Current location - Education and Training Encyclopedia - Educational Knowledge - Operating hours of Hangzhou Metro Line 5
Operating hours of Hangzhou Metro Line 5
Hangzhou Metro Line 5 operates from 06: 00 to 22: 30.

Hangzhou Metro Line 5 is the fourth subway line put into operation in Hangzhou, Zhejiang Province, China. It is operated by Hangzhou Hanggang Metro Line 5 Co., Ltd., the first section of which was opened on June 24th, 20th19th, and the later section was opened on April 23rd, 2020. The line logo color is cyan.

As of September, 2022, Hangzhou Metro Line 5 starts from Jinxing Station in Yuhang District and ends at Gongqiao Station in Xiaoshan District, passing through six districts, namely Yuhang District, Xihu District, Gongshu District, Shangcheng District, Binjiang District and Xiaoshan District, with a roughly zigzag trend. As of September, 2022, the total length of Hangzhou Metro Line 5 is about 56.2 1 km, and there are 39 underground stations, with 4 motor cars, 2 trailers and 6 AH cars. The running interval of Hangzhou Metro Line 5 is 6 minutes and 50 seconds.

Historical Evolution of Hangzhou Metro Line 5

On April 23, 2020, the back section of Hangzhou Metro Line 5 (Jinxing Station to Chuangjing Road Station, Xiwenjie Station to Guniangqiao Station) was opened for operation. Due to the unfinished entrance and exit of Baoshan Bridge Station, South Station is located below the East Square of South Station. Due to the unfinished project of the East Plaza, it will not be open to the public for the time being. On June 30th, the South Station of Hangzhou Metro Line 5 was put into trial operation. On September 28th, the first underground continuous wall "WS-80" of Laoyuhang Station began to be slotted, which marked the official start of the construction of the main enclosure structure of Laoyuhang Station.

202165438+On February 8th, Hangzhou Municipal People's Government approved the renaming of Ji Xiang Miaolu Station of Hangzhou Metro Line 5. On June 26th, 2022, Ji Xiang Temple Road Station was renamed Dongxinyuan Station. On April 1 day, Baoshan Bridge Station of Hangzhou Metro Line 5 was put into trial operation. 165438+ 10 In October, the fourth phase of Hangzhou Metro was approved by the National Development and Reform Commission, including 9 projects including Wuchang Parking Lot on Line 5. In March 2023, the main structure of Nanhu East Station (project name: Laoyuhang Station) of the second phase project of Hangzhou Metro Line 5 was successfully capped.

Reference to the above content: Baidu Encyclopedia-Hangzhou Metro Line 5