Construction supervision enterprises shall conduct safety training for all employees at least several times a year.
Construction supervision enterprises shall conduct safety training for all employees at least once a year.

I. Main contents of safety training

1. Conduct on-site regulations and discipline education. The main contents are: the basic knowledge of engineering construction characteristics and construction safety; The safety production system, rules and regulations and safety precautions of the project (including the construction production site).

2, this type of work post safety operation and security team system, discipline education, the main content is the characteristics of the team work and safety operation procedures.

Second, the purpose of safety training

The purpose of construction safety training is to improve the safety quality of construction team; Improve the awareness of construction workers on the importance of safe production and enhance the sense of responsibility for safe construction.

Improve the consciousness of the majority of construction personnel to abide by rules and regulations and labor discipline, and enhance the legal concept of safe production; Improve the safety technical knowledge level of construction personnel, master the operation technical requirements and the ability to prevent and deal with accidents.

Summer flood control safety training program for construction enterprises;

I. Necessary conditions

1. Set up a flood control team to direct flood control arrangements on site, with clear internal division of labor to prevent management loopholes.

2, according to the civilized construction section division of flood control and drainage responsibility area, formulate detailed responsibilities and authority, and the responsibility to people.

3. Make technical disclosure to relevant technical management personnel, and make clear the general idea and specific deployment of construction measures.

Second, the material preparation

1, rain boots, raincoats and other rain gear are complete.

2, flood control materials ready.

3. Emergency medical devices such as heatstroke prevention and cooling drugs for employees.

Third, matters needing attention

1. In case of heavy rain or rainstorm, open-air construction should be stopped.

2, the rain period to ensure that the construction road is not soaked by rain.

3, the construction area should be timely cleaning or drainage water, local sump or seepage well.

4. After the rain, the operation that can lead to the collapse of the foundation pit should be suspended, and the operation should be resumed when it reaches the construction conditions after drying.

5, submersible pump and other electrical tools used in the rain period must use waterline (or waterproof cable), and check regularly to prevent short circuit or electric shock accidents.