Professional title is a qualification of professional and technical personnel (managers), it is not a position. Refers to the qualification granted by the personnel engaged in professional technology and management positions after reaching a certain professional life and achieving certain achievements. Below, I collected and sorted out the "Summary of Professional Title Evaluation" for everyone. Welcome to read and learn from!
Professional title evaluation summary 1
Time flies, from July 20th to now, I have been engaged in project cost work for almost a year. During this period of work, we not only deepened our understanding of the original knowledge, but also got a better understanding of the knowledge that was not touched or deeply touched in previous books. Since my work, I have made great progress and gained a lot in my thought, study and work under the careful training and teaching of the unit leaders and through my continuous efforts.
Positive thinking, active study of political theory, adherence to the four cardinal principles, law-abiding, love of their jobs, a strong sense of responsibility and dedication. Insist on seeking truth from facts, constantly improve their political and ideological awareness and level, and constantly explore and pursue. Actively study professional knowledge, have a correct working attitude, be serious and responsible, and have good ideological and political quality, ideological quality and professional ethics.
At work, I love my job. I can treat every job correctly and seriously. I can complete the tasks assigned by the leaders with good quality and quantity. I can actively find my own shortcomings and learn to supplement them in time.
In terms of working ability and professional knowledge, we are mainly engaged in engineering cost work, and are responsible for the engineering cost of the whole construction process from the project start to completion. Every detail of engineering calculation needs enough patience and communication and coordination. Under the mutual learning, enthusiastic help and detailed explanation of leaders and colleagues, I also learned and participated in some specific work, and gained a lot.
During my work, I don't miss or waste every opportunity to exercise, and accelerate the continuous updating of my knowledge and the improvement of my quality. At the same time, I use my spare time to ask leaders and colleagues for all kinds of knowledge about cost work. He has participated in more than a dozen large and medium-sized projects such as Baotou Hope Aluminum Project in Inner Mongolia, Weinan Sports Center Project and Laxiwa Hydropower Station Project in Qinghai. In this process, our personal working ability has been improved to a certain extent, which is inseparable from the concern of leaders and the mutual help of colleagues around us. In the future work, we will continue to work hard, make persistent efforts, be strict with ourselves, be realistic and innovative, constantly temper ourselves, go all out to do a good job and strive for greater achievements.
Since engaging in the project cost work, I have deeply felt the busyness of work and the great responsibility; Big and small things are in the body, often paying attention to this end, but ignoring that end. I will continue to improve myself and strive to do better in the future.
By summing up the work during this period, although some progress and achievements have been made, there are still some shortcomings, and we don't know much about the engineering cost work in some fields, and some work is not perfect enough. In the future work, we will try our best to find out the shortcomings in the work so as to overcome them in the future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time. Constantly sum up and reflect, constantly spur yourself to enrich your energy, improve your quality and business level, in order to adapt to the development of the times and enterprises, and make progress and growth together with the company.
Summary of professional title evaluation II
I majored in construction engineering supervision in college, so I devoted myself to related engineering construction supervision after graduation. Time flies. It has been more than three years since graduation. In the course of nearly four years' work, I have not only deepened my understanding of the original knowledge, but also got a better understanding of the knowledge that I didn't touch or didn't touch deeply in previous books. Since my work, I have made great progress and gained a lot through my own continuous efforts under the careful training and teaching of the unit leaders. Now I will summarize my work as follows:
At work, at the beginning of work, in order to get into the state of supervisor in the shortest time so as to finish the work better in the future, we collect information everywhere after work and supervise the nature and situation of the work for our predecessors in various ways. Looking back on the supervision work in recent years, what impressed me the most is that to do a good job in supervision, we must be rigorous and serious, and have a strong sense of responsibility. No matter how complex the project is, as long as it can perform its duties in strict accordance with the construction norms and regulations, it can fully grasp the whole project dynamics and control the whole project quality. At the same time, we should have high professional quality, and we can prompt each working procedure and every link in advance to eliminate possible quality problems in the bud.
Ideologically, we should conscientiously study Marxism-Leninism, Mao Zedong Thought, Deng Xiaoping Theory and Theory of Three Represents, seek truth from facts, constantly improve our political and ideological awareness and level, and constantly explore and pursue.
