Water pipe installation budget: from details to total cost
The installation budget of tap water pipeline needs to accurately calculate the pipeline length, refer to the actual planned size, and consider that the actual material loss rate is about 30. This paper will introduce the core elements of water pipe installation budget in detail from the aspects of project type, budget breakdown, material cost, labor cost, machinery cost and management fee.

Clarify the type of project

Whether it is a new project or a renovation project, the budget consideration of waterworks as a municipal project is particularly critical.

Budget subdivision

The budget is subdivided into several parts, among which material cost, labor cost, machinery cost and management fee are the core elements.

Material cost accounting

Material costs cover core materials such as water pipes, and should be budgeted in combination with market prices, and the storage and transportation costs of materials should be considered. Each project has a specific calculation method, which is usually calculated in strict accordance with the regulations.

♂? Labor costs and management fees

Labor costs and management fees involve the remuneration of construction workers and managers, including transportation subsidies, medical care and education benefits.

Mechanical cost

The mechanical expenses include the rental expenses of forklifts and cranes used on the site.

The budget is about 18 yuan/meter.

Considering comprehensively, the installation budget of tap water pipeline is about 18 yuan/meter. According to your installation requirements, you can accurately estimate the total cost. Please note that the above prices are for reference only, and the specific prices shall be subject to negotiation between both parties.