Current location - Education and Training Encyclopedia - Educational institution - Code for quality and safety of construction site
Code for quality and safety of construction site
1. Before each operation team enters the construction site and officially goes to work, the project department must carry out "three-level" safety education (team education, project department education, enterprise safety management education) for team employees and establish an education record card; If the safety technical disclosure is not clear and comprehensive, and the employee has an industrial accident, the educator or the disclosure person must be held accountable.

2. Safety education at all levels should be targeted, and each team cannot be the same.

3, the project department should often organize cadres to learn about the laws and regulations of production safety, learning norms and standards, learning safety technology operating rules, etc. , through learning to achieve the purpose of mastering and using skillfully.

4. Adhere to the safety activity day every Monday, and each activity should be organized, content-oriented, purposeful and demanding. Generally, we can summarize the safety work last week, put forward and emphasize the measures to do a good job in safety according to this week's work, and also adopt some targeted safety operation procedures; The purpose, content and specific arrangement of safety activities shall be the responsibility of the full-time safety officer of the project department, and the project manager or other management personnel shall not occupy the safety activity day to hold other meetings and carry out other work.

5. Before assigning new employees, three-level safety education must be carried out, the project department should carry out professional safety technical regulations and rules and regulations education, and the team should carry out specific safety education work.

6. The project department must contact the local labor department to conduct safety technical training for special operations personnel who need to hold relevant certificates, and can only take up their posts after obtaining the operation certificate of special operations personnel through examination; Safety education and technical disclosure should still be carried out before taking up the post.

7. When employees change jobs or engage in a second occupation, the project department must conduct safety training and safety laws and regulations study again, and they can only take up their posts after passing the examination.

8. When new technologies, new machines and tools, new equipment, new processes and new methods are adopted in the construction, the project department shall provide operators with operation technical training and safety technical education, and can only operate after passing the examination.

Safety inspection system

Safety inspection is an important means and measure to eliminate hidden dangers, prevent accidents and ensure safe production. In order to continuously improve the production conditions and working environment, so that the working environment can reach the best state. In order to take effective measures to eliminate unsafe factors and ensure safe production, this safety inspection system is formulated as follows:

1. Safety inspection content: check the implementation according to the grading standard of safety inspection on the construction site issued by the Ministry of Construction; Protection of the base groove edge; Construction electricity, safety facilities of construction machines and tools, operation behavior, correct use of labor protection articles, safety and fire prevention, etc.

Second, the safety inspection method:

Regular inspection, surprise inspection, professional inspection, seasonal and holiday inspection and regular inspection.

Three, the project department construction site inspection once a week, organized by the project manager; Each construction team carries out daily inspection, organized by the construction director, and the production team insists on daily self-inspection of the working procedures in their respective environments to eliminate unsafe hidden dangers at any time.

Fourth, surprise inspection:

In the event of heavy casualties, equipment accidents, traffic accidents and fire accidents in the same industry or brother units, in order to learn lessons, preventive measures shall be taken according to the nature and characteristics of the accidents and surprise inspections shall be organized.

Five, professional inspection:

In view of the sudden problems existing in the construction, such as construction machines and tools, temporary electricity consumption, etc. , organize individual inspections and carry out special treatment.

Six, seasonal and holiday inspection:

In view of the climatic characteristics that may bring harm to the construction in winter, summer and rainy season, four precautions should be taken in winter, heatstroke prevention and cooling in summer, and flood control in rainy season in advance; Before and after major holidays, it is necessary to do a good job in safety education and implement safety precautions to prevent employees from being lax in discipline and thinking paralysis.

Seven. Regular inspection: safety functional personnel, project management department and safety officer on duty should often go deep into the construction site to carry out preventive inspection, find hidden dangers in time, eliminate hidden dangers and carry out standardized construction normally.

Eight, check out the hidden dangers of accidents:

All kinds of inspections must be careful and meticulous, leaving no dead ends. For the accidents found out, it is necessary to establish an accident hidden danger ledger, fill in an accident hidden danger instruction book for major accidents, and designate a special person to make rectification within a time limit.

Safety technical disclosure system

Strict safety technical disclosure and serious implementation of safety technical measures are important guarantees for implementing the policy of safe production, reducing industrial accidents and realizing safe production. In order to ensure safety in production and run safety through the whole production process, the following safety technical disclosure system is formulated according to the actual situation of this enterprise:

1, before the project starts, the construction director and technical director should organize relevant personnel to formulate detailed safety technical measures according to the engineering characteristics, geographical environment and construction methods, and report them to the relevant technical safety departments at higher levels for approval. The approved safety technical measures have the function of technical regulations and must be carefully implemented.

