Chapter I General Provisions
Article 1 In order to strengthen the management of construction project cost management personnel, standardize their professional behavior and improve their professional level, these measures are formulated in accordance with the spirit of the Notice of the Ministry of Construction on Doing a Good Job in Industry Self-discipline of Construction Project Budget Personnel under the Centralized Management of China Construction Project Cost Management Association (JB [2005] No.69).
Article 2 The term "cost engineer" as mentioned in these Measures refers to the personnel who have passed the examination and obtained the qualification certificate of national cost engineer and engaged in engineering cost business (hereinafter referred to as cost engineer).
Article 3 China Construction Project Cost Management Association (hereinafter referred to as China Price Association) is responsible for the self-discipline management of construction project cost users throughout the country. Regional cost management associations or centralized management institutions (hereinafter referred to as management institutions) are responsible for the self-discipline management of local cost engineers under the guidance and supervision of local construction administrative departments. The Professional Committee of China Price Association (hereinafter referred to as the Professional Committee) is responsible for the self-discipline management of consumers in this industry. The self-discipline of the national cost engineer industry is guided and supervised by the standard and quota department of the Ministry of Construction.
Article 4 The Qualification Certificate of National Construction Project Coster is the qualification certificate of a costumer engaged in project cost business, and the qualification certificate of national construction project coster is supervised and managed by China Price Association.
Chapter II Qualification Examination for Cost Makers
Article 5 The qualification examination for cost engineers shall be based on the national unified examination outline, general majors and examination subjects, and the management agencies and special committees shall be responsible for organizing propositions and examinations.
* General majors and examination subjects
* General major:
:: Civil engineering;
* Installation works.
* General examination subjects:
* Basic knowledge of project cost;
* Civil engineering or installation engineering (you can choose either).
Other majors and examination subjects shall be set by the management agencies and special committees according to the needs of the region and the industry, and shall be reported to the China Price Association for the record.
Article 7 China Price Association is responsible for organizing the compilation of the national qualification examination outline for construction project cost engineers and the basic knowledge of project cost, and supervising and inspecting the examination work of various management institutions and special committees. Management institutions and special committees prepare examination materials for civil engineering, installation engineering and other professional subjects according to the requirements of the examination syllabus, and are responsible for organizing propositions, examinations, marking papers, determining examination qualification standards, issuing qualification certificates and making special seals.
Eighth abide by national laws and regulations, abide by professional ethics, meet one of the following conditions, you can apply to participate in the cost engineer qualification examination:
(a) professional engineering cost, technical secondary school or above;
(two) other majors, technical secondary school or above, working for one year.
Article 9 Graduates with a major in engineering cost above junior college may apply to the management organization or special committee for exemption from the Basic Knowledge of Engineering Cost.
Chapter III Management of Cost Members
Article 10 A cost engineer shall sign and affix a special seal on the project cost business documents he undertakes, and bear corresponding post responsibilities.
Article 11 For those who have passed the qualification examination for cost engineers, the management organization and the special committee will issue the national qualification certificate for construction project cost engineers and the special seal uniformly printed by China Price Association. The numbering rules and special seal style of certificates shall be uniformly stipulated by China Price Association.
Twelfth management agencies and special committees shall establish a cost information management system and a credit evaluation system, and publicly inquire about the qualifications, credit records and other information of cost personnel.
Article 13 If a cost engineer changes his work across regions and industries and continues to engage in the construction project cost work, he shall apply to the local management agency or professional committee for the change procedures and renew the qualification certificate and special seal with the transfer procedures, national construction project cost engineer qualification certificate and special seal.
Article 14 A client may engage in the construction project cost work that is consistent with the National Qualification Certificate of Construction Project Coster that he has obtained.
Fifteenth customers may not be employed in more than two units at the same time.
Chapter IV Continuing Education
Sixteenth continuing education refers to professional training and professional education to improve professional quality, update knowledge, learn new skills and master new methods.
Seventeenth management agencies and special committees are responsible for the compilation of continuing education textbooks and the organization of training in their own regions or industries.
Eighteenth cost personnel to participate in continuing education every three years, in principle, not less than 30 hours, management agencies and special committees can be adjusted according to needs.
Chapter V Management of Qualification Certificates
Nineteenth "National Cost Qualification Certificate" is verified once every three years in principle, and the management organization and special committee are responsible for the specific implementation.
Twentieth "national construction engineer qualification certificate" to verify the contents include my performance in the project cost work, continuing education, professional ethics and so on.
Twenty-first in any of the following circumstances, the verification is unqualified or the National Cost Qualification Certificate and the special seal are cancelled:
* No work performance;
* exit the engineering cost business post;
* Not attending continuing education as required;
(four) to obtain the "National Construction Project Cost Qualification Certificate" by improper means;
(five) there are bad records in the construction project cost activities;
(six) alter the "National Construction Engineer Qualification Certificate" and the special seal for lending;
(seven) practicing in two or more units in the name of a cost engineer.
Chapter VI Self-discipline Provisions
Twenty-second should abide by national laws and regulations, safeguard the interests of the state and society, be loyal to their duties, abide by professional ethics, and consciously resist commercial bribery.
Twenty-third should abide by the technical specifications and procedures of the project cost industry, to ensure the quality of the project cost business documents.
Article 24 The business secrets of the client shall be kept confidential.
Twenty-fifth individuals are not allowed to practice in their own names.
Article 26 Anyone who has an interest in the client shall voluntarily withdraw.
Twenty-seventh to receive continuing education, improve the professional and technical level.
Twenty-eighth acts in violation of national price laws and regulations, have the right to report to the relevant departments of the state.
Chapter VII Supplementary Provisions
Twenty-ninth management agencies and special committees shall, in accordance with these measures, formulate detailed rules for the implementation of their own regions and industries, and report them to the China Price Association for the record.
Thirtieth in the implementation of these measures, in case of problems, please timely feedback your opinions and suggestions to the China Price Association, which is responsible for the interpretation of these measures.
Article 31 These Measures shall be implemented as of the date of promulgation.
Just do these!