In learning, I have been strict with myself since I joined the work, taking my work seriously and positioning myself well. In my work, I always keep in mind that I should keep learning in my work and combine theory with practical work well. Constantly change yourself at work, put forward different requirements for yourself at the right time, constantly sum up experience at work, improve work ability, learn at work, and grow up gradually at work. self-assessment
In my past work, with the care of leaders and the support and help of colleagues, through continuous efforts, I have adapted to the pace of work and have certain technical work ability, but there are still some shortcomings. In my future work, I will strengthen my study, overcome my shortcomings and strive to continuously improve my professional and technical level. At the same time, I clearly realize that under the situation of rapid social development, I need to constantly strengthen theoretical study, especially the study of new technologies and theories, and be strict with myself.
Title evaluation summary 3
I have been working hard and studying the theoretical knowledge of my major since I joined the company. I have grown from a pure scholar who just graduated from school to a professional with solid theory and rich practical experience. After becoming the shift supervisor, I began to improve my management level and make myself a compound talent with both ability and political integrity, professional skills and management ability.
20_, I ended my four-year school life and came to Qingdao with my professional training at school. Come to this place facing the sea and blooming in spring. I remember that at the graduation ceremony, the principal told us earnestly that "Shandong Electric Power School was founded in 58 years and trained more than 10,000 key talents for Shandong electric power system. It is precisely because our students can afford to go anywhere that they have won a great reputation for the school. " From then on, I made up my mind to study more, practice diligently, strive to become the technical backbone of the company as soon as possible, and prove myself with professional knowledge and reliable technology.
When I came to the company, it was the second year of its establishment. I remember that the heating scale was very small at that time, and the company only had two boilers. However, the atmosphere of the company is very good, and leaders and colleagues take care of us and place great hopes on us. In order to let us learn more professional knowledge, the company arranged for us to go to Jinan Mingshui Thermal Power Plant for business training, mainly on the operation technology of circulating fluidized bed boilers. Mingshui Thermal Power Plant is the training base of Jinan Boiler Factory and one of the first places to run circulating fluidized bed boilers in China.
Mingshui Thermal Power Co., Ltd. has established a complete boiler theory and practice training system due to its perennial external training. There are also specialized business personnel to explain theoretical knowledge to us, and we also enter the actual work and participate in their operations. It laid a good professional knowledge for me at that time. Lay a foundation for future practical work.
After three months of training, I devoted myself with great enthusiasm to the preparation for the heating season in 2002-03. At that time, I participated in all preparations for boilers and systems, including external network water injection, boiler water injection pressure test, boiler ignition preparation, and auxiliary engine commissioning.
It was particularly cold in winter that year, but we participated in the heating operation with great enthusiasm. At that time, it was mainly in the learning stage, but under the supervision of the masters, the inspection and maintenance of auxiliary machines and the adjustment operation of boilers under normal conditions were carried out.
The stage of ignorance soon ended, because we had a good knowledge reserve in the early stage and quickly adapted to the work rhythm and basic technical operation when we entered the work.
By 03-_, the heating season, we can finish a lot of work independently. In the heating season that year, No.3 boiler of our company was put into operation, and No.4 boiler was under intense construction, so I participated in the trial operation and debugging of No.3 road and learned a lot from it.
In the past 20 years, in order to further improve the operation level of heating, the company organized us to study in Weihai Broadcom Thermal Power Plant to learn from others' operation technology and management methods. After coming to Weihai, we also changed from the initial learners to communicators. The training in Weihai gave me the biggest place, and I began to pay attention to the wear and tear of boilers. At the end of the training, I spent a long time discussing the wear and tear of circulating fluidized bed boilers. Including the anti-wear mechanism and how to arrange the structure effectively in the design. In addition, I began to pay attention to the effectiveness of the air preheater and began to think about the wear and corrosion of the air preheater.
The experience of these years proved my judgment at that time. Due to the aging of the boiler, the explosion of economizer and water wall has become the main problem of stable operation. The air preheater has also started the overhaul and replacement stage.
The main reason is the fly ash abrasion of economizer tube explosion, and the problem of air preheater is largely low temperature corrosion, which is also a problem I want to study and solve in the future operation. Wear and corrosion are inevitable, but we should slow down this process technically.
By _ _, I was promoted from assistant operator to boiler chief operator, and began to undertake the operation task of a single boiler independently. The main operator will start to stop the boiler independently and complete the important operation of the boiler.
