Responsibilities of the person in charge of construction technology
Job responsibilities of construction technical director (5 general rules)

Nowadays, various job responsibilities appear frequently, and job responsibilities are a specific job description, which can be divided into different job types. So is it really difficult to formulate job responsibilities? The following are the job responsibilities (5 in total) of the person in charge of construction technology that I have compiled for you. Welcome to read the collection.

Responsibilities of the person in charge of construction technology. Under the unified leadership of the project manager, according to the division of labor, work hard, implement the relevant management system of the company and the project department, and take the main responsibility for the construction technical scheme, site safety and construction quality.

2. Obey the leadership, management and command of the project manager, be responsible for the technical management of the project construction, formulate the construction technical scheme and safety technical operation specification, guide and instruct the production operation of the team, and ensure that the project is organized and implemented according to the design drawings, engineering contracts and technical standards.

3. Organize the blue prints.the design, participate in the preparation of construction organization design, and organize technical personnel to locate and set out, check lines, measure elevations and recheck operation level benchmarks according to drawings.

4. Conduct pre-job training and education for workers entering the site, and hold relevant certificates for special types of work. Party A's safety technology and construction technical disclosure scheme shall be implemented in all construction teams, and the implementation shall be checked at the same time.

5. Check the geometric dimensions and floor elevation of team drawings, correctly calculate the quantities of subcontracted projects, solve engineering technical problems, be responsible for the change visa of engineering contract quantities, and make daily construction logs.

6, to assist the project manager, pays special attention to the quality and technical management of the construction site, in accordance with the design specifications, drawings and contract requirements, completes the construction quality inspection, inspection, concealed engineering detection and acceptance, and participate in the construction technology review, construction survey management, construction meeting and quality inspection and control.

7. Cooperate with the construction foreman to prepare the construction progress plan and participate in the control of the project construction progress, including: construction organization, technical measures, quality control, technical scheme, etc.

8. Cooperate with the project department manager to control and manage the construction cost, be responsible for preparing the cost budget plan and cost analysis, determine the engineering change price and cost claim, and be responsible for preparing the bill of quantities and pricing.

9. Cooperate with the construction foreman to prepare the material plan and participate in the material management, inspection and acceptance of the construction site; Participate in cost accounting, cost analysis, contract review and environmental inspection of pre-connected projects to minimize risks in the project implementation stage.

10, participate in the inspection of project quality, construction progress, site safety and material usage organized by the project department, timely issue rectification notice for the quality and technical problems found, clarify the responsible person, make rectification and review within a time limit, and rationally use reward and punishment measures.

1 1. Make a comprehensive evaluation of the work of the technicians involved in the construction project, feed back the opinions and suggestions of the technicians to the company, and do a good job of communication and docking with the technical department of the company.

12. Be responsible for the technical data management of the project department, participate in the technical training of the company, regularly organize the management and technical personnel of the project department to learn new processes and specifications, and optimize the technical strength of the project.

Responsibilities of the construction technical director 2 As the technical director of the construction site, I think we should do the following work well:

1, preparation of construction technical scheme. Pay attention to pertinence, put the scheme first, and guide the construction only after the scheme is submitted for approval;

2. Technical disclosure of construction scheme. Technical disclosure should be comprehensive, signed and not a mere formality. This is very important;

3. Communication and coordination with design institutes, supervision units and construction units (mainly involving design changes and technologies, of course) can well reflect the ability level of a technical director. If you want to get promoted, this is very important!

4. Communicate with the contract budget department in time, and do the corresponding visa work in time for the contents involving design changes;

5. Engineering technical data management. Mainly control the inspection of raw materials, finished products and semi-finished products to meet the requirements of specifications and local quality inspection departments, because this part of information and other project completion information can not be supplemented at the final finishing, and of course, the location and time of the information of each process should also be closed;

6. Overview of new materials, new processes and new technologies. After each project is completed, this is what the technical director will do or organize. Only by summarizing can we improve things and promote the technological progress of enterprises.

Responsibilities of the person in charge of construction technology. First of all, be responsible for the technology and quality management of this project, and be fully responsible for the engineering technology and quality.

