Article 1: Implementation Plan for Project Construction Management
In order to strengthen the management of engineering construction projects in primary and secondary schools, clarify the target responsibility and ensure the smooth implementation of engineering construction projects. According to the requirements of the Notice of the Ministry of Education, the State Planning Commission and the Ministry of Finance on the Measures for the Implementation and Management of the Reconstruction Project of Dangerous Buildings in Primary and Secondary Schools in China, combined with the actual situation in our district, the implementation opinions on the management of school construction projects are formulated, which are expected to be implemented.
I. Organizational structure
Set up a leading group for the construction project of Anju District Education Bureau.
Team leader: Lu Jun
Deputy Team Leader: Liu Hong Peng Zhehua
Members: Yu Dingfu, Chen, Yang Jian, Zou
Each project school should set up a corresponding leading group for engineering construction projects.
Second, the project construction implementation procedures
Engineering construction project procedures must be carried out in accordance with the requirements of existing laws and regulations.
1, the project is established. Write a project application to the district education bureau by the school? The regional education bureau sent a letter to NDRC? The National Development and Reform Commission issued opinions on project approval.
2. planning. The school provides the overall planning scheme, the preliminary design scheme of the proposed building (building plan, elevation and profile) and the effect diagram to the District Planning Bureau for approval. Those who pass the examination shall apply for a planning permit (copy) and issue a red line map.
3. Report the construction situation. After handling the planning permit, apply to the construction management unit of the Construction Bureau, provide relevant materials for the construction application, and fill in the application form.
4. Survey and design. If the degree of earthquake damage is relatively light, the original design unit shall issue reinforcement measures; If the earthquake damage is serious, the design unit can issue the construction drawing only after the appraisal conclusion is issued by the unit with appraisal qualification; For new projects, the school entrusts the survey unit to issue a geological survey report, and the design unit issues a construction drawing; After the construction drawing is completed, it is necessary to go to the district fire brigade for fire control audit; Entrust the construction drawing review company to conduct the construction drawing review and issue the construction drawing review report, and then go to the construction management unit of the District Construction Bureau to conduct the construction drawing review and put it on record.
5. Bidding procedure: Determine the agency: go to the National Development and Reform Commission for online comparison and selection of bidding agencies, register the agencies online, invite relevant personnel (from the Supervision Bureau, the Development and Reform Commission, the Tendering Office of the Construction Bureau, the supervision unit of the Education Bureau, and the financial unit) to participate in the agency random selection meeting, randomly determine two agencies, negotiate with them on operating procedures and fees respectively, and determine the agencies, and report them to the Tendering Office of the Development and Reform Commission and the Construction Bureau for the record.
Bidding process: the intermediary agency or qualified cost organization will calculate the engineering quantity, and the financial evaluation will determine the control price and bill of quantities (the school will write an evaluation application to the Education Bureau, and the Education Bureau will send a letter to the Evaluation Center of the Finance Bureau, which will accept it within 25 working days. Control price and bidding list must be based on financial evaluation conclusion), making bidding (comparison) announcement, filing bidding documents (NDRC and Construction Bureau), publishing bidding announcement or comparison announcement online, registering and issuing bidding documents, inviting relevant departments (Disciplinary Committee, NDRC, Bidding Office of Construction Bureau, supervision of Education Bureau, relevant personnel of financial planning unit) to participate in bid opening, bid evaluation supervision, announcement of bid evaluation results, issuance of bid-winning notice, and issuance or issuance by the construction unit.
6. Construction stage: make sure that the supervision unit signs the supervision contract, go to the Tendering Office of the Construction Bureau to bid for the record, go to the construction management unit of the Construction Bureau to handle the construction permit (provide the materials list as required and pay the relevant fees), go through the quality and safety supervision procedures (pay the supervision fee of 3.5% of the bid price), pay off the work of the Planning Bureau, start construction, coordinate the construction quality, progress, safety supervision and various relationships, and conduct the initial inspection and final acceptance.
