Summary of automation engineer's work in 2022 (Part I) Dear company leaders:
Hello!
Thank you very much for unpacking my materials in your busy schedule! And wish your company a prosperous career, prosperous!
I am a 20xx undergraduate from Sichuan University of Science and Technology, majoring in measurement and control technology and instruments. I am eager to get a job in your company and contribute to your company. Please give me the opportunity to join your company. I have the confidence and ability to be an excellent employee.
During the intense and full four-year college life, I majored in a series of electronic and electrical professional courses, such as control instruments and devices, the principle and application of single chip microcomputer, intelligent instruments, plc programmable control, electrotechnics, analog electronics, digital electronics and automatic control technology, EDA, process control, automatic control principle, detection technology and instruments. In the control instruments and devices, I learned the composition principles and analysis methods of various instruments, as well as how to analyze the root causes of equipment failures and how to do it.
Improve electrical automation equipment to improve operational reliability; At the same time, through the study of this topic, I also learned about dcs system and FCS system. Through the introduction of Mr. Wang, I found many books in this field after class, and got a deeper understanding of the operation and troubleshooting of various production instruments and electrical equipment. Through the research of PLC programmable control system, we are based on Hitachi.
EM series products are programmed by ladder diagram language, Schneider Quantum series inverter and Siemens S7-200/300/400 programmable controller. By studying this course, I can design various typical programs. I think the knowledge I have learned in this major is very suitable for talent selection in your company.
Therefore, I take the initiative to ask your company to give me a chance to do my part for your company. Meanwhile, I can also use PROTEL.
PRO/E and other software, convenient for WINDOWS XP applications. Able to use TC to program in C language; Able to use assembly language for simple programming; Able to use PRO/E to draw complex engineering drawings; Mastering Protel skillfully
Software, which can be used for circuit diagram design and PCB wiring. I learned 5 1 systematically.
Series single chip microcomputer, single chip microcomputer language, single chip microcomputer
C language can be used well. While studying the theory, I also pay attention to cultivating my hands-on ability, and use PROTEL to draw the circuit diagram and design the laser speed measurement. Moreover, my graduation project is also based on the design of single chip microcomputer gps multi-antenna technology. In the design process, I comprehensively used the single-chip computer language, single-chip computer C language and VHDL language.
Language design software part, design circuit part with PROTEL. My understanding of what I have learned has been greatly improved.
I abide by all the rules and regulations of the school in my study career, never arrive late, never leave early, never miss classes, actively participate in various extracurricular activities, study hard in all subjects of my major, actively participate in various social activities, and strive to improve my quality, endurance, adaptability and adaptability. After insisting,
Hard and rigorous study and practice have improved my consciousness, established a correct outlook on life, values and world outlook, and mastered basic professional knowledge, practical ability and operational ability.
As a college student in the information age, I can skillfully use the internet.
With my past efforts and confidence in the future, I believe I can do my job in the future. When I first entered the society, I ended my simple campus life. Although I don't have rich work experience, I am very confident to face the fierce challenges and competition in today's society with all the practical courses I have learned at school. I am willing to accept the challenge of society and the strict test of your company!
I am conscientious, practical and willing to help others, and my interpersonal relationship and team are good.
The spirit of cooperation.
If hired, I will use what I have learned to work hard and serve the company.
I am here to convey
Salute!
xxx
X year x month x day
Annual Work Summary 5 Highlights in 2022 (Part II) I am xxx, male, and graduated from xxxxXXXXX. Since my work, I have worked hard to learn the theoretical knowledge and professional skills of this major, and paid attention to constantly improving my professional level and educational ability. And according to the actual needs of the unit operation and maintenance management, through spare time to learn in different forms, and strive to improve their professional and technical ability and level. In order to better adapt to my present job and do my job well, I attach great importance to continuing education and learning. In xx, xxxx, I studied power supply technology at xxxx Correspondence Station (xxxx Water Conservancy and Hydropower School) of xxxx University, and graduated smoothly in xx, xxxx. Now I report my work summary during the professional qualification to the superior leaders and experts, and apply for the professional and technical qualification of assessor-level engineer (electrical technician).
