Current location - Education and Training Encyclopedia - Education and training - What are the main processes of assembling finished notebook computers?
What are the main processes of assembling finished notebook computers?
The process of assembling the finished notebook computer 1 Install 1 on the C-shell assembly, connect the keyboard hardware to the left space of the C-shell, and clamp it on the positioning post. 2. Install the USB hardware on the lower left of the C shell and clip it on the locating post. 3. Install the rotating shaft hardware bracket 1 on the left side of the keyboard hardware, cover the keyboard hardware and USB hardware, clamp it on the positioning column, and then flatten the positioning column with ferrochrome. 4. Install the touchpad in the middle and lower part of the C shell and press it tightly. 5. Install the fingerprint board under the touch panel, stick the fingerprint board on the positioning post, then stick the hardware of the fingerprint board on the top, and tighten the screws to connect the fingerprint board line to the touch panel line. 6. The keyboard is installed at the upper left of the C shell and stuck on the positioning post. Connect the keyboard wires and screws. 2. Install shell assembly D 1. Install the rotating shaft hardware bracket 4 on the right empty side of the D shell and fix it on the positioning post. 2. Install the rotating shaft hardware bracket 3 on the left side of the D shell and clamp it on the positioning post. 3. Install the rotating shaft hardware bracket 2 in the lower space of the D shell and clamp it on the positioning post. 4. Install the rotating shaft hardware bracket 5 on the right side of the D shell and clamp it on the positioning post. 5. Use ferrochrome to flatten the positioning columns of the four brackets. 6. Clamp the USB hardware on the lower right of the D shell and fix it on the positioning post, and flatten the small positioning post. 7. Connect USB interface card to USB hardware, and fasten and connect USB interface cable. 8. Install the battery interface board above the D shell and tighten it. 3. Install 1 for the shell A. Install wireless network card antennas (one black and one white) on the upper left and the upper right of the shell A, and clamp them on the card post. Add screws to clamp the wires in the card slot. 2. Install the microphone under the left line of the left wireless network card and clip the line into the line card slot. 3. Install the camera in the middle and upper part of the A shell, clamp it on the positioning post, and then connect the camera cable. Fix the camera cable at the lower right and stick it with black tape. 4. The high-voltage rod is installed under the A shell, clamped on the positioning column, and tightened. Connect the high-voltage board cable and connect the high-voltage board cable with the microphone cable. 5. Install two small speakers on the left and right sides and fasten them. 6. Install the left and right fixing brackets of the display screen and tighten them. 7. Install the shielded wire behind the display screen and stick it with black tape. 8. Install the installed display screen on the A shell, align the six screw holes and tighten the screws. 9. Position the left and right rotating shafts on both sides of the A shell with screws. 10. Align and clamp the B shell with the installed A shell. 1 1. Install two small plastic shafts under the shaft hardware and fasten them. 4. Install 1 for A and D. Install the installed A and B surfaces on the left and right rotating shafts of D shell, clamp and tighten them. 2. The left and right screen wires, speaker wires, camera wires and wireless network card wires are clamped flat and glued with black tape. 3. Install the fan, heat sink, memory and wireless network card on the motherboard and tighten the screws. 4. Check whether the hardware is connected to the motherboard, and do not short circuit. After the inspection, install it on the empty side of the D shell. When installing, first install the hard disk interface, then buckle it, and then connect all the wire interfaces with the corresponding interfaces of the motherboard. 5. After the installation is completed, install the installed C shell and D shell, connect the fingerprint board cable with the motherboard interface of the switch board cable, and fasten it on the D shell. 6. Connect the power supply and check whether it can be turned on. If the boot is successful, you can install the keyboard, then install the back cover and play all the screws. Notebook production line 1 job requirements and division of labor. Supervisor: Responsible for personnel arrangement, production and administration. 2. Assistant in charge: responsible for product performance explanation, foreign personnel registration, employee attendance registration and workshop briefing; 3. Extension: production arrangement, employee transfer, administrative affairs, material distribution and storage; 4. Extension assistant: assist in managing the work arrangement and material distribution of an extension department and record the commuting time of employees; 5. Technical team leader: responsible for training students in assembly and technical work; 6. Technician: assist the technical director in handling technical work; 7. Workshop materials clerk: responsible for receiving materials from the warehouse, checking the total quantity of materials, registering how much materials are received, how much materials are used, and recording the number of finished machines; 8. Warehouse management: responsible for material warehousing, warehousing records and material distribution.