Documentary annual work summary ppt model essay 2022 1 During the 1 year of xx Hotel Supervision Department, with the correct guidance of the leaders and the help of all colleagues, I dutifully supervised and inspected the information of the construction unit and the supervision information of the supervision department, and at the same time humbly learned from my colleagues around me during the work.
As the project documenter of xx Hotel, my main work is as follows:
1, cooperate with professional supervision engineers to strictly control the engineering data of each construction unit.
Because the engineering data truly reflect the achievements of engineering construction, these data constitute various forms of information records in the process of engineering construction. If the construction unit fails to submit the progress information due to busy work, I will remind it to submit it for approval in time to ensure that the construction information is synchronized with the progress.
2. Be responsible for receiving, counting, registering, distributing, filing and managing all documents of xx hotel project.
The received documents are classified, registered and filed in strict accordance with the "Classification Table of Supervision Data of Site Supervision Institutions of xx Co., Ltd.". Do a good job of collecting and sorting out information, borrowing from colleagues and checking by leaders, and I can take it out in time. Document distribution is recorded in detail to ensure the traceability of each document. If there is any dispute about the loss of information of the construction unit, the whereabouts can be found in the sending and receiving records. Do a good job in logistics, clean the office early every day, create a good working atmosphere, fill in the barometer, distribute labor insurance supplies in place, and lack timely statistics and supplements for office supplies.
3. Prepare meeting minutes and monthly supervision report.
Meeting minutes and monthly supervision report are the summary of project progress and supervision work, and also the important basis for relevant departments to check and evaluate the work of supervision department. The minutes of the supervision meeting must be true and effective, so I insist on attending the supervision regular meeting and special meeting every week, and prepare the meeting materials in time after the meeting and distribute them to all contractors.
Define the procedures for submitting materials to the construction unit for approval: submit the construction organization design and special construction plan in strict accordance with the principle of scheme first, and organize the construction after approval. During the construction process, the quality inspection lot and hidden acceptance record of each process must be submitted to the supervision department in advance, and submitted to the professional supervision engineer for on-site acceptance on the basis of complete information. The data submission and approval process shall be carried out in strict accordance with the agreement.
According to the contract, the project goal of Hefei Phoenix Hotel is double demonstration sites and amber cups, and the apartment building strives for "xx Cup" as a provincial high-quality project. The xx hotel project is a key project in the Economic Development Zone, and the quality inspection station in the Economic Development Zone is a key supervision unit in Hefei. Therefore, various safety and quality inspections of government departments are frequent, so I can bring them in time when I check the information and answer the questions raised by the inspectors. When the information of the construction unit is lost and borrowed from me, I can get it in time. After unremitting efforts, several inspections by government departments have passed smoothly. My personality is 65438+the inspection of the security checkpoint on February X, which won unanimous praise. I will continue to work hard and make unremitting efforts.
Supervision data is a real record of supervision work in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal supervision work. Supervision data reflects the level of supervision work and is an important basis for measuring and evaluating supervision work. Only when all the links are well done can the supervision work be successfully completed.
There are also many shortcomings in the work process. In the new year, I will sum up myself, consult my colleagues humbly and do a good job in every data management.
In the past year, through the support and help of leaders and colleagues, I have a clear understanding of my job responsibilities and a deeper understanding of data management and construction technology management. As a member of the engineering department, I feel a great responsibility. The following is my summary of my work:
First, study hard and establish a clear ledger.
Although I studied landscape engineering technology and knew something about architecture, I didn't know what to do when I first came into contact with information. When I started working, it was about six months after the project started. Under the guidance of leaders and colleagues, I began to learn from the most basic. At first, I was a little at a loss. I silently said "I can do it". While encouraging myself, I worked overtime to make overall arrangements, reducing rest time and ensuring that my work was completed on time, accurately and efficiently. Under the guidance of the project leader, I constantly learn and enrich my theoretical knowledge, and sum up some good methods to manage data in practice. My experience is: to do fine management, we should establish and improve the ledger system, establish an electronic catalogue, and keep in mind the location of data storage and filing. Always keep a clear head on information, and the most important thing is to be serious. Up to now, every technical document has been clearly filed. Do it calmly every time you check the data size.
Second, be proactive and complete the task in time.
There are many kinds of technical data, and different technical data are received every day, such as test data, measurement data and quality inspection data. At first, they were very busy, but they were very inefficient. After continuous analysis, summary and innovation, reasonable arrangement of work priorities can not only ensure the correctness of all kinds of data archiving, but also greatly improve work efficiency. One day is easy, two days is ok, and the most rare thing is persistence day after day. I always believe in the belief that "what can be done today, do it today", and do it later. It is precisely because of my lack of persistence this year that the monthly measurement data can be accepted, handed over and filed smoothly.