First, learn professional knowledge and improve job skills.
I officially joined the work in xx, xxxx, and engaged in the operation and maintenance management of the unit. At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work. In order to change my role as soon as possible and adapt to the requirements of work, during this period, on the one hand, I gave up my rest, studied for my major, and "strengthened my training" in a targeted manner; On the other hand, you should ask the experts more questions, think hard, do more, study hard and remember.
Second, professional work
1. XXxx xx years after graduation, I worked in xxxxXXxx hydropower development co., ltd from xx to xx.
The first and second hydropower stations are two cascade hydropower stations, which need to be rotated frequently. In addition, the cables in the first-class station have been burned by heating, and the diversion tunnel between the forebay and the powerhouse of the second-class station was buried by debris flow in the later stage of the project.
After the re-construction of the primary and secondary stations and the restoration of wiring, the drawings have actually changed too much. Through a period of familiarity and understanding of site conditions, learning and understanding of specifications, familiarity and mastery of drawings, and combining with specific site conditions, colleagues and teachers, redraw the electrical secondary diagram. During the annual overhaul of the unit, I participated in the maintenance team of xx people from xxxxx to XXXXX, and participated in the hoisting and cleaning of the generator rotor to the repair of the bearing bush.
2. I participated in the maintenance of hydraulic turbine, the cleaning of electrical equipment of booster station and the maintenance of secondary circuit from xx to xX during my work in Wulanghe Secondary Hydropower Station of 2. xxxX Hydropower Development Co., Ltd. in XXX. Once, when I was on duty, I found that the air supply brake of the steam turbine system was faulty, and 1 and Unit 4 started to stir when they stopped. I immediately reported the situation to the station leader, found relevant tools, and the shift supervisor began to investigate hidden dangers. After half an hour's hard work, the problem was finally solved and an accident was avoided. In order to expand my knowledge, I went to xxx Co., Ltd. in xxxx. After joining the company, I have been working in the front line of project construction and production. In the process of construction, I always actively demand progress, pay attention to the cultivation of ideological quality and the improvement of professional and technical level, and strive to become a new type of professional and technical personnel with firm belief, strict discipline, extensive knowledge, skilled business, ability to adapt to the requirements of market economy and competence in all work. Especially since I got the junior professional title, I have continuously strengthened my theoretical and business knowledge study, studied professional and technical knowledge, strengthened practical training, devoted myself to scientific and technological innovation and progress, and made great progress in my technical level and working ability. Since assuming the technical position of assistant engineer on xx, xxxx,
1.xxxx from xx to xxxxxx, I entered the electrical branch of Eleventh Metallurgical Construction Co., Ltd. and participated in the first-phase electrical project of XXXXXX Co., Ltd. and the first-phase alumina project of XXXXXX Co., Ltd., which is the largest aluminum industrial project with one-time investment and one-time construction scale in China. The scale of the project is 654.38+600,000 tons of alumina per year, with a total investment of about 9.086 billion yuan. Diligent in study, hands-on, thinking, to the construction site, humbly ask the electrical engineer and master, and carry out on-site construction according to the system diagram and plan in the drawings. In this way, I can quickly understand the electrical drawings and carry out construction according to them. Under the leadership of the project manager and the guidance of the electrical engineer, I have successively completed the electrical installation and debugging of 1# evaporation station, 1# evaporation raw material storage tank and water washing, 2# high pressure pump house, 4# dissolution, alumina packing pile, lime bin, lightning protection grounding system for lime digestion, power system, lighting system and power distribution system.
In terms of knowledge level and professional ability, from the beginning of my work, I found that the professional theoretical knowledge I learned at school was very different from the actual production. To this end, I always adhere to the method of combining theory with practice, strive to improve my work skills, actively absorb the work experience of the old masters, humbly ask them for technical problems in my work, and master rich practical experience through my own efforts. I know very little since I started as an electrician intern. From an ordinary electrician to the later electrician monitor, I participated in the company's large and small project construction, completed hundreds of electrical engineering installation, debugging, system startup and maintenance, and my personal hands-on ability and professional technical level have made great progress.
