In study, work or life, some unexpected things will inevitably happen. In order to control the development of accidents, it is usually necessary to prepare emergency plans in advance. How to write an emergency plan? The following is a classic emergency plan (generally 5) for typhoon season safety prevention compiled by me, for your reference only. Welcome to reading.
Classic emergency plan for typhoon season safety prevention 1 In order to do a good job in typhoon prevention at my construction site, reduce disaster losses and ensure personal and property safety, according to the spirit of the Law of People's Republic of China (PRC) on Safety in Production and the relevant documents of the District Construction Bureau, combined with the actual situation of our company, the emergency response work plan of this project department is specially formulated.
First, the basic principles of emergency treatment
(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.
(two) the implementation of emergency treatment to follow the principle of unified command, responsibility, prevention first, rescue first, rapid response, to ensure safety.
Second, the organization and the responsibilities of the supervisor
The project department set up a leading group for typhoon prevention on the construction site.
Team leader: Zhu Jiahua, project manager.
Deputy team leader: Dai Jinquan, deputy manager of the project department, and Zhou, technical director.
Members: Zhang Hua, safety office of the project department, Cai Baobin, quality engineer, Zhang Jianhu, builder and other relevant personnel.
Main responsibilities:
(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;
(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;
(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;
(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.
Third, the implementation of the plan
(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:
1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;
2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon prevention.
(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:
1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;
2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.
(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:
1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;
2. The construction site stops and the construction personnel are evacuated to safety;
3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;
4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.
After the typhoon, when the meteorological station issues a typhoon warning, the project department should check the disaster situation and report it to the branch and the head office. Strengthen the site safety facilities in time and summarize the typhoon prevention work.
Classic emergency plan for typhoon season safety prevention II. Purpose:
Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.
Second, responsibilities:
The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;
The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;
The safety promoter is the deputy commander, responsible for the overall work of the rescue team;
The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;
The control center is responsible for the accurate transmission and coordination of information;
All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.
Third, the division of responsibilities of the group:
3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.
3. 1. 1 Take all measures to deal with the dangerous situation;
3. 1.2 Responsible for filling, handling and stacking flood control sandbags;
3. 1.3 use various methods to eliminate dangerous situations in time.
3. 1.4 Division of labor
3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;
3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;
3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;
3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.
3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.
3.2. 1 Responsible for starting various pumps and power supply equipment;
3.2.2 Provide technical guidance to the rescue site;
3.2.3 Conduct emergency maintenance on the field equipment.
3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.
3.3. 1 Ensure the normal supply of all kinds of relief materials;
3.3.2 Be responsible for the rescue of the wounded on site;
3.3.3 Actively assist other groups;
3.3.4 Division of labor
3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;
The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;
In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.
3.4 personnel on duty
4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;
4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;
4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;
4. 1.4 center attendant reports to each duty post;
4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;
4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.
4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.
Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.
Classic emergency plan for typhoon season safety prevention 3 I. Guiding ideology:
Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".
Two. Preventive measures:
1, list of leading groups and contact telephone number
Team leader: director of the park
Team member: logistics team leader
Education director
Union president
The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership and 24-hour duty system.
Three. Emergency measures:
1. Strengthen information communication to release and report information.
When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate; The competent leader shall report the disaster to the leading group for flood prevention and typhoon prevention; Fully deploy typhoon prevention and flood control work.
2. Give priority to prevention:
Clear the corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.
Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.
The doorman fully dredged the sewers and main collecting wells of the whole school.
Dredge drains and downpipes on school buildings, and trim and strengthen school trees.
Conduct a comprehensive safety inspection of the lightning protection facilities and outdoor wires of the whole teaching building.
Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-in.
Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.
If the circuit and wires are interrupted due to typhoon, turn off the power switch and turn on the emergency light, flashlight or candle.
Four. Safeguard measures:
After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.
Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.
Classic emergency plan for typhoon prevention in the fourth season In order to do a good job in typhoon prevention, the Emergency Plan for Hotel Typhoon Prevention is revised and issued, and all hotels are requested to follow it.
I. Organizational structure and responsibilities
The hotel set up the emergency headquarters for flood prevention and typhoon prevention. When the typhoon comes, all members of the headquarters must immediately do a good job in flood prevention and typhoon prevention and hotel duty. The organization is as follows:
Commander-in-Chief: Executive General Manager of the Hotel
Deputy commander: the general assistant in charge of safety work in the hotel.
Member units: Housekeeping Department, Catering Department, Front Office Department, Engineering Department, Security Department and Finance Department.
