Tile laying steps
Clean up the construction site

Before the shop is stuck, the construction site must be cleaned to ensure that the base surface is dry.

Mixed tile glue

Need to use professional tile glue for paving. Stir the tile glue and clear water evenly without caking, let it stand for 5 minutes and then stir until a part of the tile glue is scooped up with a scraper and does not fall off after turning over, which is regarded as successful stirring.

Apply tile glue

Use a spatula to coat the tile glue slurry on the back of the tile, and scrape the tile glue into strips to ensure that it is completely coated on the back of the tile and the base.

Use a three-jaw glass sucker for positioning.

Paving is assisted by three-jaw glass sucker, which moves smoothly and is placed on the base surface.

Use tile leveler

Then use a tile leveler to vibrate horizontally on the tile surface and empty it.

Use leveling machine

Insert the level base at the positioned edge, clamp the level with a wooden wedge after leveling, and then continue to horizontally vibrate the tile level on the brick surface to do a good job of emptying.

Clean residual tile adhesive.

Clean up the residual tile adhesive in time after laying the big board, and clean and protect the surface.

Surface cleaning and protection

Clean the surface of the big board and then treat it with caulking agent to beautify it.