3.3. Since xx month of XXXXXX, I have joined XXXXXXXXX Engineering Construction Consulting Co., Ltd. as an electrical builder, mainly responsible for the installation of electrical engineering and the construction management of weak current engineering in the second phase of XXXXXXXXX construction. From getting the drawings to the joint review of drawings, I carefully check the details of each part, check the data and think about the construction steps. Be sure to have a picture in mind and organize the blue prints.the design. Coordinate and exchange views with the owner, designer and supervisor. Enter the project, carefully understand the construction details of each part, prepare the professional construction plan in strict accordance with the requirements of design drawings, prepare the work instructions for key points, and implement them after being confirmed by the supervision unit. At the same time, in the process of construction preparation, technical and safety disclosure shall be made to the team, so that the team can understand the construction content and strictly abide by the construction specifications. In the process of construction, do a good job in the "three inspections" of team self-inspection, re-inspection and full-time inspection, and at the same time do a good job in quality inspection and evaluation records, hidden records and related quality assurance materials. Strictly control the application of raw materials, semi-finished products and finished products in engineering. On the premise of ensuring the completion of construction, strictly control the construction quality, control the construction cost, speed up the construction progress and create excellent projects.
Xxxx years, doing maintenance and installation electrician in the company. At that time, the company's new factory was under construction. The company is a big consumer of electricity, which is supplied by two 10kv power grids. The power system is the driving force of the whole company, so the quality and reliability of power supply should be guaranteed. How to distribute the load reasonably and control the voltage change rate within the allowable range is the top priority of the power supply system. In the process of power supply system construction, I participated in practical work such as power generation system, power distribution system, ground network construction, lighting system, machine installation and debugging, which made me have a deep understanding of electric power, initially possessed the ability to organize, implement and finally complete the construction independently, and laid a solid foundation for power supply maintenance of the factory in the future.
Since my work, I have also actively participated in the electrical transformation of various equipment, as well as some non-standard electrical design work. In terms of technical management, we cooperated with the company's electrical engineers to organize and compile a number of engineering designs and technical schemes, participated in construction and commissioning, and made the work orderly. In the design, manufacture and construction of the copper mosquito-repellent incense production line independently developed by the company, I was mainly responsible for the installation and debugging of all electrical systems, and also put forward many positive technical suggestions during the design process of engineers. The project finally won the first prize of scientific and technological progress in xx in xxxx. In the transformation of the company's copper direct wire drawing machine, the electrical design was independently completed and implemented, and finally the automatic control of the production process was realized, which improved the production efficiency and reduced the labor intensity of workers and won the first prize of the company's scientific and technological progress of the year. In the company's rationalization construction, I put forward and implemented the rationalization proposal of "rational use of No.2 and No.3 continuous wire drawing machines 15kw motors", which helped the company save electricity, won the first prize of the company's annual rationalization proposal in xxxx, and also won the first prize of excellent rationalization proposal in the energy-saving and emission-reducing labor competition in xxxx. Through various technical transformation, I gradually became familiar with and mastered the application of various control technologies, such as frequency conversion technology, plc programming, man-machine interface technology, AC DC speed regulation, step-by-step servo system control, electromagnetic interference, and compiling debugging schemes. My comprehensive professional ability has been further improved.
Over the years, I have applied my professional knowledge to production practice in the first-line electrical technology work and achieved certain results; Through continuous accumulation and study, I have gained certain professional and technical ability. In my future work, I will be more strict with myself, study all kinds of professional and technical knowledge harder, improve my professional skills and comprehensive quality, give full play to my technical expertise in my work and make greater contributions to the enterprise and the country.