Second, the typhoon plan
(1) Pre-typhoon self-inspection preparation
1. Front hall: collect decorations such as banners, lanterns and POP bulletin boards at the door; Put a typhoon information bulletin board in the lobby or elevator entrance, and prepare a typhoon reminder card to the housekeeping department for distribution into the room; Prepare umbrellas and rain gear. Every employee at the front desk should know the typhoon information, answer the guests' inquiries in time, and prepare the emergency lighting at the front desk. The lobby assistant should set up a post in the lobby, do a good job of customer inquiry, pay attention to the situation at the door and lobby and report in time to ensure the normal business order of the lobby.
2. Housekeeping Department, Catering Department and Finance Department: Check and close the doors and windows of all rooms, boxes, walkways and corridors; Do a good job of typhoon prevention for guests, and inform housekeeping department to equip rooms with typhoon warning signs; Prepare emergency lighting;
3. Operator: responsible for understanding the typhoon situation and reporting to hotel leaders and relevant departments in time; Prepare emergency lighting and walkie-talkies, check whether the standby power supply of the switchboard works normally, provide emergency service for power failure under the guidance of the department manager, and do a good job in guest inquiry service.
4. All departments should prepare for the loss of linen 1 day in advance in case of emergency.
5. The Engineering Department will conduct a comprehensive inspection of the hotel periphery, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes and wooden stakes. And temporarily dismantle the unstable store. Check the important parts such as the underground electrical room, strengthen the hotel door, and cut off the circuit that may cause fire due to short circuit. The pool should be filled with water to ensure the normal supply of water, electricity and gas in the hotel, and sufficient sandbags should be prepared.
6. The comprehensive office is responsible for conveying typhoon information to all employees of all departments, and arranging the heads of all departments to stay in the store for duty.
7. The security department informs the dormitory security guards to be diligent, and cooperates with the engineering department to check whether the sewers and ditches in key parts such as the periphery and roof of the hotel are unobstructed, and prepare lighting appliances, rain boots and raincoats, helmets, flashlights and emergency lights.
(II) Review: The heads of the general office, the engineering department and the security department shall review the preparations of all departments in accordance with the above provisions.
(3) When the wind is strong, emergency procedures should be started:
1. The heads of the security department and the engineering department should stay in the hotel, deal with sudden dangers at any time, and ensure that there are enough manpower and material resources to do emergency maintenance and remedial work.
2. If there is water seepage in guest rooms, boxes, linen, drinks and food warehouses, subordinate departments should immediately transfer the contents of the rooms to a safe place, and the engineering department should do a good job of plugging and drainage.
3. The rainwater at the front door may flow backward into the lobby, and the security department and the engineering department will pile sandbags at the door to prevent the inflow. PA class is responsible for sending additional personnel to clean up the accumulated water.
4. Rain from the back door may flow back into the employee elevator. The security department and the engineering department will pile sandbags at the back door to prevent the inflow. The security guard at the back door post is responsible for removing stagnant water. If the rainwater has flowed backward into the elevator, the engineering department should immediately control the elevator to the floor above 1F, and it is forbidden to let the elevator run to-1f-2f.
5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being damaged by the wind. When strengthening, some glass doors should be properly opened to reduce the wind resistance to the glass doors. The front door glass should be the responsibility of the bellboy and the foreman of the security department. The rear door glass is guarded by the security guard at the rear door post.
6. When the wind is strong, the porter of the past security guard should pay attention to falling objects and guide the guests to park their vehicles in the underground garage. They should wear safety helmets when necessary. The desk lamp and flowerpot placed at the front desk should be put away in the front hall to avoid being blown down by the wind.
7, if there is water in the elevator, the engineering department should immediately start the drainage system, eliminate water, so as to avoid if the wind is strong and the passenger elevator can't run, the dining room screen should be pushed to the elevator.
8. In case of power failure, the Engineering Department will immediately contact the Property Office to generate electricity and restore lighting. The security department maintains the security order of the hotel during the power failure. In case of power failure, the restaurant manager is responsible for taking care of the cashier in place, and the cashier at the front desk is the responsibility of Qianmen Gang and Security Department 02 or 0 1. The assistant manager of the lobby, 0 1 02, should provide elevator service, ask if there are any detained guests and do a good job of comforting them. Floor staff and department managers should be dispersed to all floors and restaurants to explain and appease the guests.
9. When the drainage ditch is blocked, the Engineering Department and the Security Department will jointly send people to dredge it. Dredging personnel should pay attention to their own safety and must wear safety helmets. If necessary, you should wear a safety rope, and two people should cooperate with each other in tandem. Pay attention to whether the electrical equipment on the roof equipment floor has leakage.
10, when the wind is particularly strong, the office should be responsible for informing the dormitory staff not to go out, and the staff living outside the store should arrange to stay in the hotel. The heads of offices and departments should discourage off-duty personnel from leaving the hotel, and the office should make accommodation arrangements for stranded personnel.
