Current location - Education and Training Encyclopedia - Education and training - Summary of personal work of electric power assistant engineer
Summary of personal work of electric power assistant engineer
Chapter 1: Overview of professional and technical work of reporting assistant engineers.

Guodian XXX company yunxing department

I graduated from the Department of Automation, School of Electrical Information Engineering, XXX University in July, 20 15, and joined Guodian XXX Power Plant of Guodian XXX Power Generation Co., Ltd. in July of the same year ... Since I entered the factory, I have been working in the centralized control operation position of the operation department. Since my work, I have participated in the three-level safety education from the factory, the training and study of centralized control comprehensive specialty in the operation department, and the training of computer simulator. , participated in the normal operation and maintenance of the unit and participated in the annual major and minor repairs of the unit. In this process, I learned a lot of knowledge and experience, and made great gains and progress in all aspects. I gradually changed from a student at school to a qualified employee of a state-owned enterprise, and I have a deep understanding of my work. The professional and technical situation in the past two years is now reported as follows:

I. Safety in production

Power enterprises always adhere to the policy of "safety first, prevention first and comprehensive management", and strictly control and prevent accidents to ensure personal and equipment safety is the primary work of power departments. In the process of operating and maintaining equipment with my master for many times, I strictly implemented the electric power safety work regulations, carefully analyzed various difficulties in safety work, and formulated conscious, targeted and focused safety measures according to the characteristics of each task. In addition, we should seriously study the safety study organized by teams and groups, carefully understand, seriously discuss and analyze the safety accident cases inside and outside the factory over the years, learn from them and prevent the occurrence of safety accidents.

Second, study and work.

1, improve the basic theory

In school, we learn more theoretical knowledge, but less about objects and examples. The integration of theory with practice is not enough, and the theory is divorced from practice, which is not conducive to in-depth research. The so-called behind closed doors, without the guidance of practice, the theory will not be greatly improved. Came to Guodian

After XXX power plant, the theoretical knowledge during the school period was guided in kind, which made the original vague concept clear. Outstanding performance in the power electrical system, boiler operation system, steam turbine generator set, excitation system, speed control system and other structures have a greater perceptual knowledge.

2. Improve professional skills

During the operation of the unit, I followed the team leader to learn how to patrol the equipment, master the precautions in the patrol process and the use of operating instruments. Under the leadership of the masters, I slowly began to learn disk monitoring and some simple operations, the objects to be monitored in the process of disk monitoring, the normal running state of the equipment and how to dynamically judge and deal with the unit failure according to the parameters. During the duty, the masters should ask me questions and give careful guidance so as to learn a simple operation every six hours. At the same time, do a good job in accident prediction during the on-duty period, grasp the current situation of the whole plant equipment, and strengthen the monitoring of defective equipment.

During the maintenance of the unit, accompany the master to do the safety measures for the unit maintenance and learn how to restore the safety measures after the maintenance work. These tasks need to be taken seriously and carefully checked to ensure the safe and stable operation of the unit. I have participated in the start-up and shutdown operation of the unit for many times, and have a certain understanding of the process of start-up, the machinery, electricity and furnace systems that need to be inspected and operated, and the matters needing attention in the operation process.

Under the guidance of my master, I further studied and mastered the electrical secondary diagram and relay protection principle, thoroughly studied the basic working principles of excitation system and speed regulation system of turbogenerator, and became familiar with the working principles and operating characteristics of circulating fluidized bed boiler. During the maintenance of the unit, I also learned the instrument knowledge from the master, and mastered the working principle and calibration method of measuring elements such as power transmitter, frequency transmitter, pressure gauge and digital display meter. And I have mastered the arrangement and basic operating values of electric and non-electric measuring points of two units in our factory, and at the same time mastered the use methods of some equipment. In thermal instrumentation, understand the working principle and function of various sensors.

During my work, I also accompanied the master to use the unit downtime to carry out various actual combat simulation operations. At work, the master often asks me to be the person in charge of the work, think about problems by myself, know how to deal with them in the face, arouse my enthusiasm for solving them alone, and give me a lot of room for thinking. Through the teacher's indoctrination, I mastered the basic principles of accident handling. .

Third, the management work

Since I entered the factory, the team has allowed me to grow, make progress and improve. On February 20 12, he was elected as the team leader and labor protection inspection supervisor, and participated in team construction and team safety management. In the process of my own participation in team construction and safety management, with the joint efforts of all team members, the team has successively won the honorary titles of "National ankang cup" labor competition winner, "Top Ten Team" of Guodian XXX Power Generation Co., Ltd., "Learning Team" of Guodian XXX Power Generation Co., Ltd. and "One Strong and Three Guarantees", which made me fully and meticulously realize the importance of combining professional and technical production with management.

Fourth, the existing shortcomings and the direction of future efforts.

1. The theoretical understanding of the production process of thermal power plants is not deep enough. The integrated operation of centralized control requires a wide range of knowledge for employees, including electrical knowledge, thermal knowledge and basic chemical knowledge, but the professional knowledge is not deep enough. In the future, we should continue to strengthen the study of professional knowledge, strive to achieve the requirements of "one specialty and many functions" as soon as possible, improve the comprehensive ability and adapt to the development of power plants.