In 20_ year, our company's 50mw circulating fluidized bed boiler was built, and I also participated in the debugging, because our first four boilers were 24mw circulating fluidized bed boilers with low temperature return produced by Taiyuan Boiler Factory. No.5 boiler is a high-temperature return boiler produced by Jinan Boiler Factory, and we have no operating experience. But we still rely on solid theoretical knowledge to overcome difficulties, successfully ignite and successfully spend that heating season.
20_ _ month, I began to meet new challenges and became the shift supervisor of Class C. At this time, although my professional knowledge is mature and my theoretical knowledge is deeper, I have no management experience. I began to change from purely technical work to professional and management work. Pressure motivates people, and difficulties challenge people. I'm beginning to feel that my knowledge is not enough. I used to be responsible for the operation of a single boiler, but now I have to consider the whole system. How to ensure the safe, economical and stable operation of the system?
Title Assessment Summary 4
Since 65438+ 10 and June was named as an assistant engineer, I went all out politically and finished all the work in my work. My personality is that my professional level has been greatly improved after five years of project practice. In the process of project supervision, I pay great attention to project quality management and participate in the safety management of the project and the collection and management of supervision data wholeheartedly. I have improved my management level and technical level from different angles.
In the process of project supervision, I participated in the blue prints.the design of all projects, the construction organization design of the project and the audit of various safety schemes, collected and filed the project supervision data, and cooperated with the leaders to solve the technical problems in the project. Both theory and practice have greatly improved their professional level.
Through the practice of the above projects, I have a further understanding of the supervision and management of engineering construction. Here I talk about my personal work experience on the above projects.
A, from the beginning of the project, I'll be familiar with the construction drawings, and the construction unit, design unit, construction unit for the blue prints.the design, put forward the problems that need to be negotiated with the design in the construction, to lay the foundation for future construction supervision.
Intransitive verbs strengthen the management of engineering supervision materials, which is also very important to the quality of supervision. The collection and arrangement of supervision data should be timely, effective and traceable, and the data must be complete, arranged and stored in order to bring the necessary technical basis for the project quality.
Seven, strengthen contact with relevant units, improve their comprehensive quality. Because the work of project supervision involves the construction unit, construction unit, design unit, municipal quality supervision station, municipal safety supervision station and other units, in order to do a good job of supervision, we must deal with all aspects of the relationship. In contact with various units, I communicated with all parties with a modest and cautious attitude, which won the support of all parties and improved my personal processing potential.
In order to improve my business level, I have participated in various studies and trainings in recent years, such as supervision engineer training, chief supervision engineer training, witness sampling training and various trainings organized by the company at the end of the year. I have passed the exam and laid a good foundation for my future work.
Over the past few years, through the training of on-site construction supervision, I have been strict with myself from all aspects, learning with an open mind, working hard and studying business knowledge assiduously, which has improved my comprehensive quality and laid a good foundation for better work in the future.
Title evaluation summary 5
Since I joined the work, I have strictly abided by the laws and regulations of the country and have never participated in any illegal and disciplinary activities. Resolutely support the leadership of the China * * * production party, adhere to the party's reform and opening up, and make due contributions to the construction of Socialism with Chinese characteristics. I strictly abide by the rules and regulations formulated by my work unit, be strict with myself and be lenient with others, and play an exemplary role. At work, I have been studying, researching and summing up experiences and lessons. From a layman in the construction industry, he has grown into an engineering data technician with comprehensive and mature professional technical potential and management potential. He has independently undertaken information work such as housing construction, bridges, roads and drainage, and has made great achievements in political thought, professional ethics and professional level. The summary is as follows:
I. Work attitude and career path
Because the work of a librarian is complicated, I always deal with things I encounter in my work with my heart. Although I occasionally have some emotional problems, I can handle my own problems quickly, devote myself wholeheartedly to my work, work hard, finish what I started, and treat every job correctly and seriously. Seriously study the company's rules and regulations, seriously abide by labor discipline, and ensure attendance on time. No matter how hard and tired the project is, I insist on the successful completion and make achievements, never care about personal gains and losses, and stick to my post.
Second, knowledge level and career potential.
At work, I keep learning cultural knowledge and professional knowledge, and strive to improve the knowledge level and special potential of Bai Ji. For the new specifications, standards and quotas of the construction industry, after each release, I will buy them, study hard, master them, apply them to engineering construction, and constantly sum up experiences and lessons. Every time the project is completed and accepted, I carefully make the project acceptance record, and compile it into a book, which is stored in my own project completion acceptance record file. I often analyze and study it. Work acceptance records, find out what problems exist in the project construction, what aspects can be improved and what aspects are worth continuing to carry forward.