Third, stick to your post and expand your knowledge.
The technical data in the project is one of the most important bases for our site construction, and it is also an important basis for ensuring the feasibility and safety of site construction. As a data manager, we must be serious and responsible in our work, establish a strong sense of post, and guard against the leakage of technical data. In engineering data, data is on the one hand, and it also involves measurement and test work. Under the leadership of leaders and colleagues, I went to the construction site to learn some practical knowledge of field measurement and testing, and did it myself and studied hard.
Fourth, the existing problems:
My own work experience is insufficient, and the study of theory and professional knowledge needs to be further strengthened, which is still far from the actual requirements of data collation. It is necessary to give full play to subjective initiative and strengthen the ability to deal with emergencies and the mastery of professional skills.
(2) You need to further improve your communication and coordination skills. Because of your straightforward personality, your speech hurts people, so that you encounter difficulties in communication. You must strengthen your communication, exchange and coordination skills in the future.
(3) Some jobs are not grasped tightly. It is easy to produce impatience, so we should strengthen our cultivation.
(4) there is a certain slack in the inspection of engineering data, and the data is not signed in time. In the future, with the progress of the project, I will compile, sort out and report on time as required.
Therefore, for the shortcomings in the above work, I will learn from them seriously, overcome them, study professional knowledge seriously, improve my working ability and efficiency, and make myself handy in my future work.
In short, through more than a year's efforts, I can seriously study various norms, hone my thinking through my post, have a certain working ability, and have accumulated some experience in data collation.
Annual work summary ppt model essay 2022 featured article 3 As time goes by, one year will soon pass. At the end of this year, I will review my work in the past year, calm down and sum up my achievements and gains, and find out the shortcomings for my future work. Summarizing the work in the past year, I sincerely hope that you will give me tips on improper summary, which will help me a lot. With the strong support and care of the leaders of the company and the project department, I earnestly adhere to the guiding ideology of pre-control, standardization, science and high quality, firmly establish the service tenet of ensuring the satisfaction of every owner, and work hard wholeheartedly. The following is my summary of 20xx:
I. Information management
(1) Correspondence between units shall be registered by unified number, and then the receipt processing sign shall be filled in, submitted to the director for examination and approval, and submitted to the reading clerk as instructed, and timely urged to be processed on schedule;
(2) In order to facilitate the preparation of meeting minutes, I attend every meeting on time and keep records, because the minutes are an incisive exposition and highly summary of the meeting contents, which is higher than the meeting minutes. This involves the transformation from oral language to technical terms. If I don't understand anything, I will take the initiative to ask my colleagues and try to make my work more perfect.
(3) Most of the data of the monthly supervision report comes from the monthly construction report. Before making the monthly supervision report, we should carefully study the monthly construction report, and the details must be thoroughly understood. Only in this way can we judge whether some situations are true or not.
Second, the quality control of engineering construction
(1) After receiving the engineering construction drawings, I will be familiar with the drawings, understand the design intent, understand the main technological process and engineering characteristics of the construction process, record the objections on the construction drawings in writing, and submit them to the chief supervision engineer at the meeting of the blue prints.the design, which will be made clear by the design;
(2) Process control of all incoming materials and semi-finished products. In addition to checking the relevant inspection data submitted by the construction party according to the standards and design requirements, I also do a good job of visual inspection of the appearance quality of the materials when they enter the site, so as to prevent the unqualified appearance quality from being used in the project. For the construction of key parts of the project, I will arrive at the station ahead of time, check the construction preparation, and do the whole construction process in a timely and completely true way. Do a good job in daily patrol, patrol and inspection of each process of general construction. Timely notify the project management department of the construction unit of the problems found in the patrol, patrol and inspection of each construction process orally or in writing, report the problems to the director in time, and urge the construction unit to carry out rectification and review. Try my best to do a good job of quality control before and during the construction of the project construction supervision, and do what I should do dutifully.