Third, the project fund management
The project implements the county-level reimbursement system and pays the project amount according to the engineering quantity. The use of special funds for the project includes all expenses such as planning fees, design fees, geological prospecting fees, supervision fees, various fees, project funds, increase or decrease of engineering quantities and liquidity, and shall not exceed the upper limit. Unauthorized expansion of construction scale and improvement of construction standards shall be handled in accordance with relevant state regulations.
Strict contract management. A project subject to tender must conclude a written contract in accordance with the tender documents and the bid documents of the winning bidder, and no other agreement that deviates from the substantive contents of the tender documents and the bid documents of the winning bidder shall be concluded separately. The contract shall be sent to the District Development and Reform Commission and the Bidding Office of the District Construction Bureau for the record. Need to sign other agreements, before signing, led by the project construction leading group, in conjunction with the district supervision, development and Reform Commission, bidding office, finance, auditing and other departments to discuss and agree to form a meeting minutes, as the basis for signing other agreements. Without the joint decision of the above-mentioned units, and the adjusted unit price violates the bidding results, other agreements concluded are invalid.
Fourth, the project quality and safety management
The project quality is the key to the success or failure of the project construction, and the quality directly affects the application after the project is completed. The quality of engineering construction affects the reputation and benefits of construction and construction units. Controlling the quality of engineering construction is the focus of attention and the common responsibility of all parties. As a construction unit, we should take quality control as the center, always take project quality as the focus of project construction management, consciously accept the supervision and inspection of quality supervision institutions, coordinate the relationship between design, supervision and construction units, and achieve the goal of controlling project quality through controlling all links such as project planning, design quality, bidding, examination and approval of major technical schemes, quality control in construction stage and information feedback. Supervise and manage the construction quality and safety of the construction unit in strict accordance with laws and regulations and relevant technical standards, design pieces and construction project contracts, and urge the construction unit to carry out the construction according to the drawings. The supervision unit should earnestly perform its duties and resolutely put an end to unsafe construction behaviors. Refuses to correct, be punished in accordance with the contract and the relevant provisions, and report to the relevant departments.
During the implementation of the project, the Education Bureau will send inspection teams to conduct inspections from time to time and report the inspection results. In the following stages, the project construction leading group will participate in: foundation trench inspection, initial inspection and completion acceptance.
Verb (abbreviation of verb) engineering change management
The following provisions are made for the change procedures in the implementation process.
1. When the construction unit proposes a design change to the project, it shall propose a change plan together with the supervision engineer and submit it to the design unit for review; After examination and approval by the design unit, it must be approved by the competent education department, and the supervision engineer will issue a notice of change to the construction unit, which will organize the construction according to the changed drawings.
2. The design changes proposed by the construction unit shall be approved by the supervision engineer, reviewed by the design unit and approved by the construction unit before implementation. If the construction period is increased or decreased, both parties shall reach a written agreement in advance. However, due to the need to organize the construction, the construction unit will bear the increased costs.
3. During the construction, if the design drawings are wrong or the geological conditions change and need to be changed, the design unit will put forward a change plan. With the consent of the construction unit's visa, the construction unit will organize the construction according to the instructions of the supervision engineer after obtaining the revised drawings, and the increased expenses will be borne by the construction unit, and the delayed construction period will be postponed.
After the above procedures are perfected, all changes shall be approved by the project construction leading group and put on record.
Strengthen accountability. If there is fraud or irresponsible work in the engineering change and concealed engineering visa, which leads to the loss of engineering construction funds, the relevant personnel shall be investigated for responsibility. The information that should be preserved is not properly preserved or the supervision, design, intermediary institutions and other units resort to deceit, and shall be punished in accordance with the relevant provisions of the state.
Six, project settlement management
The total engineering quantity includes the following parts: ① Fixed part: all the contents of the bill of quantities in the tender; (2) Increase or decrease: it has changed according to the owner and design requirements, which has affected the increase or decrease of engineering quantity; (3) Subsidiary and supporting works. When both parties verify the engineering quantity, it must be signed by the construction, the construction and the owner and reported to the project construction leading group for signature, which can be used as the basis for calculating the project cost.