Third, some experiences of technical librarians:
1. Define the division of responsibilities and supervise the implementation of the process. Timely collection and sorting, timely feedback. Regularly carry out data rectification and data verification again. Follow up the catalogue in time and file the perfect data. Through remedial measures, problems are found in time, rectification is carried out at the first time, and inspections are passed again and again.
2. Strictly control the construction technical data: the construction technical data is a document to guide the correct, standardized and scientific construction, and also a formal document to change the state of the project. However, historical changes, negotiation and blue prints.the design should be signed by the design and construction unit, the construction team and scheme should be approved by the company level, and the disclosure should be signed by the construction team. When engineering disputes or other special circumstances occur, these situations are the most basic and important information to solve the disputes. Therefore, this kind of materials should be strictly managed, and generally can't be borrowed to avoid loss. Therefore, we should borrow and implement a strict borrowing registration system. In addition, this project is designed and constructed at the same time, with frequent project changes and many design changes and project negotiations. Design change and project negotiation directly affect the construction progress and project settlement. If the change and negotiation are delayed and economic losses are caused, the hard work of the whole project will lose its benefits. Therefore, it is necessary to send changes and representations to the relevant personnel of the Japanese Ministry in time.
3. Construction survey records should be explained in detail with charts: Construction survey records are the data to determine the positioning, size, elevation and position of the project. "One short step makes a lasting regret", and it is not uncommon for the negligence of setting out to bring trouble to the subsequent construction. Therefore, the survey data must have detailed charts to ensure the accuracy of survey construction. For example, in the setting-out record of the floor plan, it is necessary to draw a sketch of the section of several holes, indicate the elevation size of the setting-out, and have a plane sketch. Plane setting-out requires axis size, end column section size, door and window position size, axis control line size, wall column edge line size. When setting-out external walls, doors and windows, a profile should be drawn, indicating the setting-out elevation size.
4. Construction records should be detailed and specific: Construction records are all kinds of inspections and records made to ensure the quality and safety of the project during construction. The information in the record should be detailed, not general, and consistent with the technical disclosure. Such as variety, specification, quantity, location, joint location, lap length, protective layer thickness, steel bar and pad binding, steel bar rust removal, etc. should be clearly written. When data appears, it is necessary to calculate specific values and avoid using standard languages. When there is any change or negotiation, the change information should be written clearly and its number should be indicated.
5, construction test records should be timely and complete. Qualified construction inspection is a prerequisite for the acceptance of the inspection lot (division) project. Such as reinforced connection test report is reinforced installation inspection.
6. The inspection items in the acceptance record of the inspection lot should be filled in completely: the inspection lot is the acceptance of the project, and the smallest unit is the basis for the quality acceptance of the sub-project and even the whole building project. Therefore, whether the evaluation of inspection lot is qualified directly affects the quality acceptance of sub-projects and even the whole construction project. Small items to be inspected in the inspection lot shall be omitted. If there are embedded items in the steel bar installation inspection lot with embedded parts, there are' construction joint items' in the concrete construction inspection lot with construction joints.
In short, information. This work permeates every corner of the project department, from the technical department and the engineering department to ministry of materials and equipment and even the operation department. All departments and personnel are responsible for each other, restricting each other and interlocking with each other. In particular, the requirement of data intersection is more like a rope, which tightly binds all departments and personnel related to entrance information, and requires all personnel related to data to keep pace and cooperate perfectly to resolutely prevent crime: domino effect. It's hard to be alone. Strong leadership and system are hardware guarantee, and high-quality and excellent professional staff are software guarantee. The combination of the two can create an invincible excellent team, and an excellent team can do first-class work.
With the rapid development of municipal infrastructure construction, municipal engineering data are required to be more comprehensive and perfect. Only by constantly learning and mastering new sorting methods can we do this work well. Rain goes to snow and rice, and wind goes over clouds. I will continue to adhere to the spirit of hard work, continuous exploration and overcoming difficulties, hold high the great banner of high-quality projects, stick to the good and discard the bad. As long as you constantly improve your self-cultivation and love your work, you will certainly gain something. It's a long way to go, Xiu Yuan.