Annual Work Summary, Automation Engineer, 2022, with 5 articles collected (Part III). I graduated from the Automation Department of XX University of Technology in July, majoring in industrial electrical automation. 19XX worked in XX industrial equipment installation company from July to June. In the past ten years, I have been engaged in professional technical work and technical management, serving as the captain of the electrical debugging team and the head of the electrical department of the electrical instrument automation branch. In my work, I always adhere to the combination of theory and practice, actively go deep into the front line of engineering construction, adhere to the principle of modesty, sureness and diligence, accumulate rich practical experience, and obtain certain work achievements, which have been recognized by the employees, unit leaders and construction units. During this period, I completed the installation, debugging, system startup and operation of various industrial and civil projects through a number of national and ministerial key projects, and compiled a large number of construction organization designs, construction schemes and system trial operation schemes, which enabled me to have a comprehensive and systematic understanding of technical management and production management in the process of building installation. Years of hard work in the front line of construction have greatly expanded their professional and technical knowledge and improved their management ability in breadth and depth.
20xx In June, I was transferred from xx Industrial Equipment Installation Company to China XX International Economic and Technical Cooperation Company as a professional engineer, engaged in the bidding, design and construction management of foreign aid projects. Because of rich domestic construction experience, it is easier to master the management of construction technology in foreign aid projects. Through the comparison of construction at home and abroad, we can better grasp the key points and improve work efficiency. I also broadened my knowledge.
Looking back on five years' working experience as an engineer, after many exercises and practices in large and small projects, the professional technical level and professional technical management level have made great progress. Being able to host one party has won great economic and social benefits for the company.
After graduating from XX University of Technology, I was assigned to work in XX Industrial Equipment Installation Company. 1July, 1992 to1end of June, 1995, participated in the electrical debugging of the new project of the original XX factory, the installation project of the production line with an annual output of 750,000 tons of XX cement factory (provincial key project), and the installation project of boiler-turbine generator set of XXX thermal power plant of XX Mining Bureau (national key project). During this period, as a professional backbone, I participated in the debugging of various electrical equipment and the joint trial operation of the system. Including: power generation system, power distribution system, AC and DC speed regulation system, program control system, etc. From the compilation of debugging scheme, power transmission scheme and system startup scheme to the implementation of unit debugging and system debugging. This work has enhanced my systematic concept and ability to grasp the overall situation from beginning to end.
Electrical debugging is a high-tech job, a quality inspection from design, products to equipment installation, and a key step in the construction process.
In the new project of XX Cement Plant, most of the electrical equipment is imported from abroad, and the technology is at the international advanced level. We overcame the difficulties of incomplete data and no other experience to learn from, carefully studied the equipment performance, formulated a feasible debugging scheme and successfully implemented it. By Party A and foreign technical experts praise and affirmation. After the completion of this project, it won the XX Provincial Construction Project 1996 Fenshui Cup Quality Award.
The above is the first stage of my work experience after I joined the work. It was at this stage that I really had a profound perceptual knowledge of electrical installation and debugging engineering, and applied my professional knowledge to practice for the first time, realizing the first combination of theory and practice. It is also at this stage that I initially have the ability to organize and implement independently and finally complete the construction task.
5 Summaries of Automation Engineers' Work in 2022 (Part IV) 1. Practice purpose
Production practice is an important practical teaching link combining teaching with production practice. In the process of production practice, the school also aims to cultivate students' ability and methods to observe and solve problems and learn from production practice.
Cultivate our spirit of unity and cooperation, and firmly establish our sense of group, that is, individual wisdom can only play its role to the maximum extent if it is integrated into the group. Through this production practice, I learned the technical management knowledge of electrical equipment operation, the manufacturing technology knowledge of electrical equipment and practical knowledge that I couldn't learn in school.
In the process of learning from the workers, we have developed a fine style of hard work and plain living. In production practice, I realize that strict discipline and unified organization and coordination are the needs of modern mass production, and are also necessary for our contemporary college students, thus further improving our organizational concept.
Through production practice, it has played an important role in consolidating and deepening our theoretical knowledge, cultivating our ability to work independently and enhancing our labor viewpoint.
Second, the work content since entering the factory
Since I was admitted to the internship of X Telecom Equipment Manufacturing Company in June.
The main contents of the work are assembly, wiring, wiring and debugging. Assembly, wiring and wiring mainly involve xx high-resistance DC distribution panel, xx high-resistance DC distribution panel, xx AC distribution box, xx integrated rack, xx rack, etc. Debugging mainly includes static debugging and high voltage test of xx and xx series modules. The debugging process should be carried out in strict accordance with the manual of electrical debugging procedures, and problems should be found and solved step by step.