2. When the project starts, the chief engineer and technical director shall organize the construction project manager, builder, safety officer and team leader to make detailed safety technical disclosure, so that the competent personnel can understand the truth and lay the foundation for the implementation of safety technical measures.

3. Before each single project starts, the on-site project manager shall organize the builder to explain the construction methods and safety technical measures to the actual operation team members in detail, and issue them to the team in writing.

4. The builder shall fill in the safety technical disclosure sheet according to the implementation of safety facilities, equipment and safety precautions of single project safety technical measures, and the person in charge shall implement the signature acceptance system for teams and individuals.

5. The production organizer of the construction site shall not change the safety technical measures without authorization. If reasonable suggestions are put forward, they shall be submitted to the chief engineer for written approval. Before approval, it should be carried out as planned.

6. The safety functional department shall take the technical measures for construction safety, safety regulations and various safety rules and regulations as the criterion, regularly inspect the implementation of the site, and supervise the implementation of various safety technical measures.

Pre-shift safety activity system

1. Before each operation team enters the construction site, the project department must carry out "three-level safety education" for the team members and establish an education record card.

2. The Project Department must sign the responsibility letter for production safety with each operation team leader and employee, and make targeted written safety technical disclosure. Both parties must perform the signing procedures.

3. Before going to work every day, each operation team leader must carry out comprehensive and targeted safety education activities for the employees of his team, mainly emphasizing the safety precautions of the operation that day, checking the wearing conditions of the employees' safety protection articles, and observing and understanding the employees' mood and psychological state that day.

4. Before putting into normal operation, the construction machinery and tools must be inspected twice: first, whether they are installed correctly and whether there are safety protection devices and safety protection measures; Second, check whether its performance is normal, and operate according to the operation procedure of maintenance before operation, especially the machinery prone to accidents, which must be overhauled before shift to check its safety status. If an accident is found, stop the machine immediately for maintenance, and then use it after debugging is normal.

5, all shift alcoholics, are not allowed to enter the construction site; Anyone who doesn't have the qualification to work is not allowed to work.

6. security team activities of the project department must be recorded in writing, signed by the project safety officer, and supervised and inspected by the enterprise safety management department.

Safety duty system

In order to strengthen safety management, eliminate unsafe factors in the production process and weak links in safety management, and implement safety work, according to the actual situation of our project department, the safety production duty system is formulated.

A, the project intends to safety on duty system:

All members of the project management department must take turns to be on duty safely, each for one week. During the on-duty period, do a good job in safety management due diligence, check the safety production situation of each operation surface in detail, and take decisive measures to rectify the hidden dangers of accidents immediately. Those who enter the site without wearing a safety helmet, work high above the ground without wearing a safety belt and wear slippers will be dealt with according to the punishment regulations. During the period of duty, check the number of people on duty, and the personnel on duty shall not leave the scene where someone works overtime. Participate in the investigation and analysis of industrial accidents during duty, make a good record of duty, and hand over shifts on time.

Second, the safety responsibility of the on-site viewers:

In addition to doing a good job in security, the on-site guards should also register foreign personnel entering the site. If new personnel are found in the inventory, they should report to the person in charge of the site in time. And set up a safety supervision post at the gate of the construction site, and have the right to stop people who don't wear safety helmets, slippers and bring children into the site and not let them into the construction site.

Three, the personnel on duty at all levels, must be conscientious, do a good job in duty safety, during the period of duty, absent without leave, irresponsible, causing accidents, will be investigated for the direct safety responsibility of the personnel on duty.

Top ten safety bans

1, it is forbidden to wear clogs, slippers, high heels and no helmet to enter the construction site.

2. It is forbidden for all personnel to operate, stand and walk under the lifting frame, hanging basket, lifting frame wellhead and hanging objects.

3. Non-professionals are strictly forbidden to start any construction machinery without permission, and connect and disconnect wires and appliances randomly.

4. It is forbidden to play, make noise and throw Zheng materials, tools, bricks, sand, mud and everything from a height at the job site.

5. It is strictly prohibited to steal earth excavation rocks and dig deep foundation pits that are not broken or supported according to regulations.

6. It is forbidden to work at heights without railings or other safety measures and walk on the one-way wall.

7, it is strictly prohibited in the same part without safety measures at the same time for cross homework up and down.

8, it is forbidden to take children into the construction site.

