1. Power safety self-inspection report
In our business hall, the internal safety officer of the company's business hall conducted a comprehensive self-examination of the safety situation of our business hall according to the instructions of the superior, and checked the major hazard sources and related accounts. The self-inspection is now reported as follows: 1. Self-inspection of major hazard sources:
65438+ 10 to 65438+ 10 to 3 1, the business of our business hall is normal and orderly, but the security officer of our business hall still adheres to the principle of "three-no-let-go" and has conducted a comprehensive inspection on the management of bills, documents and cash in recent months. The focus of this inspection is the management of bills and cash. According to the particularity of this business hall, bills, documents and cash have been managed by special personnel respectively, and cash will be deposited in the bank on the day of collection; Documents and bills should be put into storage every day and recorded when they are collected.
Second, the production safety account:
The safety officer of this business hall carefully examines the safety production account of this office.
(1) Whether the signing of the responsibility system for production safety is recorded and whether the assessment is fulfilled;
(2) Whether the workers' labor protection articles are distributed on time and recorded;
(3) Whether the employees violate the rules and whether there are records;
(4) Whether the safety education, training, assessment and certification of employees are recorded;
(5) Whether the safety production meeting is listed and recorded;
(6) Whether employees are organized to conduct safety learning and whether there are records;
(7) Whether the on-site safety inspection records the hidden dangers of accidents and the rectification;
(8) Whether the equipment safety management is recorded;
(9) Whether the production meeting of the safety team is recorded. Waiting for approval one by one.
Three. Equipment and facilities:
Whether the business hall has warning signs for dangerous points in the hall, whether it is equipped with fire extinguishers and whether the anti-theft facilities are perfect. The inspection passed.
Fourth, the development of the program:
This business hall has formulated emergency plans and rescue measures for safety accidents, management system of labor protection articles, bills, documents, cash management system, safety system and post responsibilities according to the company's management measures.
Verb (abbreviation of verb) Signing the responsibility book of this business hall:
The company's safety management committee signed a letter of responsibility for production safety with the county safety supervision bureau; The company and the director of this business hall sign the responsibility letter for production safety; The director of this business hall and the members of this business hall shall sign a letter of responsibility for production safety.
Our business hall adheres to the principle of "safety first, prevention first". According to the company's safety system, the management has formed a good momentum that the company leaders attach importance to it, the directors and members of the business hall are responsible, all levels attach importance to safety, stress safety every day, and educate employees with examples, so that every employee can understand the truth that "safety guarantees life and safety can produce benefits".
To sum up, our business hall will continue to improve the safety management system in the future. With the care and support of the superior departments, the correct leadership of the company leaders and the continuous efforts of all employees, we firmly believe that the company's safety work will be better year by year.
2. Power safety self-inspection report
In order to further strengthen the construction management, effectively eliminate potential safety hazards, and prevent and reduce the occurrence of safety accidents, our team organized all employees to learn the spirit of the document in June 165438+ 10/2 according to the requirements of the notice on safety inspection (inspector) of key projects under construction issued by the company. June 5438+065438+1October 65438+March, our team organized a comprehensive and serious safety hazard inspection on the construction site. The results of self-inspection are summarized as follows: 1. Problems found.
1, workers can consciously wear safety helmets when entering the construction site, but individual workers have poor safety awareness, which needs to be constantly emphasized by management personnel in the process;
2, workers pay attention to the winter construction heating safety, to prevent gas poisoning accidents;
3. Large machinery. The operation and command in the operation should be standardized;
4. Vehicle inspection should be in place.
Second, the problem analysis
Reason: The managers and some workers of the construction team are not strong enough in safety awareness and weak in self-protection.
Third, the rectification measures
1, improve the system and strengthen management.
(1), improve the safety and civilized management system, establish and improve the safety and civilized management system, safety and civilized management institutions and safety and civilized production responsibility system are important contents of safety and civilized management, and are the organizational guarantee for realizing safety and civilized production management. And formulate the responsibility system for safe and civilized production of each construction team, and strictly define the responsibilities. Our electric power and substation team has set up a standardized management leading group to ensure safety and civilization from top to bottom.
