What is the standard process of weak current engineering construction?
The article comes from the sincere network, and the text is as follows

The construction of weak current project needs to follow the correct and standardized process operation to ensure the smooth completion of the project. Many new weak current workers may not be familiar with it. In order to let everyone finish the project faster, safer and more effectively in the construction of weak current engineering, this paper summarizes some previous experiences of weak current engineering construction and shares them with you.

A, weak current engineering construction process

(1) In order to ensure the smooth completion of civil engineering, the system reserves holes and embedded pipes to coordinate with civil engineering. In the basement project in the early stage of civil engineering, it is necessary to cooperate with the architectural design institute to improve the supplementary design of weak current construction drawing of reserved holes and embedded pipes in the basement and main building, which involves the reserved holes in the network integrated wiring system and the embedded management of fire protection and security systems.

This part of the pipeline reservation is mainly completed by the general contractor, but the pipeline design needs a design institute or system integration company with design qualification. The main work of this part is communication.

(2) After the civil engineering is basically completed, the construction of trunking frame should be coordinated with the civil engineering and various weak current systems. The installation of trunking frame of weak current system should be carried out at the same time as the installation of air ducts, water supply and drainage pipelines and other management channels, or it can be a little later than the pipeline installation for a period of time (about 20 working days), but the reasonable placement and coordination of trunking frame and pipeline of weak current system must be solved in the design.

This part of the work focuses on the improvement of bridges and pipelines, involving bridges and pipelines within the scope of the contract. After the completion of civil engineering, the work should be promoted in time and the design and construction that meets the requirements should be carried out as soon as possible. If it does not meet the requirements, it should communicate with the design institute or the professional engineer of the construction unit.

(3) The construction of the control room is divided into two aspects: 1. The decoration of the control room is carried out by us, and we should submit the necessary conditions for construction to Party A so as to finish the work on time. 2. If the control room is built by other units, the completion date and functional requirements of the control room after completion shall be put forward. If necessary, we can provide a design plan. Before the foundation decoration of the central control room is completed, the equipment layout should be designed in advance and the construction should be carried out as planned. Pay special attention to the locks in the central control room and wiring room.

(4) Work closely with the decoration project to locate, install and connect the terminals of the field installation equipment of the weak current engineering system.

(5) Due to the scale and complexity of the project, the debugging cycle of the whole weak current system is scheduled in time, and the length of the cycle may vary greatly, so it is not necessary to wait until all the equipment has been debugged.

(6) It is recommended that all systems be successfully debugged, and the system acceptance can only be carried out after the corresponding function and performance tests prove qualified. And after the completion of the acceptance documents of the whole weak current system and the normal operation of the system for one month, organize the completion settlement.

If there are individual systems on site that cannot be completed, check the handover separately, and don't wait.

Second, the important link of weak current engineering construction

(1) The joint examination of weak current engineering construction drawing is an extremely serious and important technical work. Doing a good job of joint review of drawings seriously plays an important role in reducing errors in weak current construction drawings and ensuring and improving engineering quality. Before the blue prints.the design, our project team will provide detailed weak current construction drawings to the construction unit, supervision unit and electromechanical subcontractors. All units should carefully read the construction drawings, be familiar with the contents and requirements of the drawings, sort out the difficult problems, record the problems existing in the drawings, and solve them in the design disclosure and blue prints.the design.

Many projects may not need this work, but for normal construction, we can ask for drawings of decoration, greening, electromechanical installation, etc. , control our construction drawings, deepen the study, if there is any conflict, if necessary, send a contact list to the supervision unit (construction unit).

(2) The arrangement of weak current construction period mainly includes: system design, equipment manufacture and procurement, pipeline construction, equipment acceptance, equipment installation, system debugging, training and system acceptance, etc. At the same time, the coordination and confirmation of weak current engineering construction interface should form minutes or interface coordination documents.

There is great uncertainty about the weak current construction period, but we also need to make a relative plan. We must know the preconditions of construction, and we must give timely feedback on the problems that hinder our construction.

(3) The technical disclosure of weak current construction must be written, and it may not even be mentioned at the end of the project, but it must be done and signed!

What is emphasized here is the technical disclosure work within the integrated wiring project team.

1. In order to make clear the characteristics, technical quality requirements, system division, weak current construction technology, weak current construction points and matters needing attention of the construction tasks undertaken, so as to complete the tasks in a planned and organized way, professional engineers can further help technicians understand and digest the drawings.

The second is the specific requirements of engineering technology, safety measures, construction procedures and tool configuration. Everyone has a detailed explanation, so the responsibility is clear and personal.

The main contents of weak current technical disclosure include: the performance and operation methods of new technologies, new processes, new equipment and new materials adopted in construction, precautions for embedded parts, and technical disclosure will be recorded accordingly.

The correct process of the above weak current engineering construction is relatively perfect, and practitioners in the weak current engineering industry can learn about it and apply it in practical projects.

Content reference: the correct process of weak current engineering construction?

I hope it helps you.