Piling can only be carried out after professional training, and only relevant post qualification certificates are needed. If there is no training or post qualification certificate, piling construction cannot be carried out.
In the process of piling, we can use many tools to operate. We can use the hammer method, that is, prepare a pile hammer and then carry out construction on the subbase. The premise is to reserve a depth to be driven, and pile according to the specified depth, so that there will be no mistakes in the construction process.
There is also a vibration method. In the process of piling, you can install it on the top of the pile with a big strategy driver, and then continue to vibrate to reduce the resistance under the foundation, so as to achieve the effect of piling.