent Talents Fund Project; Open funds for provincial key laboratories and provincial engineering (technology) research centers; Special projects entrusted by national ministries, provinces, autonomous regions and municipalities directly under the Central Government (research funds for natural science projects are more than 654.38 million yuan, and research funds for humanities and social sciences projects are more than 50,000 yuan); Local municipal governments and bureau-level units entrust special projects (the research funds for natural science projects are more than 654.38+10,000 yuan, and the research funds for humanities and social sciences projects are more than 30,000 yuan); Provincial Sports Bureau, Tourism Bureau and other scientific research projects; Provincial educational science planning project.
Article 8 Five types of scientific research projects
School-level natural science research projects, school-level humanities and social science research projects, and school-level "Party building and ideological and political education" special projects.
Chapter III Project Declaration and Project Establishment
Article 9 The scientific research office shall timely issue notices on project declaration, application form, time arrangement and other matters. After receiving the project application information, each unit shall inform the teaching staff of the unit within 7 days, and designate a special person to convey it to the teaching staff of the unit who are studying or traveling abroad.
Article 10 The project applicant shall, in principle, be declared by the scientific research team of the college to which he belongs, and confirmed by the person in charge of the scientific research team.
The establishment of scientific research teams in colleges and universities should be selected according to the first-level disciplines or according to the characteristics and present situation of the two disciplines in colleges and universities.
Eleventh scientific research departments and units in charge of scientific research leaders and research team leaders have the obligation to answer and solve the relevant questions raised by teachers in the application process.
Article 12 The person in charge of each scientific research team shall make a preliminary examination of the application and submit it to the college after signing the opinions. Each college should set up a corresponding discipline group or hire experts to guide the application of scientific research projects, review the scientific research topics and arguments of the applicants, and report them to the academic committees of each college after approval.
Thirteenth scientific research departments to review the application materials of each unit, submitted to the academic committee of the school for deliberation and decision. In principle, if the number of applicants and the application index are lower than 1.5 1, and the total number of applications does not exceed 15, the office of academic committee of colleges and universities will organize 5-7 experts to vote for confirmation.
Fourteenth provincial and ministerial level and above key projects shall be submitted to the academic committee of the school for deliberation after examination and approval by all units, and the office of the academic committee of the school shall organize experts to select some key projects for recommendation, and feed back the project information to relevant colleges. Relevant colleges timely organize 3-5 experts who have participated in the project review at the corresponding level, put forward suggestions for improvement and modification of key recommended projects, and submit them to the scientific research office within the specified time.
Fifteenth school-level scientific research projects are selected once a year. The school will set up a certain proportion of special scientific research topics for provincial key disciplines, key laboratories and engineering technology research centers according to the needs of discipline construction and school development.
Chapter IV Mid-term Project Management
Sixteenth kinds of scientific research projects, project leaders should be in accordance with the requirements of the plan or contract, seriously organize the implementation. Schools and units should actively create conditions to ensure that the project is completed as planned.
Seventeenth scientific research departments issued a project notice within one month, the project leader should be
Submit opening report (including research plan, fund use plan, etc.). ) to the scientific research office. Once the plan is determined, it shall not be changed at will. If it is really necessary to adjust or change the plan, the examination and approval procedures must be handled according to the corresponding regulations, and the change can only be made after the approval of the competent project unit; If it is really necessary to terminate the project research, the person in charge of the project shall put forward an application report for canceling the scientific research project and report it to the competent unit for approval.
Eighteenth scientific research expenditure units should set up a special academic committee to carry out the work, give full play to the advantages of the three-level management of the school, the hospital and the team, and increase the supervision of the pre-audit and project research process of each unit. For cross-departmental and interdisciplinary major comprehensive projects, the scientific research office will coordinate the relevant units and project leaders to clarify the rights and obligations of each undertaking unit in the form of subcontracts.
Nineteenth scientific research departments in conjunction with the relevant units to check the progress of the project every year. The project team must fill in the interim checklist on time according to the relevant requirements. At the same time, at the end of each year, the person in charge of the project will summarize the implementation of the project and report the important changes in writing to the scientific research office for review, phased achievements and scientific research records (including experimental records and survey data, etc.). ) will be reported as an attachment. For the projects with poor implementation of research plan, no progress in work, unqualified mid-term inspection and improper use of funds, scientific research departments and units should publish them on the corresponding web pages and implement them according to the documents of relevant competent units.