Three, safety and civilized construction control work
By studying the Law on Work Safety and my own experience in the process of work, I have established the viewpoint that safety prevention comes first, that is, work should be done well first, because accidents can be prevented, but they are unpredictable, and corresponding inspection systems should be established, and hidden dangers should be rectified in time. The supervisor has an unshirkable responsibility for the safety of the construction site. In addition to the daily safety inspection and supervision and management (filing and sorting of relevant data records), we should adhere to the daily safety education of the construction unit, technical post safety technical education and post safety technical disclosure inspection (including safety account and written materials), conduct a comprehensive inspection of the site construction safety status regularly or irregularly every month, and archive the safety inspection records. According to the requirements of company leaders for engineering safety control, deepen supervision and management, and timely issue rectification notices for existing problems. The construction unit is required to make timely rectification, urge rectification and re-inspection. My experience is that in the concrete work practice of quality control in engineering construction supervision, especially in the control of safe and civilized production, the four-post system should be achieved: eye post (to be able to find problems in advance); Attendance on foot (mostly on-site rotation, patrol and inspection); Keep your mouth shut (talk more about the problems found); Manual attendance (make relevant records in time and notify in writing); Only by strengthening the inspection work and strengthening the control in the process can we do the work well and seriously. The work in 2000 was busy and full. In order to perform the supervision duties well, we should work actively, work hard, obey the arrangement of the leaders, never shirk, and think of the project wholeheartedly.
4 1, annual work summary ppt model essay selected articles In 2022, the project will enter the stage of foundation and main body construction, with many construction teams and projects, involving complex technical data, which is also a test for my work potential, and I will, as always, earnestly perform my duties. Strengthen the supervision of civil engineering, installation and safety data of all construction units, and consult them regularly to ensure that the technical data are timely and complete and meet the acceptance requirements of quality inspection stations.
2. Seriously receive, record and archive all important documents and letters in the construction process.
3. Assist various professional engineers in the engineering department to do a good job of sorting and filing all construction materials.
I feel very lucky and proud to be able to participate in the construction of community living security housing in Qiao Lin, a project with large scale, many construction projects and complete supporting facilities. Compared with other colleagues, my strength is insignificant. I hope leaders and colleagues will criticize and correct my shortcomings in future work. I will sum up the shortcomings of the past, continue to work hard and contribute my meager strength to the construction of the company!
Time flies, the sun and the moon fly like a shuttle. In a blink of an eye, a year passed quietly, which was a precious experience in my life and left me with beautiful memories. During this time, the project gave me enough support and help, which made me fully feel the broad mind and personality charm of the leaders, the meticulous care of my colleagues, and the atmosphere of unity, friendship and solid progress of the Liaobao project. At the same time, I am also moved and happy to have the opportunity to become a member of the project department of xxxx Cultural Plaza.
In the process of data collection and arrangement, it is a tedious process for librarians to classify and file all kinds of data received and compile a sub-directory. The following two measures have been taken in this project, which greatly improved the work efficiency and ensured the work quality.
First, compile a general catalogue of dynamic data to facilitate data retrieval.
The "Regulations" divide the general data catalogue into eight types of data, specific to each volume of data in the box. The general catalogue of materials is constantly updated with the increase of construction progress and materials, and a remarks column is set behind each volume of materials in the general catalogue to indicate the problems found in each volume of materials. All the information is clear at a glance through the general catalogue.
The second is to compile the sub-item catalogue with excel.
Most people use word to catalogue, but the efficiency and function are far less than excel. Excel has the following advantages in cataloging.
1, the operation is simple and quick. First of all, the mode of multiple workbooks in the same window provides a lot of convenience for the unified classification and management of data. In addition, the functions of automatic cell filling and custom data format make it easy to operate quickly. If you enter "20xx 165438+ 10/5", just enter "9-1-15" after the user-defined data to display "20xx16544".
2. Assist in statistical summary. Through its "filter" function, data can be filtered and summarized according to conditions. If you want to query whether there are enough witness batches of rebar connection test reports, just select "Witness" in the screening criteria, and excel will list all witness test reports. Divide the number of witness test reports by the total number of reports to calculate the witness percentage of steel bar connection test. Or to evaluate the strength of c40 concrete in the project, as long as "c40" is selected in the screening conditions, all c40 test reports will be listed one by one, including the report contents such as molding date, construction site and strength.
3. Intelligent error correction function. In excel, you can limit the value range of data in cells, and a prompt dialog box will pop up when it exceeds the range. For example, the qualified value of "σs ratio /σs standard" in the original steel bar inspection report should be ≤ 1.3. After setting in excel, when the input value is >; 1.3, the system will pop up a "unqualified" prompt to avoid input errors or help find unqualified materials.
Data work has penetrated into every corner of the project department, from the technical department and engineering department to ministry of materials and equipment and even the operation department. All departments and personnel have their own responsibilities, which are mutually restrictive and interlocking. In particular, the requirement of data intersection is more like a rope, which tightly binds all data-related departments and personnel in the project department, requiring all data-related personnel to keep pace and cooperate perfectly to resolutely prevent domino effect. It's hard to say, strong leadership and system are hardware guarantee, and high-quality and excellent professional staff are software guarantee. The combination of the two can create an invincible excellent team, and an excellent team can do first-class work.