9, it is strictly prohibited in high voltage power supply dangerous areas for adventure operations and mobile terrazzo operations without wearing insulating water shoes; It is forbidden to hold the lamp holder directly by hand and move the wire to operate the lighting.

10. Smoking and lighting are prohibited in the dangerous goods warehouse, inflammable goods and woodworking shed on site.

Detailed rules for the implementation of the reward and punishment system for production safety

Where there is production, there is safety, and safe production is an eternal theme. In order to strengthen safety management, according to the actual situation of our project department, the following detailed rules for the implementation of the safety reward and punishment system are formulated:

A, labor safety discipline part:

1, you must wear safety helmet when entering the construction site. Any type of worker who enters the construction site without wearing a helmet will be fined 50 yuan, 200 yuan for less than 3 people, and for more than 5 people 1000 yuan. The cap shell is damaged, which can't protect the safety. 20 yuan will be fined for each person found; If a person is fined more than three times in a row, he will stop studying and be slightly injured because he does not wear a helmet, and all the economic losses caused will be at his own risk.

2. It is forbidden to wear slippers and high heels to enter the construction site. Wear slippers and high heels to enter the construction site, each person will be fined 20 yuan, three team members will be punished at a time, and the team leader will be fined 100 yuan.

3. It is forbidden to work after drinking. If it is found that the operators after drinking will each be fined 50 yuan, and the consequences of any accident in the operation after drinking will be at their own risk, and those who cause other people's accidents will be investigated for legal responsibility according to their circumstances.

4, it is forbidden to take children into the construction site. If it is found that children are brought into the construction site, each person will be fined 20 yuan. Personal safety accidents caused by children's ignorance shall be borne by guardians, and all economic losses caused by tampering with mechanical equipment shall be borne by guardians.

5, it is forbidden to maintenance workers reading at work, do private things. Anyone who finds reading or doing private work in his post will be fined 20 yuan, and if he still doesn't make corrections after the punishment, he will be fined twice.

6. Smoking is strictly prohibited in woodworking and flammable workplaces. If smokers are found, 20 yuan will be fined each person.

Second, the temporary electricity part:

1, the line erection on the construction site must conform to the specification requirements, and 20 yuan will be fined if there is no crossbar or insulator in some places.

2. Knife fuses must match. 50 yuan was fined for replacing a fuse with aluminum wire and copper wire.

3. The main distribution box and knife box are not locked, and there is no switch after work. No rainproof measures, fine 20 yuan every time;

4, hand-held power tools, lighting circuit is not used, install leakage protector, fine 20 yuan;

5. The electrical equipment has zero protection according to regulations, and the grounding zero does not meet the specification requirements, and 20 yuan is fined.

6. The height of the temporary lighting circuit does not meet the requirements, and the power and lighting circuits are not protected by metal scaffolding insulation. If mopping the floor, aging, broken skin and electric leakage are found, a fine will be imposed 10 yuan.

Three, mechanical equipment:

1. Hand-held electric equipment does not need personal protective equipment against electric shock when used, and 20 yuan will be fined once;

2. Those who operate woodworking chainsaws and planers with gloves will be fined 10 yuan.

3. Operating the woodworking chainsaw without protective baffle, and operating the woodworking planer without finger key push plate and push rod, each person will be fined 10 yuan.

Four, the base groove edge protection part:

1, 2 meters below the foundation trench without protection and enclosure, every 10 meters along the length, punish scaffolder team leader 10 yuan;

Verb (abbreviation for verb) Other parts:

1, carpentry formwork supporting, supporting the scaffold on the scaffold, causing deformation and inclination of the outer frame. Every 10 meter along the length, 20 yuan and the team leader will be punished;

2. Without the consent of the construction management personnel, dismantle the support and enclosure without authorization, and punish 20 yuan, the team leader where the dismantler is located.

3. If the safety protection facilities, protective devices and safety publicity signs are damaged due to poor sense of responsibility, the fine shall be doubled according to the original value of the damaged objects and deducted from the salary.

4. Failing to take effective protective measures and throwing objects into the foundation pit, 20 yuan is fined once, and the person who caused the accident shall be investigated for criminal responsibility;

Reward:

The conditions for the Project Department to set up "Advanced Individual Award for Work Safety" and "Special Award for Work Safety" are as follows:

(1) Production management personnel:

1. Seriously implement the responsibility system for production safety in this position, do a good job of safety due diligence, and the illegal command department will.

