Question 2: What does a budgeter do? Budgeter refers to the detailed or rough estimation and statistics of the most basic labor, materials, machinery and other expenses completed by a project, including taxes and profits.
The work of the budget officer includes:
Master design budget and construction budget management first, that is, secondary calculation management. Specifically, prepare and compare the second calculation, and increase or decrease the budget for the received design changes, technical approval documents and materials.
Second, contract control, planning, drafting and starting the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract.
Third, claim management. If the owner fails to perform or fails to perform the obligations stipulated in the contract correctly, causing losses to the construction party, the construction party shall claim compensation from the owner and draft the claim documents.
Fourth, the project settlement, according to the completion data of settlement book, determine the final cost of the project.
Question 3: What is the concept of a budgeter? First of all, we must look at the drawings and understand the structure, and then we must obtain the qualification certificate of cost engineer. It is impossible to set up a budget company, or rather a cost consulting company. Because the cost engineer is only a post certificate recognized by the local authorities, the consulting company should at least have the qualification of cost engineer.
Question 4: What department does the budget officer belong to? Most of them belong to the cost department, and some of them are used by the contract department of the budget department.
Question 5: What major does the engineering budgeter want to study? I have been budgeting for 2 1 year, and I can give you a reliable answer:
First of all, the personality is not suitable, so I won't elaborate. You'd better change it. In the construction industry, we should be open, be good at showing and expressing, learn more, talk more, ask more questions and practice martial arts. Details are more important.
Second, professional skills are not comprehensive enough. Fortunately, however, the budget is still a blank sheet of paper, which is very flexible. The best way is to go to the construction site to do technical work for several years, such as quality inspection, supervision, setting out and other positions. The key point is to understand the budget-related information such as construction technology, market subcontracting price and market material price, and the communication ability with all units (Party A and Party B, subcontractors, supervisors, quality inspection stations and laboratories). At the same time, seize the time (study, read through, research) budget quota, construction specifications, various atlas and other materials, as well as the application of budget software. Remember, the experts in the budget are all from practice, not from schools.
Novices should be sensitive to work and try, and try to accept mistakes. If they make mistakes, they can correct them. Don't be shy. Being a budgeter is a process of building personality and reputation. Don't be greedy, don't be bad, be honest.
Budget officer belongs to the specialty of "project cost management" in construction economy.
College degree > After working for 3 years, you need to take the "Budgeting Officer" certificate, which needs to be taken once a year and upgraded every few years. It is divided into one, two and three levels, with the first level being the highest.
After obtaining the certificate of budget officer (level 3), you can take the national registered "engineering cost engineer" certificate for three years, but you need an intermediate certificate of information "engineer certificate" in the middle.
Key reminder:
At present, college students have a deviation in the concept of budget officer, as if this job is quite light. Actually, it is not. It is easy to do this job, but it is not easy to do it well. You should be able to endure hardships, keep learning, and more importantly, have a strong sense of responsibility. Once you do it, you can never go back. So listen to the advice of the old budget officer. Well done, it will not be a career in a few years, but a career. This circle is not big. You will be famous and earn a considerable income, and you will not change for a small business. On the contrary, your reputation will stink, even if you change careers. So think about it.
Being a budgeter is a process of building personality and reputation. Don't be greedy for money, be honest.
