Model tender
Explain that this tender document is a template. When bidding, the bidder shall prepare the bidding documents according to its own actual situation, bidding documents, pre-qualification instructions for bidding applicants and other documents. The tender document consists of three parts: the tender letter part, the commercial part and the technical part.

Bidding documents for engineering construction

Project number:

Project name:

Contents of bidding documents: The letter of tender is a part of the bidding documents.

Bidder: (Seal)

Legal representative or entrusted agent: (signature or seal)

Date: Catalogue, identification of legal representative, signature of bidding documents, power of attorney, bidding letter, appendix to bidding letter and bidding letter.

Other bidding materials required by the bidder in the bid documents of bank guarantee format bid guarantee.

Unit name:

Unit nature:

Time of establishment:

Operation cycle:

Name: gender: age: position: legal representative (name of bidder's company). This is to certify that. Model bidding documents for building construction and municipal infrastructure construction.

Second, the bidding documents signed a power of attorney

This power of attorney states: I (name) am the legal representative of (name of authorizer), and I hereby authorize (name of our company) to sign the bidding documents of this project as the legal representative, and I acknowledge that the agent has full authority to sign the contents of the bidding documents of this project on my behalf.

The agent has no right to entrust, and hereby entrusts.

Agent: (signature) Gender: Age:

ID number: Job title:

Legal representative: (signature or seal)

Authorization date:

To: (Name of Tenderee)

1, according to the project bidding document with the number of your project subject to tender, in accordance with other relevant regulations, and by surveying the project site, we study the bidding instructions, contract terms, drawings, engineering construction standards, bill of quantities and other related documents of the above bidding document. We are willing to bid in (currency, amount, unit) (in figures) according to the requirements of the above drawings, contract terms, engineering construction standards and bill of quantities.

2. We have carefully reviewed all the bidding documents, including the revised documents (if any) and relevant attachments.

3. We acknowledge that the appendix to the tender letter is an integral part of our tender letter.

Once we win the bid, we promise to complete and hand over all the projects within calendar days according to the time limit stipulated in the contract agreement.

If we win the bid, we will submit a bank guarantee with a total price of% or a performance guarantee with a total price of% as the performance guarantee.

6. We agree that the submitted bid documents are valid within the bid validity period specified in Article 15 of the Instructions to Bidders. If we win the bid during this period, we will be bound by this.

7. Unless another agreement is reached and takes effect, your letter of acceptance and this tender document will become an integral part of the contract document binding both parties.

8. Together with this tender letter, we will submit (currency, amount and unit) as a tender guarantee.

Legal representative or agent: (signature or seal)

Bank name:

Bank account number: date

Four. AppendixNo. Tender Letter Project Content Contract Terms No. Remarks on the agreed contents: performance bond Bank guarantee performance guarantee amount% of the contract price; construction preparation time; number of days after signing the contract; default amount; number of days; delay compensation limit; early construction period; total construction period; calendar days; quality standard of engineering quality; prepayment amount; prepayment guarantee amount; progress payment time; issuance of monthly payment voucher; completion settlement payment time; issuance of completion settlement payment voucher; and the warranty period of the day after tomorrow shall be subject to the period agreed in the warranty.

Four. bid document

Five, bid guarantee bank guarantee format (specific format provided by the guarantee bank)

Intransitive verb bid security

To: (name of bidder)

According to this letter of guarantee, (name of bidder), as the principal (hereinafter referred to as the bidder) and (bid guarantee institution), as the guarantor (hereinafter referred to as the guarantor), shall jointly bear the responsibility of paying (currency, amount and unit) (in figures) to (name of tenderer), and both bidders and guarantors shall be bound by this letter of guarantee.

In view of the bidder's participation in the tenderer's bid, this guarantor is willing to provide bid guarantee for the bidder.

The conditions of this letter of guarantee are as follows: if the bidder fails or refuses to sign the contract agreement according to the requirements of the instructions to bidders after receiving your letter of acceptance within the validity period of bidding; Unable or refusing to submit the performance bond as instructed; Withdraw the bid documents within the validity period of the bid. As long as you specify the conditions of any of the above situations, this guarantor will pay you all the above money after receiving your written request, and you do not need to fully prove your request.

The guarantor is not responsible for the following amounts: exceeding the amount specified in this guarantee; The difference between the bid price of the bidder and the bid price of the tenderer. The guarantor hereby confirms that the responsibility of this guarantee is valid within 28 days after the expiration of the bid validity period or the extended bid validity period. If the bid validity period is extended, there is no need to inform the guarantor, but any payment request should be delivered to me within the above bid validity period.

Guarantor: (seal)

Legal representative or entrusted agent: (signature or seal)

Postal code:

Seven. Bid bond: (name of construction unit) Our company accepts your invitation to participate in project bidding. According to the requirements of the bidding documents, our company now submits a bid bond of RMB (in words: RMB only).

The conditions of this guarantee obligation are as follows: if the bidder withdraws his bid within the bid validity period stipulated in the tender; If the bidder receives the bid-winning notice issued by the construction unit within the bid validity period; Failing or refusing to sign the contract agreement according to the provisions of the instructions for bidding; Failing to provide performance bond according to the provisions of the instructions for bidding or refusing to provide performance bond according to the provisions of the instructions for bidding in violation of the relevant laws and regulations on bidding. The tenderer has the right to confiscate the bidder's deposit. When bidding, the bidder can return the bidding documents and attached drawings, and the tenderer will return the bid bond to him. (Interest-free) Bidder (official seal) Legal representative of the bidder (signature and seal).