Rain turns into snow, and wind passes through clouds. In the brand-new days, we will continue to adhere to the spirit of hard work, continuous exploration and overcoming difficulties, hold high the great banner of high-quality projects, adhere to the good ones, discard the bad ones, and let materials in to the next level.
Annual work summary ppt model essay 2022 selected articles 6 20xx year is coming, and the new year is coming. After working in our company for more than four months, I have learned a lot of things that I can't learn in class and things that I can't see in class, which has benefited me a lot.
On August 3rd, 20xx, I was hired to work in our company, and was assigned to the project supervision department of plot F, Balitai Demonstration Town, Jinnan District, Tianjin as a documenter. In these months, my leaders and colleagues have given me great care and help, and I want to express my heartfelt thanks to them. During my work, in order to fulfill my supervision duties, I worked actively, worked hard, obeyed the arrangement of the leaders, never shirked, wholeheartedly considered the project, worked hard with good professional ethics and a strong sense of responsibility, and lived up to their trust in me. With the help of colleagues, the corresponding tasks were successfully completed, and at the same time, they were recognized and praised by other units (construction units and construction units). Now I will make the following summary of the work in these months.
When I first arrived at the construction site, I was a stranger and lacked work experience. I am not very clear about the concept of supervising librarians. I met many difficulties in my work. I didn't give up, but actively sought advice from my predecessors to adapt myself to the working environment of the construction site as soon as possible. At first, I thought that the documenter only received and distributed information or completed the word processing work of the project supervision department, but with the progress of the work, continuous learning and patient guidance from my colleagues, I have the ability to engage in this work. At the same time, we have a further understanding of the concept of supervision information: supervision information is the result of supervision work of every project supervision department, and what the supervisors have done and what problems have appeared in the construction process after the completion of a project supervision work can only be reflected through supervision information. Supervision materials are effective evidence for the self-protection of project supervision department personnel. Supervision is a kind of risk management. There are many risk factors in the project construction process. As long as the supervisors work hard, find hidden dangers, use the contact list or notice of the supervision engineer correctly and timely, and leave written traces, they can provide effective protection for the supervisors. The quality of a project can be reflected not only by the project itself, but also by data, which can reflect the use of materials in the project, whether each process meets the relevant requirements and whether it is constructed according to the construction drawing. As a supervisor librarian, we must strictly control this level and do a good job in collecting and sorting out information.
When I arrived at the construction site, after the leader made clear his job responsibilities and division of labor, I immediately began to consult relevant materials, documents and technical specifications, and soon entered the working state. Through these months' work, I know my work tasks are as follows:
(1) After receiving all kinds of information and documents issued by the superior, register and file them in time and distribute them to the project department of the construction unit in time.
(2) Complete the transmission of engineering data in time. After receiving all kinds of materials submitted by the construction unit, the preliminary inspection shall be conducted in a timely manner, and the qualified materials shall be distributed to the project leader and various professional supervision engineers for review, and the unqualified materials shall be fed back to the construction unit in time, requiring them to review or rectify in time and submit them again for review.
(3) Complete the word processing work of this department in time, and cooperate with various professional supervision engineers to prepare work contact list, supervision notice and supervision weekly and monthly reports.
(4) For the information submitted by the construction unit, pay attention to check whether the data reporting time is consistent with the time of each construction process on site, whether the reporting content is consistent with the drawing specification, and the information that does not meet the requirements shall be reported again by the construction unit. ⑤ Complete the collection, sorting, summary and filing of engineering data.
As a supervisor, I have worked hard and sweated a lot in retrospect. While affirming the achievements, there are still many shortcomings in the work:
1, the information reported by the construction unit is not timely and often makes mistakes, resulting in the loss of information in the process of receiving and sending, which brings unnecessary trouble to the project supervision department.
2, meeting minutes, supervision notice, supervision contact list, etc. Sometimes I can't communicate in time.
3. The monthly supervision report is incomplete, and sometimes the information submitted by the construction unit lags behind, which leads to the failure to collect and sort out the monthly supervision report in time.
4. Due to the lack of understanding and experience of the document registration system, it is not convenient for future reference.
5, due to the lack of thorough knowledge and understanding of norms and supervision procedures, so the decision-making ability in the work is poor.
Faced with these shortcomings, we must correct them in future work and strive to perform better in future work.