In addition, the welding of circuit boards, the production of wires, the assembly of modules, the installation of empty plugs, etc. are also done, mainly involving pressure plates, rectifier plates, control boards, temperature display circuit boards, crystal oscillator rising limits and so on.
Third, my understanding of technical work.
I think there is a sentence in the company's corporate culture that well summarizes all the contents of technical work-"Research, experiment, design, manufacture, installation, use and maintenance are seven major events, and technicians must go well all the way!" .
I think the "seven major events" mentioned here are all technical activities. Some people think that only the research and design of some high-tech things are truly technical activities, and despise installation, use and maintenance, thinking that the technical content is low or even no technical content.
This view is one-sided and wrong. From a philosophical point of view, it is an idealistic point of view.
Practice is the basis of theory, and theory is created by summing up in practice to guide practice.
Testing, manufacturing, installation, use and maintenance are our practical work. It's like a computer. In order to make it run normally, hardware and software are inseparable and indispensable. Hardware is the foundation of software, and software is the soul of hardware.
Undoubtedly, as a new employee who just left school, I still lack practical experience, and what I learned at school is more theoretical knowledge.
Therefore, it is my great honor that the superior leaders can give me this workshop internship opportunity, so that I can really understand the technical work in practice and make up for the shortcomings in practical experience.
Annual work summary, automation engineer 2022, 5 articles (5 articles) I graduated from university in 20xx, and am currently engaged in project management. As an assistant engineer, I have improved my knowledge accumulation, work experience, ability to analyze and solve problems under the guidance and care of leaders and the support and help of colleagues during my work. I will summarize my work since I took office as follows:
First, strengthen ideological and political construction.
Establish a correct world outlook, outlook on life and values, strive to improve the ability to apply theory to solve practical problems, and persist in seeking truth from facts.
Second, strengthen learning and improve their own quality.
What I have learned in my undergraduate course has little connection with my present job. In order to enhance my professional quality and improve my working ability, I specially bought books on engineering management, insisted on squeezing out some time to read books every day to enrich myself, constantly improved my learning methods and absorbed various nutrients extensively. Take the initiative to consult colleagues, apply what you have learned to practical work, check what you have learned in practice, find out the shortcomings and improve yourself; Because of the need of work, I went to the university to participate in the engineering cost training. Through training, I improved my reading ability of construction drawings, became familiar with quota and measurement rules, and provided a powerful source of knowledge for project management.
Third, be conscientious and do your job in a down-to-earth manner.
Collect and sort out all documents, materials and drawings of infrastructure projects in accordance with the regulations on the management of infrastructure archives, collect the distribution, recycling, borrowing and circulation of documents and materials of this department, complete the filing of infrastructure archives and documents of this department, send all materials to relevant personnel for scanning and uploading in time, and hand over the materials to the company's archives room in accordance with the regulations.
Input capital account, prepare and report all kinds of report documents. Fill in the Approval Form for Capital Construction Appropriation to the financial examination and approval system, the Detailed List of Funds to the company's finance department, the Appropriation Application Form and the Detailed List of Project Investment to the provincial company's planning department before 1 25th of each month, and do a good job in the connection of funds with superior units and departments to ensure the timely disbursement of funds as required.
Fill in the Construction Project Commencement Report Approval Form for the project to be started, and carry out the project construction after being approved by the engineering department of the provincial company. Report the progress of post-disaster reconstruction project of gas station every week, and report all project image progress to the engineering department of provincial company every month. There is no omission or delay in reporting, which is beneficial for the engineering department to grasp the progress of the company's engineering projects in time.
Four, the preparation of the project feasibility study report and investment estimate, to provide reference for leadership decision-making.
By engaging in project management, I am more and more familiar with project management. During this period of work, my personal working ability has been improved to a certain extent, which is inseparable from the concern of leaders and the help of colleagues around me. In the future work, I will continue to work hard, make persistent efforts, constantly adjust my way of thinking and working methods, participate more in the project construction site, hone myself in practice, exercise myself, work hard and strive for greater success.