1 1. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of various departments in time. If airports, highways and bridges are closed, they should report to the front hall in time, and the front hall should inform hotel guests in time.
12. The executive general manager of the hotel, the manager of the engineering department and the manager of the security department should stay in the hotel to make emergency preparations. Whether other department managers stay in the hotel or not shall be subject to the hotel arrangement, and if they leave the hotel, they shall be reported to the hotel administrative director for approval.
(four) after the typhoon caused hotel losses, all departments should summarize and report the losses within two days.
Classic emergency plan for safety precautions in typhoon season 5 I. Guiding ideology for typhoon prevention and disaster relief:
Under the unified leadership of Lucheng Education Bureau, the typhoon prevention and disaster relief work of our school aims at reducing the loss of national property and the safety of teachers and students, minimizing losses, effectively ensuring the safety of life and property of the school and teachers and students, and maintaining the normal teaching and living order of the school. Based on the principle of giving priority to typhoon prevention, supplemented by assistance, according to national laws, regulations and related policies, combined with the actual situation of our school, we have formulated an emergency plan for typhoon prevention.
Second, set up an emergency working group:
School typhoon prevention leading group:
Team leader: xx
Deputy leader: xx
Team member: xx
Members: all teachers
Three, the main points of flood control:
1. Teaching building, multi-function hall, canteen, gymnasium and other buildings.
2. Ensure smooth drainage inside and outside the school.
3. Strengthen the traffic guidance for students going to and from school in typhoon, rainstorm and thunderstorm weather.
4. Improve the ability of teachers and students to protect themselves from sudden weather changes (storms, thunderstorms, lightning, etc.). ).
Fourth, the preparations before the typhoon:
1. mental preparation: through various propaganda tools and forms, vigorously publicize the knowledge of flood control and disaster relief, educate teachers and students, and fully understand the significance of flood control and disaster relief. Resolutely overcome the paralysis of fluky psychology, establish the idea of "believing in what it has, but not believing in what it has" and the view of "standing if you give it, and wasting it if you don't give it", and always be ready, always be ready.
2. Organization preparation: establish the responsibility system for typhoon prevention inspection, clarify responsibilities and tasks, do a good job in safety inspection before typhoon, and make suggestions on problems and hidden dangers found in inspection. Attach great importance to typhoon prevention and disaster relief, strengthen typhoon prevention duty and safety inspection, implement various typhoon prevention measures, ensure smooth communication, and establish a supervision mechanism.
3. Work preparation: strengthen the inspection of all kinds of flood control, flood control and windproof work, rectify the problems within a time limit when found, attach great importance to school safety during the typhoon, carefully investigate various safety hazards, and ensure the safety of teachers and students' lives and property.
4. Material preparation: according to the requirements of emergency rescue in possible danger, prepare emergency materials and equipment in advance for emergency use. Strengthen the inspection and supervision of key parts of typhoon prevention, and have sufficient emergency repair force during typhoon to effectively prevent flood emergencies.
Verb (abbreviation of verb) Emergency response to typhoon prevention and disaster relief:
1. After receiving the notice from the higher authorities to prepare for emergency typhoon prevention, or according to the impending disaster caused by typhoon, the school immediately starts the typhoon prevention and relief system, arranges disaster prevention work, enters the emergency state in an all-round way, and does all kinds of emergency work well.
2. According to the actual situation of typhoon prevention and disaster relief in our school, organize the implementation of emergency response work plan, carry out typhoon prevention and disaster relief work in our school and carry out rescue operations according to the establishment of typhoon prevention and disaster relief institutions.
3. During the whole typhoon, the principals of each campus will arrange for the team members to take turns to be on duty at school, and the duty personnel and duty leaders should be in place in time. The personnel on duty should patrol the campus frequently, and report to the principals and relevant leaders of each campus immediately when finding dangerous situations.
4. Strengthen patrol on duty. In case of heavy rain and long rain, we must pay close attention to the surrounding areas of the school. Once the danger is found, it is necessary to start the relevant emergency plan in time and evacuate teachers and students.
5. Strengthen the traffic guidance for students when they go to and from school during the typhoon; Ensure smooth drainage inside and outside the school.
6. In case of danger, the building should be closed immediately and the construction should be stopped, and the teachers and students should be transferred to a safe residence in time to ensure the safety of teachers and students.
7. Post safety warnings in conspicuous places to improve the safety awareness of teachers and students.
8. Prepare classrooms for the victims in the surrounding areas.
9. In case of personal injury, property loss or serious accident, the school will report to Lucheng District Education Bureau and related departments at higher levels as soon as possible.
10. Call for help110; Fire alarm119; Medical assistance120; Traffic accident 122.
;