In the next four years, the connectivity of basic transportation facilities will be improved to some extent. For example, Huoshaozhai-Longxian Expressway, Qiupo-Xunyi Expressway, Hou Yu Expressway Yellow River Bridge, Wuwang Pontoon Bridge and Fenglingdu Yellow River Bridge have been completed and opened to traffic, and the national highway 108 Yumenkou Yellow River Highway Bridge approach project has been opened to traffic in two places. In terms of railways, the Xi 'an-Yinchuan high-speed railway has been opened for one year, Xi 'an Yan 'an and Xi 'an Ankang high-speed railways will be started in the middle of this year, and the tenth high-speed railway in the west will be officially completed, which will promote the preliminary work of the Pingyang-Qingyang railway and the Zhongwei-Pingliang section of Baozhong Middle Line. The third phase expansion project of Xi Xianyang International Airport and the second phase project of diverting Han River into Wei River are in full swing. At the same time, the Lanzhou-Dingxi-Pingliang-Qingyang-Yan 'an high-speed railway is planned and studied.
In terms of scientific and technological innovation, the new entrepreneurial power platform that has repeatedly made headlines is undoubtedly a new track for the integration of innovation chain and the industry in the future; In terms of opening up to the outside world, China-Europe train Chang 'an has opened sea-land combined transport and assembled more than 0/0 trains, covering the whole Eurasia and radiating the Yangtze River Delta, Pearl River Delta, Beijing-Tianjin-Hebei and other tourist destinations. Core indicators such as traffic volume and heavy container freight rate rank first in the country for a long time; With the encryption of all cargo routes, the annual cargo throughput of Xi Xianyang Airport will exceed 400,000 tons, and a new pattern will basically take shape. ?