After all the quantities are determined, the settlement book of the construction project cost recognized by both parties shall be compiled, and all the relevant information of the project cost shall be sorted out. The school will submit the project construction leading group for audit, and the audit results will be submitted to the district audit bureau for audit. The final project payment is paid by the audited project cost, and the financial department executes it according to the audited total project cost.
Seven, engineering data management
Complete engineering technical archives and construction management data are important basis and information resources for engineering construction and management, and are also necessary conditions for the completion acceptance and smooth delivery of construction projects. See the file list of the District Construction Bureau for details of the project construction file filing.
Eight, engineering disciplines
Supervise and urge all units involved in the project construction to standardize the construction behavior, strengthen the integrity and self-discipline of employees, put an end to violations of discipline and law, make specific commitments to ensure the integrity and efficiency of the project construction, and widely accept the supervision of the masses and all parties. Strictly implement the bidding procedures to be open, fair and just? Sunshine operation? , put an end to unfair competition. Make it an economic project, a safety project, a practical project and a clean government project.
During the implementation of the project, it will be subject to special inspections by supervision, development and reform commission, finance, auditing, education and other departments. If violations of law and discipline are found, they will be dealt with in accordance with relevant regulations; If the circumstances are serious, it will be handed over to judicial organs for handling.
Part 2: Software System Project Implementation Plan
Building xxxxxxxxxxx software procurement is a complex and long-term system engineering. In order to ensure the smooth implementation of the project, it is necessary to make a scientific, reasonable and feasible implementation plan. On the one hand, it should be implemented organizationally, and a strong project leading group and experienced project implementation team should be established; On the other hand, it is necessary to make a strict timetable and specify the time of each milestone. At the same time, it is necessary to formulate working principles to guide the full implementation of the project.
I. Principles of Project Implementation
1. User project team members try to participate in the whole process of the project.
The user side set up a project team headed by the leader himself, and cooperated with the system developers in various stages such as research, design, coding, installation and debugging, testing, training, operation, acceptance and after-sales service. On the one hand, you can cultivate your own technical maintenance team to protect the use of the system; On the other hand, in the development process, coordinate the relationship between users and developers, ensure the smooth progress of the project, find problems in time, and supervise the progress and quality of the project.
2. Adoption? Grab your hands? Policy focuses on development and utilization.
For a software project, it is called a project to a great extent because of the construction of the software project. Besides technical factors, there are many non-technical factors that need to be considered and must be taken seriously. To measure the success of a software project, to a great extent, it depends not on how advanced technology the software project adopts, but on whether the software is practical for users and can help users solve many expected problems. The failure of many domestic software projects is largely due to insufficient use. It is suggested that during the trial operation of the project, we should pay close attention to the use of the system while paying attention to the maintenance of the system. Developers and users should work together to help business personnel switch from the original manual processing to computer-aided processing, find out the problems existing in the system as soon as possible when business personnel adapt to computer-aided business processing, and complete the system on time with good quality and quantity as much as possible.
3. Data is as important as procedure.
In the construction of the system, data is in the primary position, and the completion of the program only means that the system is half finished. The collection, arrangement and input of data are equally important for the construction of the system. In the process of project implementation, we must attach importance to data entry in the system, fully estimate the difficulty of data processing, put data work on the agenda at the beginning of system construction, arrange corresponding funds and time, and implement data work. Only in this way can the system be put into practical use as soon as possible.
Second, the overall promotion plan of the project
In order to effectively ensure the quality of system development, the whole process of system construction is divided into preparation, design, development, implementation and operation stages, and each stage completes corresponding tasks to ensure the construction of information system.
1. Description of quality assurance activities during system implementation.
The major quality assurance activities that will occur in the implementation process or the resulting quality records and products, project management is closely related to the division of development stages, so it is mainly explained according to the specific stages of project implementation.
2. Demand analysis stage
First of all, it is necessary to coordinate with both parties to form a demand research plan and a demand research outline, and determine the content, methods, personnel and progress of the preliminary preparation work, and then conduct research according to this plan after the consent of both parties. Before the formal investigation, the project development team should check whether all necessary preparations have been successfully completed.