Twentieth the implementation of the project leader responsibility system, to ensure that the research team is relatively stable. The members of the project team shall not be changed at will in principle. If it is really necessary to adjust the personnel, the person in charge of the project shall submit a written application, which shall be approved by the scientific research office at the higher level of the project.
Twenty-first due to job transfer or other reasons, the person in charge of the project can not continue to preside over the research work, must be reported by the college or department, the replacement of the person in charge, the scientific research department reported to the competent unit for approval before implementation. After the replacement, the person in charge should assume the responsibilities of the original person in charge and do a good job in the follow-up research.
Article 22 If the undertaken project is postponed or cancelled without justifiable reasons,
Investigate the responsibility of the person in charge of the project and stop using the remaining funds, and the responsibility for breach of contract or other problems caused by this shall be borne by the person in charge of the project.
Chapter V Project Summary and Evaluation
Twenty-third all kinds of projects should be completed according to the planned research period (application, contract, agreement), and the completion procedures should be completed within three months after the completion of the project. The results of all funded projects must indicate the source of project funds.
Requirements for the appraisal of category 24 projects.
1. The closing requirements of scientific research projects at or above the provincial or ministerial level shall be implemented with reference to the documents of specific competent units.
2. Scientific research project of Anhui Provincial Department of Education
(1) If the research is conducted in strict accordance with the project declaration or plan, it shall be directly reported to the relevant departments of the Provincial Department of Education for project conclusion appraisal;
(2) In the process of project research, if the project declaration or plan changes, the results shall meet the following conditions:
Key projects in humanities and social sciences need to submit monographs 1 book, or publish more than 4 academic papers, of which no less than 1 paper is for second-class journals; General projects of humanities and social sciences (including self-financing) must submit more than 3 published academic papers.
Key natural science projects need to submit 1 invention patents and publish more than 3 academic papers; Or published more than 4 academic papers, of which more than 2 were retrieved and included by SCI, EI and Medline; Or published more than 6 academic papers, including no less than 2 second-class periodical papers; General natural science projects (including self-financing) need to publish more than 3 academic papers, including no less than 1 paper for second-class periodicals.
If the competent unit has clear requirements for the conclusion of the above projects, it shall be implemented according to its relevant documents.
3. University scientific research projects
Key projects need to publish more than 2 academic papers, including second-class papers 1 above; General projects need to publish more than 2 academic papers or 1 article in secondary and above journals. If the achievements of the project are rewarded by scientific research or teaching achievements at or above the school level, they will be exempted from achievement appraisal.
Twenty-fifth projects that apply for appraisal must submit a conclusion report and relevant supporting materials, and submit them to the competent project unit for examination and approval. Need to identify (acceptance) to apply for identification (acceptance) in a timely manner. When submitting project conclusion materials, natural science research projects must submit original experimental data, records and other related materials, and humanities and social science research projects must submit original survey statistical data and related materials.
Article 26 The person in charge of the project is responsible for providing and keeping the relevant materials of the project, mainly including: the application for the project (subject) and the opening report; Contract or task book; Agreement; Report on the implementation of the annual plan; Workbooks and relevant meeting minutes; Thematic summary, paper, design, technology, technical specifications, standards, typical objects and sample photos; Video materials, appraisal materials, acceptance materials, appraisal certificates, achievement application materials, award-winning application materials and award-winning certificates; Relevant documents, letters, etc. Project supervisor.
Twenty-seventh university-level scientific research projects are divided into three categories: excellent, qualified and unqualified.
Article 28 If the planned research content cannot be completed within the specified time due to special reasons, the person in charge of the project shall submit a written report to the scientific research office three months in advance to explain the reasons, and the extension shall not exceed one year after being audited by the scientific research office and approved by the competent project unit. Before the completion of the project, the person in charge of the project cannot apply for a new project at the same level in principle. If the project cannot be completed on schedule, the person in charge shall not declare new projects within two years, and deduct the indicators appropriately in the declaration of the same level and first-level projects in his college next year.
