Current location - Education and Training Encyclopedia - Education and training - Curtain wall design and construction process
Curtain wall design and construction process
It can roughly describe the whole process of curtain wall design and construction;

Curtain wall designers should make three key drawings. Before drawing, they usually start to draw the following three drawings according to the civil engineering drawings provided by the owner. If there is no such drawing, they will have to measure it themselves and come back and do it on this preliminary drawing themselves. If you have this drawing, you can leave it alone first, and then see if there are any drawings of curtain walls or drawings that need to be deepened. If not, you need to draw it. The main drawings are plane elevation, details and node drawings.

These three diagrams are nested with each other, and you can understand them as a navigation bar, an inner page and a detailed diagram of a web page. Panels and keels, to be precise, sometimes reflect, but not necessarily. Because many things are very routine, everyone has a bottom, especially those who have seen many drawings and drawn many drawings.

a painting

Most of the construction will be based on drawings, and only a few will need to be adjusted according to the actual situation on site. Construction can use their own professional team or find qualified people in the local area. A construction process can be roughly divided into: drawings, procurement, transportation and installation.