Eight, the tender documents require bidders to submit other bidding materials (this item has no format, if necessary, it should be put forward by the tenderer in writing) using the format of the commercial part of the tender documents.

Contents of bidding documents: contents of commercial bid part of bidding documents (in the form of comprehensive unit price)

(This part is subject to the requirements of the tender documents and the format of the bill of quantities settlement software) Description of the tender offer.

Second, the tender offer summary table

Three. List of main materials and quotation sheet

Fourth, the equipment list quotation sheet

Verb (abbreviation of verb) bill of quantities quotation sheet

Intransitive verb measures and project quotation sheet

Seven. Quotation list of other items

Eight, the bill of quantities project price calculation table

Nine. Other information required for bidding quotation This quotation is prepared according to the bidding instructions of this project and the relevant clauses in the contract text. The comprehensive unit price and average price filled in the price list of bill of quantities include all expenses such as labor cost, material cost, machinery cost, management fee, profit, tax, risk premium and so on.

The quotation of the measure project filled in the price list of the measure project includes the expenses incurred by the measures that must be taken to complete the construction of this project.

The prices of other projects filled in the price list of other projects include other expenses that must occur to complete the construction of this project except the price list of bill of quantities and the price list of measures.

Each item in the quotation sheet of this bill of quantities shall be filled with unit price and total price, and the project cost without unit price and total price shall be deemed to have been included in other unit prices and total prices in the bill of quantities.

The general way of this quotation is that the bidder should submit the items that need to be explained in the tender quotation together with the tender quotation sheet in words.

Format of technical part of bidding documents

Content of bidding documents: technical part of bidding documents.

Bidder: (Seal)

Legal representative or its entrusted agent: (signature or seal) Configuration table of project management organization for construction organization design of the project to be subcontracted.

1, the bidder shall prepare the construction organization design, including the basic contents of the construction organization design specified in Item 1 1.4 of Volume I of the bidding documents. The specific requirements of compilation are: explain the construction methods of each division and sub-project in the form of words and charts; The main construction machinery and equipment to be invested, labor plan, etc. ; According to the characteristics of the bidding project, practical measures are put forward for the project quality, safe production, civilized construction, project progress and technical organization. At the same time, the corresponding technical measures are mainly put forward for key working procedures and complex links, such as construction technical measures in winter and rainy season, technical measures to reduce noise disturbing people, environmental pollution technical measures, protection and reinforcement measures for underground pipelines and other underground facilities, etc. In addition to written expression, the following charts, charts and format requirements should be attached.

2. In addition to written expression, the construction organization design shall be accompanied by the following charts, charts and format requirements.

2. 1 List of main construction machinery and equipment to be invested

2.2 Labor Schedule 1.2

2.3 Network diagram of planned commencement and completion date and construction progress 1.3

2.4 construction site plan 1.4

2.5 Temporary Land Use Table 1.5 List of main construction machinery and equipment to be invested (project name) Engineering Table 1 None. Name, model and quantity of machinery or equipment Country of origin Year of manufacture Rated power (KW) Production capacity Schedule of labor force used in construction site (project name) Project Schedule 1.2 Labor input is based on the construction stage of the project.

Note: 1. The bidder shall submit the estimated labor schedule including subcontractors in the listed format.

2. This schedule is compiled on the basis of the eight-hour working system in each class. The network table of the planned commencement and completion date and construction progress is 1.3.

1, the construction progress network or construction schedule submitted by the bidder shall indicate the key date of construction according to the construction period required in the bidding documents. The winning bidder shall also submit a detailed construction progress plan according to the requirements of relevant clauses in the contract conditions.

2. The construction progress plan can be represented by network diagram (or crossing diagram), indicating the planned commencement date, the completion date of each stage of each subdivisional work and the date of signing the subcontract.

3, the construction progress should be adapted to the construction organization design. General layout of construction 1.4 The bidder shall submit the general layout of construction, draw the layout of temporary facilities on site, and attach a text description to explain the situation and layout of temporary facilities, processing workshop, on-site office, equipment, storage, power supply, water supply, sanitation and living facilities.

Temporary land use table (project name) Total schedule required for project location 1.5 Available area (m)

Note: 1. The bidder shall fill in this form item by item, indicating the land area and detailed use of all temporary facilities.

2. If this table is not enough, attach a separate page. Project management organization configuration table 1.6 project manager's resume table 1.7 project technical director's resume table 1.8 project management organization configuration auxiliary information table 1.9 project management organization configuration table 1.6 (project name) Project post name: practicing certificate or professional qualification certificate of construction in progress. Name of the original professional service unit; Number of major projects; Once our unit wins the bid, it will implement the project manager responsibility system and be equipped with the above-mentioned project management institutions. We guarantee that the above information is true. If it is not true, we are willing to accept it according to relevant regulations. Division of responsibilities, etc. Supplementary information shows the project manager's resume (project name) project list 1.7 name, gender, age, professional title, education background, years as a project manager, project manager's qualification number, project name of the construction unit, construction scale, commencement and completion date, commencement or completion (3) resume of project technical director (project name) project list 65438+ 0.8 years as a technical director (.

Note: 1. Auxiliary explanatory materials mainly include the organizational setup of the management organization, division of responsibilities, copies of relevant certification materials and materials that the bidder deems necessary to provide. There is no uniform regulation on the format of auxiliary explanatory materials, which are designed by the bidders themselves.

2. The auxiliary materials of the project management team are attached (bound together with this tender document).

(Project Name) Project Table 1. 10 Name and address of subcontractors Legal representative Business license number Qualification grade certificate number Main contents of the proposed subcontracted project Estimated cost (10,000 yuan) Similar projects that have been done.