Twenty-ninth scientific research departments should register and file the completed projects, and guide the project leaders to register their achievements and apply for patents.
Chapter VI Horizontal Projects
Thirtieth horizontal projects shall be implemented with reference to the above provisions, unless otherwise agreed by the project leader and the project approval unit or individual.
Article 31 Without the consent or authorization of the school, no individual or institution in our school may sign a horizontal scientific research contract with a third party in the name of the school or department. With the consent or authorization of the school, all departments or individuals in the school must abide by the "People's Republic of China (PRC) (People's Republic of China (PRC)) Contract Law" and other laws and regulations when signing scientific research contracts with off-campus units, all in the name of "Fuyang Normal University" and stamped with the special seal for technical contracts of Fuyang Normal University.
Thirty-second horizontal projects are initiated by contract, and the scientific research department will incorporate them into the school's scientific research plan according to the original scientific research project contract, and accept applications for intellectual property rights such as identification, registration, awards and patents of scientific research project achievements.
Chapter VII Reward and Punishment
Thirty-third school-level scientific research projects identified as excellent and qualified, the school issued a corresponding certificate of completion, identified as excellent, the school in the same level and level of project declaration priority recommendation. If the appraisal conclusion is unqualified, it shall not declare similar or above scientific research projects within one year.
Chapter VIII Supplementary Provisions
Thirty-fourth these Measures shall be implemented as of the date of promulgation, and the scientific research office shall be responsible for the interpretation.
Measures for the management of scientific research projects in normal universities Part II: Carrying out teaching and scientific research activities is an important way to improve teachers' academic level and teaching quality, and it is also an important measure to improve the visibility of the college. In order to fully mobilize the enthusiasm of the teaching and scientific research work of our faculty, further strengthen the teaching and scientific research management of our college, and standardize and institutionalize this work, these measures are formulated.
First, management organization.
The College has set up a "Teaching and Scientific Research Leading Group", headed by the competent leader of the College, with middle-level leaders of relevant departments and offices as members (see below) to lead the teaching and scientific research work of the whole hospital. The office of the leading group is located in the scientific research supervision office, and the director of the scientific research supervision office is also the director of the office to handle daily affairs.
Second, the project management
Teaching and scientific research projects implement the project contract management system, that is, the project host signs a project implementation contract with the college, and the scientific research supervision office manages the project implementation according to the terms of the contract.
(A) University self-reliance project management
1. Project application
At the beginning of September each year, teachers should declare the time of the next year's teaching and research projects. The project application must be approved by the departments, departments and offices in the first instance, signed by the scientific research supervision office, and submitted to the leading group for scientific research of the college for examination and approval. The leading group of teaching and scientific research in our hospital will examine and approve the project in late September every year (if necessary, experts from outside the hospital can be hired to assist in the examination and approval). After the project is established, the Scientific Research Office will issue the project implementation notice document and sign a project implementation contract with the project leader (the terms of the contract will be drawn up separately), which is the project establishment.
2. Research funding
According to the scale of the project and the research content, the college grants research grants of less than 4,000 yuan for each project.
For projects outside the college (above the provincial level), if they are funded projects, the college will pay the research funds of the projects in the system of 1: 1 according to the funding situation of the higher authorities. Do not belong to the funded projects, according to the scale of the project and the actual research content, give 5000-XX0 yuan of research funding subsidies.
3. Implementation and monitoring
The approved project is organized and implemented by the project director, and the scientific research supervision department of the college conducts supervision and management according to the project implementation contract. For teaching and research projects that are not implemented according to the contract without special circumstances, the responsibility of the project leader shall be investigated according to the terms of the contract and the relevant provisions of the contract law.
(B) the management of foreign projects
External projects (including those assigned by superiors) are managed by the scientific research supervision office;
1. In principle, foreign projects won by college teachers shall be implemented by project bidders, reported to the scientific research supervision office for the record and managed by the scientific research supervision office;
2. The project issued by the superior shall be subject to public bidding in the college, and the winning bidder shall sign a contract with the college, and the scientific research supervision office shall supervise the implementation according to the terms of the contract.
