Current location - Education and Training Encyclopedia - Education and training - Work summary of construction equipment engineer
Work summary of construction equipment engineer
At the end of a period of work, in order to better carry out the next period of work, we will summarize and reflect on the past work, so how to write the engineer's work summary? The following is a summary of the work of construction equipment engineers, which I compiled for you, for reference only, and I hope it will help you!

Work summary of construction equipment engineer (1) I worked as an equipment engineer in my current company in 20xx 10. With the strong support of the company leaders and the close cooperation of all departments, I have done a lot of work in equipment maintenance management, technical transformation and spare parts planning management, and achieved results. Summarized as follows. Please criticize and correct me.

First, do a good job in basic equipment management.

(1) Establish and improve the mechanical equipment account.

Due to various reasons, the company does not have a complete equipment account, and some data displayed in the financial account are also incomplete, which cannot correctly reflect the data that the equipment should have. To this end, this post and assistant engineer started from scratch, sinking into the site one by one, collecting original data one by one, and logging in for the record one by one from equipment specifications, models, manufacturers, production dates to wearing parts parameters. After more than a month's unremitting efforts, the company has established more than 200 sets of equipment files, which is of great guiding significance to the management of fixed assets, spare parts planning and maintenance.

(2) Establish equipment maintenance files.

Establish a maintenance and repair account for the main equipment in the production system, record the maintenance date and the consumption of materials (accessories), and estimate the next maintenance cycle. The establishment of maintenance files provides strong data support for planned maintenance and spare parts preparation.

(3) Formulate equipment operation regulations, guide and supervise post personnel to manage post equipment according to regulations, avoid equipment damage and accidents caused by illegal operation, and ensure the normal operation of equipment.

(4) Do a good job in daily inspection and planned inspection of equipment, find problems many times and notify or organize personnel to deal with them effectively.

Second, to the best of my knowledge, devote myself to the company's equipment maintenance and repair work.

In August, the company's ball mill entered the final installation stage, and personally made the lubrication system and safety guardrail, sacrificing holidays to contribute to the early trial operation of the unit. In September, great efforts were made to overcome the vibration and other defects of the unit. 10 found out the main reasons for the abnormal operation of the ball mill at the first time and made a repair plan, and quickly contacted the accessories and the construction unit to repair the ball mill in the shortest time. Track, guide and supervise the whole repair work, "grinding and scraping the bearing bush" to achieve perfection and ensure the repair quality and time limit. The complete elimination of the defects in the ball mill has broken the bottleneck of the company's main line production and laid a solid equipment foundation for improving the system quality and productivity. Responsible for the installation technical guidance of the secondary roller mill, accurately detect and monitor the key data, and scientifically handle some field problems to make the unit run smoothly and safely. In addition, we also participate in the daily maintenance of the company's production line for a long time, providing strong technical support and accessories services.

Third, actively participate in technological transformation and make due contributions to the company's quality improvement and consumption reduction.

Organized and implemented the desulfurization transformation of dust collector in gas station, the removal and installation of roller mill transition groove, participated in the transformation of steam powder tail gas recovery system and gas secondary spraying desulfurization transformation in Line 2, made full use of professional knowledge and practical experience, and completed the transformation task with the least investment. Facts have proved that these projects have achieved remarkable results.

Fourth, do a good job in spare parts planning and auditing.

Strengthen the monitoring of equipment status and wearing parts, reasonably prepare the monthly material and spare parts plan, and minimize the consumption of materials (spare parts) on the premise of ensuring the normal operation of equipment.

In addition, I am also responsible for the outsourcing maintenance of the company's equipment and the processing of accessories, and participate in the drafting of some contracts. I can take everything seriously and strive to be a qualified engineer who can reassure leaders and satisfy employees. Of course, due to the limited personal knowledge and working ability, as well as the constraints of various objective conditions, although we have done a lot of work in the past five months and achieved certain results, there is still a certain gap from the expectations of company leaders and employees. In the new year, I am determined to study hard, master higher skills, foster strengths and avoid weaknesses, and make greater contributions to the improvement of the company's economic benefits and the development and growth of enterprises.

Work summary of construction equipment engineer (2) Time flies, time flies, and in a blink of an eye, I have graduated from school for three years and worked in xxx for three years. In the three years of working in xxx, I have gained both sureness and joy, as well as regret and guilt caused by lack.

Xxx Company is a research and development enterprise which mainly produces transformer equipment. It is a well-known transformer equipment manufacturer in China and the largest electrical equipment manufacturer in Asia at present. The work of the production department is heavy and arduous, because it shoulders the task of assembly and on-site installation and debugging of all the equipment of the company. Under the guidance of workshop leaders and masters, I have better integrated into this tense and rigorous working atmosphere, successfully completed all the work arranged by the leaders, greatly improved my professional quality and working ability, and have more confidence in my work.

