What are the building safety regulations?
I. Data classification

1. As a construction site involves multiple safety divisions, the classification of safety data is an important link in data management. According to J(G)J59-99 safety inspection standard, building safety data can be classified as follows:

(1) Safety Management Department

(2) civilized construction division

(3) Scaffolding Division

(4) Division of foundation pit support

(5) Template Support Division

(6) Three Treasures and Four Ports Protection Zones

(7) Construction electricity division

(8) Material hoist and external elevator division

(9) Tower Crane Division

(10) Lifting Division

(1 1) Construction Machinery Division

(12) Other information

2, due to the diversity of construction technology, so the safety technical data can also be classified by partial items, such as scaffolding, a construction site may have many types of scaffolding, such as floor-standing scaffolding, cantilever scaffolding, portal scaffolding, suspended scaffolding, hanging basket scaffolding, attached lifting scaffolding, etc. Scaffolding division can set up floor-standing external scaffolding division and cantilever scaffolding division.

3. According to J(G)J59-99 safety inspection standard, the safety data of each division (sub-division) can be divided into two parts, one part is the guarantee project part, and the other part is the general project part.

Second, the arrangement of information. The first item? Safety management part

1, part of the guaranteed project

(1) enterprise, project department's safety responsibility system, economic contract, safety technical operation procedures for main types of work on site, safety guarantee system for construction site, safety officer's work license, safety officer's appointment documents, and assessment of management personnel's responsibility system, etc.

(2) Single project safety management objectives, safety responsibility system decomposition measures and decomposition, safety responsibility target assessment regulations, safety responsibility target assessment, etc.

(3) the construction organization design of the unit project, the single construction scheme with strong professionalism, etc.

(4) Safety disclosure system, safety disclosure implementation record, etc.

(5) Regular safety inspection system, safety inspection records, implementation records of safety hazard rectification, and rectification of matters listed in the notice of safety hazard rectification, etc.

(6) Safety education system, new workers' three-level safety education registration form and three-level education card, new workers' safety education records, job change safety education records, safety technology operation procedures training records, construction management personnel training records, full-time safety officer annual training records and assessment registration, etc.

2. General project part

(1) pre-shift safety activity records, pre-shift safety activity records, etc.

(2) Registration form of special operations personnel, employment certificate of special operations personnel, etc.

(3) industrial accident reporting procedures, industrial accident files, industrial accident handling records, etc.

(4) Layout of safety signs on the construction site, records of safety signs on the construction site, etc.

The second item? Civilization construction Chu

1, part of the guaranteed project

(1) The enclosure on the construction site shall be provided with a plan, a section and instructions on the use of materials.

(2) The guard system, the regulations for the personnel on the construction site to wear work cards, and the schematic diagram of the gate and head of the construction site, etc.

(3) Schematic diagram and practice details of roads and drains on the construction site, measures to prevent mud and sewage from flowing out, measures to prevent sewer blockage, on-site greening measures and schematic diagram, etc.

(4) Schematic diagram of building materials stacking, classification management system of material list, cleaning system of construction site, regional health contracting system, etc.

(5) On-site temporary residence erection scheme and measures, schematic diagram of functional area division on the construction site, dormitory thermal insulation measures, dormitory heatstroke prevention and mosquito prevention measures, dormitory health management system, etc.

(6) Schematic diagram of on-site fire-fighting pipe network and fire-fighting facilities, examination and approval system and procedures for hot work on the construction site, monitoring system and records for hot work on the construction site, and fire management system on the construction site, etc.

2. General items

(1) Public security system, decomposition measures of public security responsibility system, records of comprehensive management of public security on site, etc.

(2) Schematic diagram of construction site signs and setting system.

(3) Sanitary management system for toilets and kitchens on the construction site, sanitary responsibility system for toilets and kitchens, and domestic garbage disposal regulations, etc.

(4) Health and disease prevention publicity and education records, first-aid measures, list of first-aid equipment and medicines, list of health first-aid personnel, employment certificates, etc.