Question 6: What kind of occupation is a budgeter? Job content The specific job content of the construction project budgeter is as follows: First, master the design budget and construction budget management, that is, secondary calculation management. Specifically, prepare and compare the second calculation, and increase or decrease the budget for the received design changes, technical approval documents and materials. Second, contract control, planning, drafting and starting the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract. Third, claim management. If the owner fails to perform or fails to correctly perform the obligations stipulated in the contract, resulting in losses to the construction party, the construction party shall demand compensation from the owner and draft the claim documents. Fourth, the project settlement, according to the completion data of settlement book, determine the final cost of the project. At present, the salary of budget personnel is about 2500~4000 yuan per month, including civil budget personnel and installation budget personnel, but it has been renamed as cost personnel. The five members of the building are: the builder, the quality inspector, the safety officer, the materials officer and the information officer. There is no cost member among these five members, and the cost member belongs to one of the eight members of the building. Compared with five members, the budget officer's salary is higher. To edit this section, the qualification budgeter needs to pass the training and examination, and then issue the post certificate. The certificate is numbered and stamped with its own seal. The content of the certificate number is the name and certificate number. The certificate of budget officer is also called the certificate of cost engineer. At present, China implements the national qualification examination system for construction engineering cost engineers, and registered cost engineers have a national examination every year. The application conditions are above, but the annual pass rate is very low. Not based on scores, but on all examiners of that year. Budget officer is a good job. First of all, for us personally, it is not like a construction worker or a quality inspector running around the construction site all day. Besides, it has a high gold content. If you don't want to work in the original unit, you can change to another unit, which is also very easy to find a job. This may be the reason why I chose to be a budgeter. Edit this paragraph 1 budget officer's job responsibilities, be familiar with national laws and regulations and engineering cost management regulations, master professional theoretical knowledge, be familiar with engineering drawings, master engineering budget quota and relevant policies and regulations, and lay a foundation for correctly compiling and auditing budgets. 2, responsible for the audit of construction drawings, to participate in the blue prints.the design and technical disclosure, according to its records for budget adjustment. 3. Assist leaders in project declaration, organize bidding, examination and approval before commencement and acceptance after completion. 4. After the project is completed and accepted, the final accounts shall be made in time and reported to the factory director for signature. 5. Participate in the procurement of engineering materials and equipment, be responsible for the analysis of engineering materials, check the price difference of materials, collect and master the records of technical changes and material substitution, conduct cost accounting at any time, and provide scientific basis for leadership decision-making. 6, a comprehensive grasp of the terms of the construction contract, in-depth understanding of the construction situation, to lay a good foundation for the final accounts review. 7. After the project is completed, it should be sent to the audit department for audit. 8. Complete the economic analysis of the project cost, and timely file the final accounts of the project. 9, assist in the preparation of infrastructure plans and adjustment plans, understand the implementation of infrastructure plans.
Question 7: What does a budgeter do? This is a lot to say. In the field of construction engineering, the budgeter mainly has four responsibilities: first, master the management of design budget and construction budget; Second, contract control; Third, claim management; Fourth, project settlement. These four responsibilities indicate the general requirements for enterprises to recruit budget officers: college degree or above, major in civil engineering and related fields, holding a budget officer's employment certificate, having basic knowledge of engineering construction, being familiar with various building materials and technologies, being familiar with engineering quantity calculation rules, and being familiar with various related software operations. The budget officer needs to be very familiar with the market situation and the actual construction process, so he emphasizes work experience more than other positions. Of course, there are still some big companies that dare to try to use new people and then find a master to teach them. Specifically, you can go to Hubei Entrepreneurship Technology Training School to find out. This is their website. In the field of construction engineering, the main responsibilities of the budgeter are: 1. Mastering the management of design budget and construction budget; Second, contract control; Third, claim management; Fourth, project settlement. These four responsibilities indicate the general requirements for enterprises to recruit budget officers: college degree or above, major in civil engineering and related fields, holding a budget officer's employment certificate, having basic knowledge of engineering construction, being familiar with various building materials and technologies, being familiar with engineering quantity calculation rules, and being familiar with various related software operations. The budget officer needs to be very familiar with the market situation and the actual construction process, so he emphasizes work experience more than other positions. Of course, there are still some big companies that dare to try to use new people and then find a master to teach them. If you want to take the exam, this is their website. It's good to choose him for training. You can have a look.
Question 8: What is a budgeter? The introduction of budget officer refers to the detailed or rough statistics of the most basic labor, materials, machinery and other expenses completed by a project, including taxes and profits. The definition I said is not a written definition.
Question 9: What does the budget officer mean by three years' initial trial? You need to receive continuing education every three years, otherwise it will be invalid. To put it bluntly, if you pay some money, he will give you a book to finish online learning. As long as you have listened to enough classes online and have no exams, you will be done. Then print the certificate of completion and get it to the designated place. He will give you a new seal, and everything will be fine! It may be that the cost department is short of funds, and the majority of cost members collect some money, which is totally * * *.
Question 10: What are the requirements for the project budgeter? Skill requirements
Such an important position requires the following basic qualities and skills:
1, college degree or above, graduated from civil engineering or related major and holds the employment certificate of budget officer;
2. Have basic knowledge of architectural drawings, architectural structures and architectural structures;
3, understand the construction technology, general construction methods, engineering quality standards and safety technical knowledge;
4, understand the commonly used building materials, components, products and commonly used mechanical equipment;
5, familiar with the quota, understand the composition of labor cost, material budget price and mechanical machine-shift fee charging standard;
6. Be familiar with the calculation rules of quantities and master the calculation skills;
7, understand the construction economic laws and regulations, familiar with the terms of the project contract, can participate in bidding, bidding and contract negotiations;
8. Have a basic knowledge of computer application, and be able to use computers to prepare construction budget.