According to the actual technical requirements of the system and the business requirements of each subsystem in the investigation, the project development team prepares and submits the system requirements analysis report to the engineering leading group, which will be reviewed by the project team, and the unqualified parts will be further improved. After the review is passed, both parties will jointly sign the review opinions, which will take effect.
For the software production process, the requirement stage is the most important stage in the whole process, and the result of requirement analysis will directly lead to the success of the project, so the investment of both parties at this stage is worthwhile. Moreover, once the review passes and takes effect, the demand report will become one of the basic basis for system design, development, testing, trial operation and project acceptance. Therefore, in principle, users' needs will not change due to changes in other factors. If changes are needed, they must be determined by the project leaders of both parties through consultation.
3. Overall design stage
By analyzing the function, operation and performance requirements of the system, the project development team generates the high-level design of system structure, software structure, interface and data format, submits the system design report (including database design) to the engineering leading group, and organizes the review and signs the review opinions. Further improve and re-plan the unqualified parts. After the review is passed, both parties will jointly sign the review opinions, which will take effect as the basis for subsequent software development and testing. Changes in the contents of this report can be determined by the on-site implementation leaders and technical leaders of both parties, and reported to the engineering leading group.
4. Detailed design stage
On the basis of the system design report, the project development team further analyzes and refines the functional and performance requirements, forms a detailed software design document, submits the detailed system design report to the engineering leading group, and the project team organizes the review and signs the review opinions. Further improve and re-plan the unqualified parts. After the review is passed, both parties will jointly sign the review opinions, which will take effect as the basis for subsequent software development and testing. Changes in the contents of this report can be determined by the on-site implementation leaders and technical leaders of both parties, and reported to the engineering leading group.
5. System development stage
According to the preliminary design results, the site implementation leaders and technical leaders of both parties discuss and determine the detailed development plan, and submit the project development plan to the engineering leading group; The project development plan will be reviewed by the engineering leading group and come into effect after being signed by both parties, and will serve as the basis for project management and monitoring in the software development stage. The project development team should strictly control the project progress according to this plan and report the work progress to the engineering leading group on time.
In order to let users know the progress of the project in time, the development team needs to submit the weekly project customer report to the relevant leaders of users, and the user project team can check the work of the project at any time.
Chapter 3: Creating Project Implementation Plan
I. Overview of the Project
(A) the basic situation of the project construction
1. Project Name: Creation Project of High-yield Demonstration Film of Wheat in Zhaocun, Liushipu Town.
2. Construction unit: Yingshang County Sweet Potato Planting Professional Cooperative.
3. Project legal person: Zhu Liang
4. Competent unit: Yingshang County Agriculture Committee Yingshang County Finance Bureau
5. Proposed location: Liushipu Town, Yingshang County.
6. Main construction contents of the project: ① purchase large-scale translational sprinkler irrigation equipment with integrated water and fertilizer; (2) purchasing underground pipelines; (3) Buy underground cables and nozzles, electric water meters, etc. ; (4) purchasing underground pipelines; ⑤ Installation of rural power facilities; ⑥ Purchase tractors, rotary cultivators, subsoilers and other supporting equipment; All landowners purchase and construction of other supporting equipment.
7. year of construction: 2065438+February 2004? 20 14 12 months.
8. Construction objective: To build a demonstration plot of wheat with high yield of 10640 mu, with the yield index of 600 kg per mu, jointly implement land transfer and intensive management within the county with large growers, and build a breeding base for wheat varieties with order production of 30,000 mu, including 6,000 mu of land transfer. Build a marketing service system. Directly employed 40 people and benefited more than 3,000 people.
9. Expected benefits: After the completion of the project, the comprehensive annual income will be 2 million yuan through the establishment of high-yield wheat, improved seed breeding and base promotion. After the implementation of the project, 40 workers can be directly absorbed, benefiting more than 3,000 people, and the average household income is more than 2,000 yuan. In addition, it can also activate the development of other related industries, and the comprehensive economic benefits are considerable. It can form a certain radiation effect on the surrounding areas, and its coverage capacity and scope reach the surrounding townships (towns) of Liushipu in Yingshang County.