2. There are no work-related accidents, major near misses and equipment accidents in the work teams managed throughout the year;

3, each type of work team adhere to the correct use of safety Sambo, do no harm, no illegal operation phenomenon;

4, adhere to the regular work safety education, safety technical disclosure targeted, on-site safety management information is complete;

5. All the safety standards of the managed projects have reached excellent standards.

(2) Production workers:

1, can study hard, abide by the rules and regulations of safety production, and achieve three no injuries and no illegal operations;

2. Actively participate in various forms of safety activities to serve the safety production of the whole enterprise;

3, adhere to the correct use of three treasures of safety, no accidents throughout the year;

4. Eliminate hidden dangers of major accidents in case of emergency, and avoid life casualties;

Safety fines are used for safety incentive funds and shall not be used for other purposes; Advanced individuals in production safety are appraised once a year and commended at the end of the year; Special awards for work safety can be issued at any time.

Construction electricity management responsibility system

1, the team leader shall organize regular inspection of all electrical equipment, lines and protection systems on site, and arrange full-time electricians for maintenance in time when problems are found.

2, deputy county magistrate patrol every day, timely find hidden dangers of electricity, let full-time electrician rectification within a time limit.

3. Team members and other management personnel should cooperate with the inspection work of the team leader and deputy team leader, and conduct irregular inspections before and after holidays, after heavy rains and strong winds, and report to the team leader and deputy team leader in time when problems are found, so as to nip all unsafe hidden dangers in the bud.

Building electrical safety fire prevention system

1, non-professionals, it is forbidden to touch electrical equipment.

2, the operator using all kinds of electrical equipment, must conscientiously implement the safety operation procedures, and obey the electrician's safety technical guidance.

3. No unit or individual may assign personnel without electrician operation certificate to install and maintain electrical equipment.

4. On-site management personnel should pay attention to the electrician's reasonable suggestions on safe electricity use, and shall not force the electrician to operate illegally for any reason.

5, professional electrician must conscientiously implement the relevant regulations and procedures, and consciously resist illegal operation instructions from any side.

6, professional electrician has the right to stop all illegal electricity operation, can report to the relevant departments when necessary.

7, professional electrician should correct working attitude, actively cooperate with electricity operators to complete various production tasks.

Technical disclosure of construction electricity safety

1, all electrical operators must hold relevant certificates.

2. Before operation, check all insulation conditions and properly keep inspection tools. Do not use it by others, and check the calibration regularly.

3. It is forbidden to connect or disconnect the circuit with load, and live working is forbidden.

4, found that someone get an electric shock, immediately cut off the power supply, first aid, electrical fire, should immediately cut off the power supply, use foam extinguisher or dry sand to put out the fire.

5. When installing the automatic air switch and other switch devices with return springs, put the switch in the power-off position before installation.

6. When multiple distribution boxes are installed in parallel, fingers shall not be placed at the joint of two boards, and the connecting screw holes shall not be touched.

7, the installation of lighting lines are not allowed to directly on the slatted ceiling or sound insulation board traffic and stacking materials. When it is necessary to pass, scaffolding should be laid on the big stare blankly.

8, outside the pole stringing, before boarding, pole roots should be solid. When the rotting depth of the old wooden pole root exceeds one eighth of the diameter of the pole root, it should be reinforced before climbing the pole.

9. The operating anklet of the climbing pole should be adapted to the pole diameter. Pedals and hooks should be used upwards, safety belts should be fastened in safe and reliable places, buckles should be fastened, and tools and materials should not be tied to porcelain bottles or cross arms. Tools and materials should be passed by rope, and it is forbidden to throw them up and down.

10, the rod should be tightened laterally and the clamping bolt should be tightened. When adjusting the cable, no one can be on the pole.

1 1, construction electricity shall be grounded according to safety requirements, and operation shall be stopped in case of thunderstorm.

12. When debugging the electric drive system and various high and low voltage switches, remove or lock the relevant switch handles and hang signs to prevent misoperation.

13, on-site distribution equipment, whether charged or not, single person on duty is not allowed to cross the area to engage in maintenance work.

14, outdoor operations in rainy days, in addition to wearing insulation protective equipment, insulation should have a rain cover, and someone to monitor.

15, it is forbidden to close the switch with live load.

16. The electricity used in the construction site should be checked and accepted by the security personnel before use.

Construction electricity inspection and maintenance system

A, the electrical equipment on the construction site, must have an electrician operation certificate, when installation, it is forbidden to non electrician personnel connected to the power supply operation.

Second, electrician operators must master the basic knowledge of safe electricity use and the performance of all equipment, and regularly check and maintain all power lines and equipment.

Three, in the inspection and maintenance, must wear the corresponding labor protection articles in accordance with the provisions, pull the switch, power supply, lock the switch box, before operation.