In the past three years, I have participated in the on-site installation and debugging of more products, equipment and equipment, from which I have benefited a lot. Not only have I learned a lot of professional knowledge, but also have a more comprehensive understanding and mastery of power equipment, and cultivated my basic qualities as a mechanical engineer. At the same time, study hard and insist on self-study to improve the theoretical level. The specific summary is as follows:

I am a college graduate who has just entered the society. I graduated from shaanxi polytechnic institute, majoring in mechanical design, manufacturing and automation engineering, and I am a new employee of xx. First, attend the company's training. Understand the basic situation of the company, understand the basic work and tasks of working in the company. As a new employee, I also actively participated in other trainings organized by the company and learned a lot of knowledge and ideas that I had never been exposed to before. After I officially joined the company, at first, I felt that everything was at a loss, although I was a mechanical major.

I only learned some theoretical knowledge at school, so there are few opportunities for practice. The workshop is a good place for me to study and practice. When I arrived at the workshop, I found that the theoretical knowledge I learned at school was too superficial and it was very difficult to work. At the construction site, I humbly ask the master, and I will ask if there is anything I don't understand. I seem to be busy with these equipment drawings. Only after I went to work did I know that I had little knowledge and had a lot to learn. Therefore, I humbly ask the master, ask more questions and look at more pictures. Based on my job, I'm afraid I won't ask if I don't learn.

During my internship, due to my diligence and good guidance from my master, I got a basic understanding of the company's equipment. During the probation period, my job is mainly to assist the master in assembly and get spare parts from the warehouse. At the same time, I also know something about spare parts, and I know its effect on the whole equipment during assembly. In the assembly work, we can only do some basic work, such as tapping and drilling. Although these tasks seem unremarkable, they are also the basic efforts to do an assembly work. Therefore, I am also very attentive to these small tasks. If I can't do it well, I have to be reworked by others, which is also a waste of other people's working time.

While working, I also found that my mechanical drawing ability is not very good. Combined with work needs and personal actual situation, I focused on learning the relevant knowledge of autocad drawing. The basic skills of mechanical drawing have been greatly improved. This has brought great help to my future work. Through this year's work practice, my mechanical knowledge and work have been greatly improved.

After two years of assembly work, I have accumulated some work experience in practice and learned something from my master. As the company produces equipment, the work of our production department is not only assembly, but more importantly, equipment debugging. Debugging experience is the most important. Commissioning of contact equipment from xx. Of course, at the beginning, I was debugging with the master. Debugging is to turn on the power supply after the equipment is assembled, check whether the transmission of all parts of the equipment is normal, and run idle, check and eliminate all abnormal conditions, complete the qualified appearance of the equipment, and provide better convenience for on-site installation and debugging.

Due to the accumulated working experience in the usual assembly work, I know the control components and operation of each part. So it is not difficult to learn, because many parts are externally processed, so there will inevitably be some problems. When debugging, if you are not careful, it will be difficult to find the problem, which part can't work normally, or there is no action, or the action is not flexible, so you will take many detours, fail to find the problem and can't deal with it in time. Usually learn slowly from the master, watch what they do, how to deal with every problem, and write down every problem carefully. When I debug independently, the same problem is easy to solve.

Three years have passed, and three years can change a lot, but the only thing that hasn't changed is the growth of my determination and working ability. I have been making progress, and these are all things I should do. I have grown from a rookie in a company to now, and there are many things to be solved, but I have been doing very well!

Summary of Construction Equipment Engineer's Work (3) In a blink of an eye, xx years have passed. With the guidance of the leaders of the Equipment Department and the help of relevant colleagues, I can barely complete the task in my current position. This period is more of a learning process. The relevant situation is briefly reported as follows:

Main work completion:

(1) warehouse spare parts associated query. Every week, I will go to the branch warehouse regularly with the professional spare parts management personnel of the equipment department for joint inspection of spare parts. The purpose of joint inspection of spare parts is to ensure that all spare parts are counted and well protected on site. Moreover, in recent days, I mainly cooperated with the engineers of the equipment department to do the preliminary coordination work of the material management system in the company's ERP system.

(2) During the joint inspection of equipment in the whole plant, it is mainly to conduct professional joint inspection of key equipment in the whole plant with equipment engineers to prevent equipment accidents and ensure the normal operation of equipment in the whole plant. The crown block is an indispensable equipment in the whole metallurgical system. Check the running status of the crown block together with the crown block engineer every month, and receive relevant joint inspection training of the crown block.

(3) Attend the regular maintenance meeting of the whole plant. During this period, you can be familiar with the main maintenance items in the maintenance process, and you can go to the site for inspection and understanding during the maintenance process to grasp the final maintenance effect and ensure that the production can run normally according to the maintenance plan.

(4) Participate in the accident analysis of some major equipment accidents, and understand the main causes of accidents through such meetings, which can effectively strengthen the spot check of the reasons in the spot check and effectively prevent the occurrence of similar accidents next time.

(5) During the equipment bidding meeting, I was mainly familiar with the whole process of equipment bidding, which was of great help to the future work.

I recommend it carefully.