(II) Project Construction Background
Wheat has wide adaptability, strong reproduction, simple cultivation, low investment, high yield and stable harvest, and is the main crop in our county. In recent years, with the continuous progress of agricultural science and technology and the popularization and application of new wheat planting technologies, the wheat yield has been continuously improved. In order to further develop the wheat planting industry and drive farmers in the project area to become rich and well-off, the cooperative plans to build a high-yield wheat demonstration film in Zhaocun, Zhenzhen, Yingshang County.
(III) Necessity and basis of project construction
1, National Industrial Policy: The No.1 Document of the Central Committee for six consecutive years has placed the application of new agricultural technologies and grain production in a very important position. In 20 14, the State Council issued "the State Council's Opinions on Accelerating the Development of Modern Crop Seed Industry" (Guo Fa [2065438+04] No.8 document), and the Anhui provincial government immediately issued corresponding documents to push the development of seed industry to a strategic height.
2. Resource advantages: Since the establishment of the cooperative, relying on Fuyang Yongxiang thoroughbred service Co., Ltd. in Anhui Province, the main business is the application of new agricultural technologies and the breeding of improved varieties. Guided by the demonstration garden and driven by the processing plant, a breeding base of more than 20 thousand mu of high-quality wheat and improved wheat varieties (original seeds) has been established. The annual output of improved varieties is more than 20 million Jin. This base can drive more than 8,000 farmers, with annual income per household 1.200 yuan and per capita income in 200 yuan. In 20 14, the company promoted 27 new varieties and technologies, with an area of 65,438+10,000 mu in five surrounding towns, creating social benefits of more than RMB 1 100 million. At the same time, the company also vigorously develops organic products in the base. In 20 13, the company applied for organic product certification with the association as the main body, and was officially certified in 20 13. At present, the company is guiding the base to cultivate excellent varieties, and at the same time guiding and driving the planting of organic products, so that the company's organic production can form a scale and form a benign industrial chain.
3. Effect of economic development and farmers' income increase: After the completion of the high-yield wheat demonstration film in Zhaocun, Liushipu Town, it can drive farmers in the project area and surrounding areas to develop wheat planting and increase farmers' income. Wheat planting is the pillar of foreign exchange-earning agriculture, with less input and more output, saving labor and time, wide use and easy processing. The establishment and improvement of wheat breeding and extension system and the improvement of wheat yield will also effectively promote the rapid development of grain industry, medicine industry, wine industry and food industry.
Second, the construction content
(1) Purchase large-scale translational sprinkler irrigation equipment with integrated water and fertilizer; (2) purchasing underground pipelines; (3) Buy underground cables and nozzles, electric water meters, etc. ; ④ Purchase pumps and pipes; ⑤ Installation of rural power facilities; ⑥ Construction of electronic microcomputer management room (70m2); ⑦ Purchase supporting equipment for the Internet of Things; ⑧ Other supporting equipment.
Third, the project market analysis
1. Through high-yield demonstration of wheat, improved seed breeding and base promotion, the comprehensive annual income of the project is 4 million yuan.
2. The wheat market is very broad, and it is the most widely distributed food crop in China. It has been an important food for nourishing the human body since ancient times. Materia Medica records:? Wheat flour, tonic, strong skin, thick belly and great strength. ? Wheat contains about 75% carbohydrates, and protein accounts for about 10%. Herbal rejuvenation divides its functions into four categories: nourishing heart and kidney, promoting blood circulation and strengthening spleen. Outline of medical forest: In addition to annoying, stopping bleeding, promoting urination and moistening lung dryness, eating unrefined wheat can also relieve menopausal syndrome for menopausal women.
3. Market positioning and competitiveness of main products after China's entry into WTO. Among the seven best-selling products in the international market, wheat accounts for two kinds: one is wheat flour, and the other is medicinal, miniature and characteristic wheat. Therefore, the breeding of improved wheat varieties and the development of production bases have broad market prospects. The company actively adopts it? Integration of agriculture, industry and commerce, one-stop production, supply and marketing? Industrialization comprehensive marketing strategy, adhere to the development model of high-yield research strategy, benefit priority strategy, brand promotion strategy and stimulus source strategy.