Work experience is enriched in the process of continuous accumulation, and I have accumulated a lot of experience in several months' work: in the process of engineering construction, site and information complement each other. Documentary should not only collect and sort out information, but also understand the site construction situation and materials entering the site, so as to urge the construction unit to do a good job in concealed engineering inspection, building materials inspection and sampling inspection in time. At the same time, as a supervision documenter, you should also be familiar with the relevant construction technology and construction specifications, which is what most supervision documenters lack, and every supervision documenter must strengthen his study. Only in this way can we work with the data. Therefore, as a supervising librarian, we must strengthen the connection between information and site, and make the site and information correct, so as to really do a good job of supervising librarians. In the future, I will be more strict with myself, study hard, constantly update and supplement new knowledge, improve my professional level and work ability, sum up experience, and better complete the supervision work. And the annual urban data inspection passed smoothly.
The above is what I have gained from my work in the past few months, and I am deeply touched. A good professional librarian is tempered by long-term work practice, learning and improving his working ability when he is away. As a supervisor librarian, in addition to learning from colleagues around him, we should constantly learn new knowledge, because the society is progressing and the technology and materials are constantly updated. Only by constantly learning and supplementing our own shortcomings can we meet the needs of social development. In short, in the future work, I will constantly sum up and reflect on myself, constantly push myself, enrich my energy, and improve my quality and professional level through exchanges and mutual learning with colleagues, so as to adapt to the development of the times and enterprises and make better contributions to the company.
Hebei hongtai engineering project consulting co., ltd
Tianjin balitai supervision projects department
xxx
20xx65438+February 9th
Documentary annual work summary ppt model essay 2022 featured article 7 Leaders:
I am the documenter of Huayang Hongda Project Department, and I started work on April 14, 2065438. After working in the company, I can fully unite my colleagues to explore and innovate together, earnestly perform the duties of librarians, and fully understand and master some knowledge and skills needed for the job. Below, I will make a brief report to the leaders on the work during this period. Please criticize and correct the shortcomings.
I. Work content and technical aspects
From April 20, 65438 to May 5, 2008, I worked in the project department of Metropolitan Haoting. My main work contents are: 1, 1-4 # building decoration and roof inspection lot; 2, the main information according to the process classification summary and improve the signing time; 3, roofing, kitchen, bathroom waterproof engineering hidden information and impermeability records; 4. Summary of various materials; 5. Measured household acceptance data of1# building. 2065438+0 * Since May 6th, I have worked in Huayang Hongda Project Department. My main work content is: 1, improving the content in the box from Anyi to Anyi; 2. Cooperate with the potter to improve various individual schemes; 3. Improve information such as commencement report and positioning; 4. Drive Xiao Wang to improve the basic data of septic tanks and tower cranes; 5. Promote Xiao Wang and Xiao Li to collect the information that each team and subcontractor need to provide to the project department before entering the site.
In daily work: share your accumulated experience and working methods with former colleagues, communicate with colleagues on unknown knowledge and professional skills, or consult colleagues in other project departments to make progress. During this work: I seriously obey the leadership arrangement, abide by the company's rules and regulations and requirements, pay attention to my image, and develop a good work style.
Second, experience and experience
In the days when I worked in the Metropolitan Haoting and Huayang Hongda Project, I made new progress in my study, work and thought, and my comprehensive quality was further improved. Looking back on my work during this period, I have the following experiences:
1. At work, the construction materials must be synchronized with the site, and the relevant units must sign for improvement in time (including improving the signing time) to avoid unsuccessful signing afterwards; Collect the certificate or inspection report of raw materials in time, witness the sampling inspection in time according to the specification requirements, and avoid supplementing the information afterwards, which is inconsistent with the previous data; Before proceeding to the next division project, sort out the data of the last division project.
2. I deeply realized in my work that the company is a United and struggling collective. In such an atmosphere, only by maintaining a high degree of consistency with the company and being proactive can we integrate into this collective. Therefore, it is necessary to further improve the overall quality of individuals, arm their minds with theoretical knowledge, guide practice, scientifically study, think and solve problems encountered in their work, and make them progress together with the collective.
3. Know yourself correctly, constantly exercise your eloquence, communication ability, adaptability, coordination ability, organization ability and innovation ability, and constantly learn, forge ahead and improve yourself at work.
Three. suggestion
Can the company formulate a system so that employees engaged in the project can take a day off every Saturday or Sunday while improving their work, so as to improve their positive work attitude and work efficiency?
The above is just my personal opinion. If there is anything wrong, please criticize and correct me!