2. In the usual work, although I participated in a lot of specific work, in view of the different division of labor during the operation of the unit, my understanding of the whole system is still at the theoretical level, and my study of the system is still scattered, lacking a clear understanding of the whole, so I can't be independently responsible for important and complicated equipment.

Fault diagnosis and handling tasks. The improvement of this ability is also the main task of my future work and study.

3. Not paying enough attention to social science and technology information and not knowing much. We should learn as much as possible about the information of the same industry through multiple channels to keep up with the technological update speed of the power industry today. Provide me with as many methods and technical support as possible to solve the current problems.

4. "Learn from the past, learn from the past", insist on communicating with colleagues and teachers at work, learn from their work experience, speed up their learning pace and improve their ability.

5. I don't know much about basic management, and I haven't been able to do a comprehensive and meticulous self-management. In order to improve the ability of combining production with management, I should strengthen the study of company management system and procedures in the future.

In short, with the care of teachers and leaders and the help of colleagues, I have made great progress through my own efforts, but there are still many problems and shortcomings. In the future work and study, I will continue to strengthen the study of professional knowledge and improve my quality and working ability; In the process from theory to practice, we should treat it with meticulous attitude, be down-to-earth and refuse to understand; Listen to the teacher's teachings with an open mind, actively absorb his rich practical experience, find and summarize personal problems in time, and correct them immediately; Diligence, correct attitude, being "strict, efficient, fair and harmonious" ideologically, being strict with myself, devoting myself wholeheartedly to future study and work with full enthusiasm, and striving to be an excellent electric worker.

Chapter 2: Summary of technical application of electric assistant engineers.

Summary of technical declaration of electric power assistant engineer

I graduated from Wuhan Electric Power School in September 2002 and was assigned to work in Huangshi Power Supply Company, Hubei Electric Power Company. Has been engaged in the maintenance, design, construction and management of distribution lines and equipment in the installation class of production and operation department of Tieshan Power Supply Company. In order to master more professional knowledge and correspond to my professional work, I applied for correspondence study in Wuhan University in September, 20001year, and applied for the professional qualification of assistant engineer, and I passed the study and got approval within the specified time. Report the work summary during the current professional qualification period to the superior leaders and experts, and apply for evaluating the professional and technical qualifications of engineers.

First, professional study.

In 20041February, the qualification of assistant engineer was approved, and I continued to study by correspondence in Wuhan University, and obtained the graduation certificate in July 2004. In July 2003, the national rural power grid transformation was officially launched. I was transferred by the leadership team of Huangshi Power Supply Company to participate in the design of distribution network. At this time, I have been working for four years and I am familiar with the original distribution network. Whether I can complete the tasks assigned by my superiors in the next few months according to the standards of urban power grid transformation is a test of my professional knowledge. During this period, on the one hand, I gave up my rest time for professional study and let myself "strengthen training" in a targeted manner;

On the other hand, you should ask the experts more questions, think hard, do more, study hard and remember. I learned the drawing and checking calculation of tower foundation in a short time, and mastered the technical performance and reasonable application of new products and equipment, as well as the positioning, measuring and drawing methods of line theodolite. From barely completing a line design task in the first week to being able to complete a complete line design work independently in the next three days, I have increased my work confidence. Second, professional work

During my current professional qualification work, I experienced the second and third phase transformation of rural power grid in 2003-2004, as well as the design and construction technology management of separation of production and living electricity in large and medium-sized enterprises such as WISCO Daye Iron Mine, Daye Nonferrous Metals Company and Daye Iron and Steel Plant Donggang Company. Complete the design of distribution lines for urban network transformation, manage the construction of kilometers of medium-voltage distribution lines, public transformer distribution lines and kilometers of low-voltage lines, and transform the electricity consumption of many urban residents; Design of distribution lines in the second and third phases of rural power network transformation, management of medium-voltage distribution lines in construction kilometers, distribution of public transformers in Taiwan Province, low-voltage lines in kilometers, and transformation of electricity consumption for many rural residents;

Large and medium-sized enterprises have changed from power supply to direct supply to design and transform distribution lines, manage the construction of km medium-voltage distribution lines, distribute public transformers and km low-voltage lines, and transform the power consumption of employees in multi-family enterprises. In project management, in order to adapt to the development of market economy, we actively carry out the company's project target management responsibility system, determine the key and difficult points of work every year, clarify the tasks and make reasonable arrangements, so that we can gradually develop from a professional and technical personnel to a management-oriented employee.

Grasp management, seek benefits from management, draw up goals and develop steadily towards them. In recent years, we have seriously studied the cost budget management, comprehensively analyzed and controlled the expenses, established the internal market management mode, and formulated a series of detailed rules for examination and implementation, so as to realize the concepts of project quality standardization, modernization of management mode, scientific learning method and maximization of project benefits. Third, the future work ideas

Summing up my past work, I have many shortcomings and deficiencies in business knowledge, management methods, problem solving, professional knowledge and business ability. I carefully analyze myself from the following aspects, sum up myself, reflect on myself, persevere and work with an open mind. 1. Strengthen the study of business knowledge, continue to participate in correspondence study, and expand the scope of knowledge to declare senior professional and technical positions.

Be prepared and lay a solid foundation; 4. Improve management ability, study management knowledge hard, learn advanced management experience, and improve your management art ability in combination with yourself; 3. Work regardless of gains and losses, be honest and self-disciplined, and strive to be an excellent electric worker and an excellent party member.