Fourth, work measures
(A) to strengthen leadership, careful organization
The implementation plan of this project has strong policy, which is related to the vital interests of farmers in the county. In order to strengthen the organization and management, ensure that the implementation of the program is in place according to quality, quantity and time, so that farmers can really get benefits. After research by the cooperative, it was decided to set up a leading group for the creation of high-yield wheat demonstration films in Zhaocun, Liushipu Town, with Zhang Jixian as the team leader and project manager as the deputy team leader. There is an office under the leading group, and Zhu Liang is the director of the office. The office is located in the cooperative office building, responsible for the organization of project implementation plan, the management and daily affairs of engineering design, construction, supervision, equipment purchase and procurement during the project construction.
(B) strict project management
In the project construction, we will establish and improve the project management system according to the management methods of the higher authorities and the actual situation of our agency, so as to institutionalize and standardize the project management.
1, project legal person responsibility system. As the legal person in charge of the project, the chairman of the cooperative is fully responsible for the implementation and management of the project, and is responsible for the planning and design, project progress, project cost, financial management and fund use of the construction project.
2. Strict financial management. In the process of project implementation, the project fund management is carried out in strict accordance with the relevant provisions of the higher authorities such as Yingshang County Agriculture Committee and Yingshang County Finance Bureau. Unified planning, unified management and unified distribution are implemented for the whole project funds, and a financial management system with special accounts and special personnel in charge is established for special purposes. It is strictly forbidden to occupy, misappropriate or intercept funds. Implement the reimbursement system, examine and approve the construction funds one by one in strict accordance with the project investment plan and construction progress, check the fund activities regularly, and deal with the problems found in time to ensure the rational use of special funds and produce the greatest investment effect.
3. Strictly control the project quality. First, adhere to the principle of exploration, design and construction, and urge the construction unit to carry out construction in strict accordance with the construction standards of design drawings, and urge the construction unit to establish and improve the project quality assurance system, the on-site project quality self-inspection system, and the quality pre-inspection and re-inspection system for important structural parts and concealed works. The second is to implement the project supervision system. According to the relevant laws, regulations, standards and technical specifications of project construction and supervision, the county project leading group selects supervisors to track and manage the project quality, investment and use, construction progress and other contents. The third is to strictly control the quality of the project, strictly examine the project cost and quality, and consciously accept the supervision and inspection of the county commission for discipline inspection, the county audit bureau and the higher authorities. After the completion of each project, the company will organize relevant units to conduct self-inspection, and the project settlement will be rejected by quality. Put forward rectification requirements for unqualified items and rectify within a time limit; Evaluate the qualified projects scientifically, reasonably and legally from the aspects of project overview, availability of funds, use and financial management, civil engineering, equipment purchase, system construction, operating procedures and files, project implementation and operation, project benefits and construction effects, and write the completion acceptance report to meet the acceptance.
Verb (abbreviation for verb) matches funds.
1. Investment estimation: The total investment of the project is 567,500 yuan, the financial investment is 500,000 yuan, and the cooperative raises 67,500 yuan.
Benefit analysis after the completion of intransitive verb project
economic interest
After the completion of the project, the company organized poor farmers to participate in the base production by means of high-yield wheat creation, improved seed selection and base promotion, with an annual comprehensive income of 2 million yuan. As a result, the company can directly absorb 40 workers, benefit more than 3,000 people, and increase the average household income by more than 2,000 yuan.
(2) Social welfare
It can activate the development of other related industries and has considerable comprehensive economic benefits. It can form a certain radiation effect on the surrounding area, and its coverage capacity and scope reach the surrounding township (town) of Sanshipu, Yingshang County.
(3) Ecological benefits
The project construction will greatly promote the development of improved wheat planting, and then promote the development of related industries. This project is a project of wheat seed breeding and base promotion, which will not affect the ecological environment.