(5) Dust and noise prevention measures, night construction management regulations, and construction measures that do not disturb people? Scaffolding division 1, warranty project part (taking scaffolding sub-division outside the floor as an example)

(1) Construction scheme, scaffold design calculation, etc.

(2) Schematic diagram of scaffold upright post foundation setting, drainage measures and scaffold foundation schematic diagram, etc.

(3) Schematic diagram of Rachel between scaffold frame and building, etc.

(4) Schematic diagram of scaffolding bracing setting, etc.

(5) Schematic diagram of scaffold board setting and protective railing setting, etc.

(6) scaffolding construction technical disclosure, scaffolding section acceptance sheet, etc.

2. General items

(1) Small bar setting diagram, etc.

(2) Schematic diagram of bar overlap.

(3) The enclosed measures in the frame and the schematic diagram of enclosed settings, etc.

(4) scaffolding material certificate and inspection report, etc.

(5) Measures and schemes for setting up the upper and lower passages in the frame.

(6) The erection scheme, design and calculation of the unloading platform, the schematic diagram of the connection between the supporting system of the unloading platform and the scaffold, and the load limit regulations of the unloading platform, etc.

3. The construction scheme and calculation shall be approved, and the construction scheme shall be instructive to the site construction.

4, scaffolding material certificate should be consistent with the actual use of materials on the construction site, and the quality of materials should meet the specification requirements.

5, according to the actual situation, the bar lap, etc. , if the text can't be said, you can use the icon.

6, scaffolding acceptance should have quantitative acceptance content.

The fourth item? Foundation pit support branch

1, guaranteed project

(1) Foundation construction support scheme, special support design, etc.

(2) limb protection measures, etc.

(3) Sloping measures such as pit and groove excavation.

(4) No drainage measures for foundation pit, measures to prevent settlement of adjacent buildings, etc.

(5) the provisions of the pit stacking.

2. General items

(1) Setting measures such as upper and lower passages of foundation pit.

(2) Construction machinery entry acceptance record, excavator operator license, excavator operation procedures, etc.

(3) Deformation monitoring system of foundation pit and settlement observation records of adjacent buildings, etc.

(4) Isolation measures for vertical operation of foundation pit, lighting setting measures for deep foundation pit, etc.

3, the construction plan should be targeted to guide the construction; The construction scheme can only be used for construction after it is approved by relevant departments.

4, deformation monitoring of foundation pit support, to a person, instrument, measurement data should be accurate.

Item 5? Template division

1, part of the guaranteed project

(1) template engineering construction scheme, etc.

(2) Design and calculation of cast-in-place concrete formwork support system.

(3) Material certificate of the column supporting the formwork, column setting diagram, etc.

(4) Management regulations for stacking on templates, etc.

(5) Anti-tilting measures for template storage and management regulations for template storage, etc.

(6) Template removal scheme, template removal monitoring management regulations, etc.

2. General project part

(1) template demolition application and approval report, template engineering acceptance procedures, template engineering technical disclosure, etc.

(2) Concrete strength report before form removal, etc.

(3) Concrete transportation road erection measures, etc.

(4) Protective measures for the entrance and limb of the working face, isolation measures for vertical operation, etc.

3, the construction plan should be targeted to guide the construction; The construction scheme can only be used for construction after it is approved by relevant departments.

4, template engineering acceptance procedures should have quantitative content.

Item six? "Three Treasures" and "Four Ports" Protection Section

1, safety helmet certificate and test report, safety helmet wearing standard and safety wearing management regulations, etc.

2, building lateral sealing measures, safety net material certificate and test report, safety net certificate, etc.

3, seat belt use regulations, seat belt certificate and test report, etc.

4, the mouth of the cave, limb protection measures, protective shed erection measures, erection of material certificate, etc.

5. For standardized and instrumented protection facilities, the installation and use methods shall be explained.

Item 7? Ministry of construction and electric power

1, part of the guaranteed project

(1) external protection measures

(2) Setting measures of grounding and neutral protection system, etc.

(3) Setting measures such as distribution box and switch box.