Second, the current national building laws, regulations, codes, mandatory codes and standards shall be strictly implemented during the construction, and the construction shall be carried out in strict accordance with the drawings.

Three, the preparation of construction organization design and general layout, formulate effective quality and safety technical measures and special programs.

Four, according to the annual and monthly overall progress goals issued by the company, responsible for the preparation of detailed monthly and weekly progress plan of the project.

Fifth, organize the self-examination and joint examination of engineering drawings to solve various technical problems in construction in time.

Six, responsible for the technical disclosure work, organize technical personnel and workers to learn to implement technical regulations, specifications and quality standards, and check the implementation at any time.

Seventh, responsible for the visa of technical documents and data for the construction of this project.

Article 8 Supervise and inspect the construction quality of operation teams and construction personnel, ensure that the project is constructed according to design drawings and specifications, and be responsible for organizing quality inspection and evaluation.

Nine, presided over the project quality meeting, put forward rectification measures for quality problems and supervise the timely handling.

Tenth check the safety technical disclosure, participate in safety education and safety technical training, participate in the investigation and analysis of safety accidents, and put forward technical appraisal opinions and improvement measures.

Eleventh responsible for the inspection and supervision of the collection and collation of project archives, organize the drafting of project construction summary.

Twelfth do a good job with the design unit and the relevant engineering and technical personnel to avoid losses caused by technical mistakes in the construction process.

Article 13 Assess the work of the technical personnel of this project, and put forward rewards and punishments according to the performance of the technical personnel, and advise those who are incompetent to return to the company.

Fourteenth do a good job in unity, cooperation and cooperation, and complete other tasks assigned by the leadership.

Responsibilities of construction technical director 4 1. Carry out the national technical policies, norms and standards, and be responsible for the technical management of this project under the leadership of the project manager.

2, the host unit engineering design disclosure, the blue prints.the design; Preside over the preparation of construction organization design, construction scheme and operation design, preside over (or participate with the quality director) the preparation of the quality plan of this project, and be responsible for technical disclosure to the project management personnel.

3, presided over the formulation of safety technical measures, to guide the project management personnel to carry out the construction organization design.

4. Go deep into the construction site, find and solve various problems existing in the construction in time, and preside over the measurement, test and measurement of the management project.

5. Guide and supervise the technical, quality and safety inspection of each construction team, organize concealed engineering acceptance and partial engineering acceptance, and participate in unit engineering quality evaluation.

6, responsible for the management of engineering technical data, engineering information, presided over the completion of the file sorting and filing.

7. Handling project design changes, technical verification and on-site visa claims.

8. Supervise and report the statements of all departments of the company.

9. Participate in the project budget and settlement.

10. Accept the rationalization proposal, popularize the "four new" technologies, carry out technological innovation, and complete the technical benefit plan of the project.

1 1. Be responsible for all kinds of training work of the project and cultivate compound talents.

12. Complete other tasks assigned by the project manager.

Responsibilities of the person in charge of construction technology. Responsible for implementing the national construction acceptance specifications and quality acceptance standards, and organizing the implementation of the project quality management system.

Second, for the project quality manager. He is the organizer and commander of engineering technology and quality management, and is in charge of the work of technical and quality departments.

Three, organize engineering and technical personnel familiar with drawings and organize the blue prints.the design.

Four, organize the preparation of project construction organization design, construction technical scheme, responsible for reviewing and approving all kinds of construction technical schemes within the scope of authorization.

Five, responsible for the preparation of quality, environment, occupational health and safety documents, safety technical measures, construction work instructions.

Six, responsible for project measurement, test, engineering and technical file management.

Seven, responsible for the demonstration of science and technology, leading the Yanta Cup to achieve quality goals.

Eight, organize major quality accidents and participate in the investigation, analysis and handling of major safety accidents.

Nine, organize the intermediate acceptance, structure and completion acceptance of the project and project filing.

Ten, responsible for technical visas, coordinate the accounting department to do a good job of economic visas.

Eleven, to carry out new technology promotion work, in view of the new technology, new technology, new products and new materials involved in the project to prepare special construction technical scheme.

;