Personnel applying for special operations in construction shall meet the following basic conditions:
(a) at least 18 years of age and meet the age requirements specified in relevant types of work;
(2) Having passed the physical examination in the hospital, and having no diseases or physical defects that prevent them from engaging in corresponding special operations;
(3) Junior high school education or above;
(four) other conditions that meet the needs of the corresponding special operations.
Importance of extended information builder
First, the builder is the organizer and manager of the production line on the construction site, and plays an extremely important role in the construction process, which is embodied in the following aspects:
(1) The builder is the management center of the construction site of the unit project, the embodiment of the dynamic management of the construction site, the organizer of the rational investment of the unit project and the optimal combination of production factors, and is directly responsible for the construction of the unit project.
(2) The builder is responsible for the project construction production and schedule control, and is the information distribution center of the unit construction site.
(3) The builder is the hub responsible for external communication on the construction site of this project.
(4) The builder is the link to coordinate the relationship between grassroots professional managers and workers on the construction site, and it is necessary to command and coordinate the relationship between grassroots professional managers such as budgeter, quality inspector, safety officer and material engineer.
Second, the builder's unique position determines that he has a close relationship with relevant departments, mainly in the following aspects:
(1) The builder has the relationship of supervision and supervision with the engineering construction supervision unit and the construction unit, so the builder should actively cooperate with the on-site supervisors in all kinds of work and inspection in construction quality control, construction progress control and project investment control, and fully perform the project contract.
(2) There is a working relationship between the contractor and the design unit. The design unit shall actively cooperate with the construction, be responsible for explaining the design intent and design documents, solve the problems in the design documents in time, change the design and revise the budget, and participate in the project completion acceptance.
At the same time, the construction party found unexpected new situations in the construction process, which changed the quantity, quality and form of the project or any part of it, and should be reflected in time. The construction unit, design unit and construction unit should solve the problem through consultation, and handle the design change and negotiation.
The builder is the concrete practitioner of the organization and management of grass-roots construction enterprises, and the most basic technical and organizational management personnel to complete the construction and installation tasks.