(4) On-site lighting facilities setting measures, etc.

2. General items

(1) distribution line certificate and test report, line erection measures, etc.

(2) Electrical installation measures, certificates and test reports of various electrical equipment and switches.

(3) Setting measures such as power transformation and distribution equipment.

(4) Construction electricity scheme, records of shaking measurement of earth resistance, and records of electrician's patrol maintenance, etc.

3, the construction plan should be targeted to guide the construction; The construction scheme can only be used for construction after it is approved by relevant departments.

4, all kinds of electrical equipment should not only have a certificate, and all kinds of equipment parameters to adapt to the specification requirements.

Item 8? Material hoist and external elevator branch 1, guarantee the engineering part (take the material hoist branch as an example)

(1) Frame design calculation, frame certificate and test report, building safety management license, etc.

(2) Setting measures of limit safety device and certificate of limit safety device, etc.

(3) Cable wind rope setting measures, cable wind rope certificate and test report, frame body and building connection measures, etc.

(4) Management regulations on wire rope scrapping, wire rope maintenance, wire rope certificate and test report.

(5) The building measures of the landing discharging platform and the protective measures on both sides of the discharging platform, etc.

(6) Regulations on hanging basket safety management, hanging basket finalization and instrumentalization measures.

(7) hoist safety acceptance certificate, etc.

2. General items

(1) Frame installation and demolition construction scheme, frame foundation setting scheme, external protective measures, etc.

(2) Hoist installation scheme, etc.

(3) Contact signal equipment management system, signal contact responsibility system, etc.

(4) Hoist operation shed erection measures, etc.

(5) The lightning protection setting scheme for the frame, etc.

3, the construction plan should be targeted to guide the construction; The construction scheme can only be used for construction after it is approved by relevant departments.

Item 9? Tower crane branch

1, part of the guaranteed project

(1) tower crane limit equipment setting scheme, tower crane installation scheme, tower crane installation team qualification certificate, tower crane qualification certificate and instruction manual, etc.

(2) Driver's license and tower crane signal contact diagram, etc.

2. General project part

(1) tower crane subgrade and track construction scheme, tower foundation construction scheme, etc.

(2) Tower crane electrical construction scheme, etc.

(3) Anti-collision measures for multi-tower operation, etc.

(4) Installation acceptance certificate, etc.

3, the construction plan should be targeted to guide the construction; The construction scheme can only be used for construction after it is approved by relevant departments.

Item 10? Lifting and hoisting branch

1, part of the guaranteed project

(1) hoisting operation scheme, etc.

(2) Acceptance procedures for hoisting machinery entry, crane application certificate, crane installation acceptance certificate, jib design calculation, etc.

(3) Wire rope certificate and test report, ground anchor scheme, etc.

(4) Lifting point setting scheme, etc.

(5) Driver's license, commander's license, aerial work signal transmission scheme, etc.

2. General project part

(1) Ground laying measures such as cranes.

(2) Regulations on crane limited load operation and trial hoisting management.

(3) Anti-adhesion measures such as structural hoisting.

(4) Erection scheme of hoisting operation platform, etc.

(5) Stability measures for stacking large components.

(6) Implementation schemes such as hoisting and warning.

(7) Rigger and welder's work license for safe operation, etc.

3. The operation plan and design calculation should be approved by relevant plans, and the construction plan should be targeted to guide the construction.

Item 1 1? Construction machines and tools 1, construction machinery entry acceptance procedures, construction machinery regular inspection scheme, construction machinery installation acceptance certificate, special machinery license, construction machinery electrical installation scheme, construction machinery certificate, etc.

Item 12? Other materials 1, safety production related documents, safety production related notices, safety meeting minutes, safety supervision regulations, safety construction permits, etc.

Three. Matters needing attention in sorting out safety management data

1, the arrangement of safety data should be true, and forgery is not allowed. The construction plan should be targeted and consistent with the engineering entity.

2. The safety information visa must be authentic and may not be signed by others.

3. Various certificates must correspond to the materials used on site.