Third, fund management.
(1) Source of funds
1. The College has established the "Teaching and Research Project Development Fund". One of its sources is to extract 2% from the business funds allocated by the higher level finance every year; The second is to accept donations from enthusiastic people; The third is other sources.
2. Funding for teaching and scientific research projects allocated by higher authorities.
(2) Fund management
1. The development fund for teaching and scientific research projects and the scientific research funds allocated by the higher authorities are managed by the special account of the finance department and approved by the leading group for teaching and scientific research.
2. The project funds shall be allocated by stages according to the project contract, and the principle of "earmarking, lump-sum use, and over-expenditure without compensation" shall be adhered to.
3. Withdrawal method of project funds: firstly, the project director submits an application, which is reported to the scientific research supervision office for signature and filing, and is approved by the leader of the scientific research leading group of the Institute of Education.
Fourth, results-based management.
(1) Achievement evaluation
After the completion of the project, the project director writes the project summary, submits the research results, fills in the application form for project appraisal, and reports it to the office of the research leading group of the Institute, which organizes expert appraisal.
The appraisal standard focuses on academic level and practical value, and comprehensively measures its scientificity, reliability, advancement and rationality (specific matters shall be subject to the contents of the project contract).
(2) Achievement Award
1. Award the first, second and third prizes to the projects that have won the academy-level scientific research achievement award, and issue certificates and bonuses. Bonus payment standard: first prize 1500 yuan, second prize 1200 yuan, third prize 800 yuan.
2 foreign projects, or hospital projects after the declaration, by the higher authorities, departments reward, reward according to the following standards:
(1) The scientific research achievements that won the first, second and third prizes at the national level are rewarded according to the standard of XXX0 yuan, 10000 yuan and 6000 yuan respectively, and the teaching and scientific research achievements that won the first, second and third prizes at the national level are rewarded according to the standard of 10000 yuan, 6000 yuan and 4000 yuan respectively.
(2) The scientific research achievements that won the first, second and third prizes at the provincial and ministerial level shall be rewarded according to the standards of 10000 yuan, 6000 yuan and 4000 yuan respectively, and the teaching and scientific research achievements that won the first, second and third prizes at the provincial and ministerial level shall be rewarded according to the standards of 6000 yuan, 4000 yuan and XX yuan respectively; (3) The scientific research achievements that won the first, second and third prizes at the prefecture level were rewarded with 6000 yuan, 4000 yuan and XX yuan respectively, and the teaching and scientific research achievements that won the first, second and third prizes at the prefecture level were rewarded with 4000 yuan, XX yuan and 1000 yuan respectively. Those who have won teaching and scientific research awards from international or foreign academic organizations shall be rewarded according to national standards.
(3) Special reward
1. In order to encourage faculty to actively strive for teaching and scientific research funds from relevant departments, the college gives the following preferential measures to strive for foreign projects: First, if it is really necessary to complete the project, the college can allocate matching funds to the project according to the ratio of 1: 1; Second, in the process of project implementation, it is allowed to extract certain funds from the project funds as "research funds". The "double-control" system is implemented in the payment of allowances, that is, the total amount of allowances withdrawn does not exceed 20% of the total amount of funds allocated under the project; The highest standard of allowance: the director of scientific research project, according to the national, provincial and municipal project level, 300 yuan, 200 yuan and other cities shall not exceed 150 yuan; The host of teaching and scientific research projects, according to the national, provincial and ministerial level, municipal project level, does not exceed 200 yuan, 150 yuan and 100 yuan per month respectively; Half of the project participants.
2. For the teaching and research projects that have not been allocated funds, according to the project scale and research content, the college gives 10000- 15000 yuan, 6000- 10000 yuan and 4000-6000 yuan respectively. Specific funding method: after the project is started, 50% of the lower limit is borrowed according to the corresponding level, and the rest is allocated after the project is completed and the results are submitted to the college. For projects that do not submit results, all pre-allocated funds will be deducted.
(four) the measures shall be implemented as of the date of promulgation.
(five) in the past, the relevant documents are inconsistent with these measures, and these measures shall prevail.
(six) matters not covered shall be explained by the leading group of teaching and scientific research of the hospital.
;