Four, the construction of electrical equipment, devices, often to protect, maintain, extend the utilization rate, it is forbidden to run equipment in spite of illness.

Five, check the compulsory construction site builder, safety officer, full-time electrician construction electricity safety team for inspection, and make inspection records.

Six, construction electricity safety inspection team:

1. General Manager of electrical equipment on the construction site: XXX

2. Team leader: XXX

3. Deputy Head: XXX

4. Team member: XXX XXX

Seven, inspection system:

1, organize regular inspection every ten days;

2. In case of heavy rain and strong wind, check before going to work the next day after shutdown;

3, timely inspection, immediate treatment, shall not be used with problems, in order to protect the safety of electrical equipment.

Safety technical disclosure of template installation and removal

1, personnel entering the construction site must wear safety helmets, and operators are forbidden to wear hard-soled shoes and high-heeled shoes.

2. Check whether the tools used are firm before work, and the tools and nails must be put in the tool bag to avoid falling and hurting people. Concentrate on your work to prevent nails from sticking your feet and falling into the air.

3. When installing and dismantling the box culvert side wall formwork, scaffolding should be set up and protection should be set up. It is forbidden to operate in the same vertical plane.

4. Clean the construction site after the rain, and then work when it is a little dry and not slippery.

5, when lifting the template, two people should cooperate with each other and work together. When transferring the template, tools and transportation, the lifting point should be reliable, and the rope should be fastened after lifting, and no throwing is allowed. When disassembling the steel formwork, someone should meet up and down, and the steel formwork and accessories should be shipped with the disassembly. It is forbidden to throw from a height. When dismantling the formwork from a height, there should be a special person to direct it.

6, shall not be piled up on the scaffold a lot of templates and other materials.

7, in the process of shuttering, if you need to stop, support, lap, stigma plate should be fixed firmly; During the interval of formwork removal, the movable formwork, tie rod and support should be transported away or properly stacked to prevent falling when stepping on or holding empty.

8, high homework to erection of scaffolding or work station, up and down to use a ladder, are not allowed to stand on the wall. When disassembling the template, the operator should stand in a safe place to prevent working in the same vertical plane. Operators should take the initiative to avoid hanging objects and enhance the safety awareness of self-protection and mutual protection.

9, dismantle must be dismantled at one time, shall not leave unsupported template. Remove the template to clear in time, neatly stacked.

Requirements for stacking formwork materials during construction.

In order to create a civilized construction site and make everyone's safety more secure. My project department puts forward the following requirements for material stacking in formwork engineering construction, and hopes to abide by them consciously.

First of all, the finished products and semi-finished products in the batching shed are neatly stacked separately.

Second, the installation of templates and materials should be used with the component size, supporting materials shall not be piled up in the construction layer.

Three, template stacking should be packed along the wall, don't pile up in the middle of the room with a large span.

Four, after the demolition of the template, materials and scaffolding classification piled up, immediately removed to the designated place.

Five, the nails on the template face down, it is best to pull out the nails and pile them up.

Protective measures for construction machinery

First, the construction site mechanical protection objects mainly include chainsaws, planers, mixers and grinders.

Second, the chainsaw should be equipped with a wooden or iron protective cover on the belt, and the planer should be placed in a dry place in the wooden shed.

Third, the protection of the planer is mainly the wooden or iron protective cover of the belt, and the planer should be placed in a dry place in the wooden shed.

Fourth, the mixer protection is mainly to build a protective shed to prevent rain and falling objects from hurting people. The protective shed is erected with steel pipes, and double protection is set on it.

Five, grinder to deal with its belt airtight protection, and placed in the steel shed on the dry ground.

Construction machinery inspection and maintenance system

A, all the mechanical equipment on site shall be prepared by the construction director and the mechanical monitor, and relevant personnel shall be arranged for repair and maintenance as planned. Full-time maintenance personnel should do routine maintenance and irregular inspection to ensure the normal use of machinery.

Second, mechanical maintenance workers must know fairly well about the quality of construction machinery, so as to find the cause of maintenance timely and accurately. Be diligent in inspection, maintenance and maintenance.

Three, for all kinds of mechanical inspection problems, must be dealt with immediately, shall not make do with forced use, to prevent the occurrence of mechanical accidents, and make a truthful record.

Four, by the project department to organize relevant personnel to check the implementation of mechanical equipment maintenance once a month, for dereliction of duty, not regular maintenance as required, resulting in the loss of mechanical operation in spite of the economic punishment.