(2) Establish a system of regular safety meetings: hold regular meetings at the construction site to analyze the situation of safe and civilized production, grasp the development trends of safe and civilized production, study and solve outstanding problems in safe and civilized production, and ensure safe and civilized production.
③ Management by objectives: Implementing management by objectives is an effective measure to strengthen managers' awareness of safety and civilization, improve the level of safety and civilization management and construction, and ensure the safe, efficient and civilized construction of construction projects. According to the relevant regulations of the superior and the actual situation in construction, the safety management objectives are formulated step by step. All employees in the team and the construction team will closely focus on this goal and carry out their respective work rigorously.
(4), pay attention to the safety information, requirements to be timely, accurate and complete.
2. Strengthen safety education and raise safety awareness.
(1), firmly grasp the policy of "safety first, prevention first, comprehensive treatment", and under no circumstances can you relax your mind and keep your goal unchanged. Adhere to the unremitting efforts of safety ideological education, combine the actual situation of the team, publicize the relevant national safety production principles and policies through various channels, and improve the safety awareness of all staff.
(2), construction personnel insist on regular safety production technology training, and establish safety education and training records. Special operations personnel shall not engage in special operations without training and certification from the competent department.
3. The management of our team will increase the number of safety inspections, and each construction team will conduct daily safety hazard investigation, strengthen communication, report the inspection situation to the superior in time when problems are found, and better guide the safety production work.
Safe construction benefits the country and the people. In the construction process, we put safety first, so that every manager and employee can truly realize the importance of safety and achieve zero risk and zero accident.
3. Power safety self-inspection report
In order to do a good job of safety inspection in autumn and achieve practical results, the self-inspection leading group of our hospital adheres to the principles of "self-inspection and self-correction", "inspection and reform" and "strict investigation and strict reform" in combination with the requirements of the Safety Evaluation Manual, and organizes, plans, arranges, inspects and corrects in a down-to-earth and pragmatic manner. Judging from the results of self-examination, the safety management in our hospital is better than before. First, we conducted a summary inspection of our equipment defects and data perfection, formulated practical safety measures for unsafe factors and weak links, and supplemented and improved the data in time.
1, firstly, check the safety tools and construction instruments, and organize special personnel to carry out pressure test. There are no unqualified safety instruments.
2. Patrol 10kv lines and low-voltage lines under its jurisdiction. During the inspection, it was found that some residual current protection in the jurisdiction could not be put into operation normally; Most of the high-voltage down conductors are not insulated wires; The distribution box door and lock are seriously corroded; The signs in Taiwan Province area are incomplete; Drop fuse does not meet the standard; Incomplete installation of post insulators; The low-voltage branch line has no number; Low-voltage line poles are damaged more; There are many tree barriers on low-voltage lines; Circuit breakers and leakage switches are severely burned out; There are many broken porcelain bottles on low-voltage lines; We will organize a special class to deal with the above problems before the end of 1 1.
3. In combination with the spirit of the detailed rules for the implementation of Xiangfan Power Supply Company's activity of creating "no illegal enterprise", strengthen the safety management on the construction site, prevent illegal operations from violating technical measures on the construction site, highlight the prevention of personal injury and death accidents, increase the training of agricultural electrician's business skills and safety knowledge, hire temporary workers for training and safety education, and sign safety employment contracts.
4. During the construction process, all safety regulations shall be strictly implemented, and the working ticket for safe construction shall be filled in carefully. The construction personnel entering the work site shall adhere to the principle of "two wearing and one wearing", and the second working ticket for the line shall be filled in for the operation and copying work, and the monitoring system shall be carefully implemented. The "two votes and three systems" have been fully implemented, putting an end to the phenomenon of collecting tickets, without tickets and expanding the scope of work without authorization. During my self-inspection, I randomly selected two working places, and the inspection results were very satisfactory.
In the aspect of safety study, organize the staff of the whole hospital to learn the working rules, business management and detailed rules for the implementation of the two votes in the electric power industry, and conduct assessment, conscientiously implement and convey the documents of superiors, make safety announcements, organize discussions, carefully analyze the causes of accidents, point out hidden dangers in work, take timely safety measures to eliminate hidden dangers, and establish a sense of urgency of "responsibility is more important than Mount Tai, hidden dangers lie in open flames, and prevention is better than disaster relief".
Through this self-inspection activity, the management level of the whole hospital has been improved. We will adhere to the policy of "safety first, prevention first" and "three violations and three irons", successfully complete various safety production tasks and ensure the realization of the company's annual safety production target.
4. Power safety self-inspection report
According to the document "Report of Power Supply Company on the Investigation of Power Supply Safety Hidden Dangers of Important Customers", combined with the actual situation of power consumption in our hospital, on February 28th, 20xx, under the guidance of the technical staff of Neiguan Power Supply Station, the leading group of our hospital conducted a comprehensive inspection of the power consumption safety problems in our hospital, and comprehensively rectified the existing problems. The specific report is as follows: 1. Set up a leading group, make an emergency plan, define the division of labor, and put the responsibility on people. In order to deal with the sudden power failure accident in our hospital, quickly and orderly restore power supply, ensure the safety of patients, reduce property losses, ensure the smooth use of electricity in the hospital, and promote the institutionalization and standardization of accident emergency work, according to relevant national laws and regulations, combined with the actual situation of our hospital, the Emergency Plan for xxx Power Failure Accident was formulated and sent to the official power supply office for filing. Set up an emergency leading group for power failure accidents, with clear job responsibilities and clear division of labor, and the responsibility lies with people. The hospital has formulated the Safety Management System for Power Transformation and Distribution Rooms, and implemented it in strict accordance with the system.
Second, the hospital installed its own power supply, which can meet the emergency power demand after power failure. Signed the Management Agreement of Self-owned Power Supply with Neiguan Power Supply Company of anding district Power Supply Company, and was approved by anding district Power Supply Company, and issued the Use License of Self-owned Power Supply.
Three, electrician operation certificate has been reported to the power supply company to arrange unified training and handling.
The fourth is to sum up experience to ensure the full implementation of electricity safety. Through this rectification, the hospital's electricity safety work has reached a new level. In the future work, we will humbly accept the supervision of higher authorities, ensure the safety of hospital electricity use, and better provide convenience for local people to seek medical treatment.
5. Power safety self-inspection report
In order to further strengthen the safety of school electricity consumption and ensure the safety of summer electricity consumption, according to the school safety work plan, the safety inspection system of Shaonan primary school was implemented. On July 1 day, the safety work leading group of our school, together with the responsible persons of each responsible area, electricians and other relevant members, conducted a comprehensive inspection of the school's wiring circuits, electrical equipment and other hardware facilities, as well as the management system, emergency plan and other software construction. The self-inspection is now reported as follows:
The school has formulated and improved the work plan for electricity safety, the safety inspection system, the specific implementation measures for school safety work, the division of responsibilities for school safety, the reporting and handling procedures for accidents, the implementation plan for the education month with the theme of "caring for life and safe development", the safety agreement for primary and secondary school students and various emergency plans.
Second, the organization construction:
A leading group for safety work has been set up, with a clear division of labor and responsibilities assigned to people. The principal is the first person in charge of school safety, and has signed a letter of responsibility for safety objectives with all relevant personnel.
Third, the current situation of electricity consumption:
1, the school subscriber line adopts three-phase wiring, aluminum sheath line, wire diameter1.5cm2, and is connected to the 20,000 kw transformer in Nantai District. The meter consists of three 20(60)a single-phase electronic meters, 60a AC circuit breaker and 30a fuse for 60a three-phase switch.
2. The power distribution room is equipped with modular standard switchboard. Voltmeter, ammeter, power meter and leakage protector run well. The distribution output and cable layout are reasonable, and each power consumption place is controlled separately, which is convenient for maintenance and handling emergencies.
3. All indoor wires can ensure safe bearing capacity without aging damage;
4. High-power electrical appliances shall be installed reliably and grounded well;
5, indoor high and low voltage line wiring is reasonable, there is no potential safety hazard.
Fourth, the existing problems:
1. Because the power of village-level transformers is too small and the load capacity is obviously insufficient, it seriously affects the reliable operation of school precision electronic equipment and high-power electrical appliances (air conditioners) during the peak period of power consumption;
2. Water plant equipment leaks electricity, resulting in self-excited clutter, which sometimes makes school wireless equipment, broadcasting, radio stations, alarms, timers and other programs wrong.