Section 1 Basic knowledge of capital construction
First, the concept of capital construction
Second, the composition of capital construction
III. Division of Capital Construction Projects
Four. Classification of capital construction
Verb (abbreviation of verb) capital construction program
The composition of the project cost in the second quarter
I. Composition of investment in construction projects
Second, the composition and calculation of the project cost.
Section 3 Project Cost Valuation Procedure
A, quantity unit price method valuation program
Second, the comprehensive unit price method valuation procedures
Chapter II Reading Construction Drawings of Installation Projects
The first section installation engineering construction drawing reading basis
First, the drawing format.
Second, the title bar and countersign bar.
Third, the map line.
Fourth, the proportion.
Verb (abbreviation for verb) altitude
Size of intransitive verbs
Section 2 Reading of Construction Drawings of Electrical Equipment Installation Project
A, commonly used graphic symbols
Second, the composition and content of the electrical construction drawing
Three, the general method of electrical engineering construction drawing reading
Four, power distribution engineering construction drawing reading
Five, power engineering construction drawing reading
Six, electric lighting engineering construction drawing reading
The third quarter water supply and drainage, heating engineering construction drawing reading
A, water supply and drainage engineering construction drawing expression content
Second, the classification of water supply and drainage engineering construction drawing
Three, water supply and drainage engineering construction drawing annotation
Four, water supply and drainage engineering construction drawing reading method
Five, water supply and drainage engineering construction drawing commonly used legend
Six, heating engineering construction drawing content
Seven, indoor heating engineering construction drawing reading method
The fourth quarter ventilation and air conditioning engineering construction drawing reading
A, ventilation and air conditioning engineering construction drawing composition
Second, the ventilation and air conditioning engineering construction drawing commonly used legend
Three, ventilation and air conditioning engineering construction drawing reading method
The fifth section building intelligent system equipment installation engineering construction drawing commonly used legend
A, integrated wiring system engineering commonly used legend
Second, the communication system equipment installation project commonly used legend
Chapter III Valuation System of Bill of Quantities
Section 1 Overview of Bill of Quantities
First, the concept of bill of quantities
Second, the content of the bill of quantities
Third, the characteristics of the bill of quantities
Section 2 Brief Introduction of Construction Engineering Bill of Quantities Valuation Specification
First, the concept and content of "list pricing specification"
Second, the purpose and significance of compiling the "List Valuation Specification"
Composition and calculation of bill of quantities valuation in the third quarter
A, partial project cost
Second, the measures project fee
Third, other project fees
Four. expense
Verb (abbreviation for verb) tax
The fourth chapter installation project list project quantity calculation
The first section electrical equipment installation project
I. Transformer installation (code: 03020 1)
Two. Installation of power distribution equipment (code: 030202)
Three. Bus installation (code: 030203)
Four. Installation of control equipment and low-voltage electrical appliances (code: 030204)
V battery installation (code: 030205)
Intransitive verb Check motor wiring and debugging (code: 030206)
Seven. Installation of contact wire device (code: 030207)
Eight, cable installation (code: 030208)
Nine, lightning protection and grounding device (code: 030209)
X. 10kV overhead distribution line (code: 0302 10)
XI。 Electrical adjustment test (code: 0302 1 1)
Twelve. Pipes and lines (code: 0302 12)
Thirteen. Lighting fixture installation (code: 0302 13)
Section 2 Water Supply and Drainage, Heating and Gas Engineering
I. Water supply and drainage and heating pipelines (code: 03080 1)
Two. Fabrication and Installation of Pipe Support (Code: 030802)
Three. Pipeline Accessories (Code: 030803)
Four. Manufacture and installation of sanitary ware (code: 030804)
Verb (abbreviation of verb) heating equipment (code: 030805)
Six, gas appliances (code 030806)
Seven, heating engineering system adjustment (code: 030807)
Section 3 Ventilation and Air Conditioning Engineering
1. Manufacturing and installation of ventilation and air conditioning equipment and components (code: 03090 1)
Two. Manufacture and installation of ventilation pipes (code: 030902)
Three. Manufacture and installation of ventilation duct parts (code: 030903)
The fourth quarter building intelligent system equipment installation project
I. Communication system equipment (code: 03 120 1)
Second, the computer network system equipment installation project (code: 03 1202)
3. Multi-meter remote transmission system for buildings and residences (code: 03 1203)
Four. Automatic control system for buildings and communities (code: 03 1204)
Verb (abbreviation of verb) Cable TV system (code: 03 1205)
Intransitive verb amplification and background music system (code: 03 1206)
VII. Parking lot management system (code: 03 1207)
Eight. Building safety system (code: 03 1208)
Chapter v bill of quantities of installation project and its valuation.
Section 1 bill of quantities for installation works.
A, the basis for the preparation of the bill of quantities
Second, the preparation procedure of bill of quantities
Third, the preparation scope of the bill of quantities
Four, the general description of the bill of quantities
V. Compilation of Partial Bill of Quantities
Sixth, prepare a list of measures.
Seven, the preparation of other projects list
Eight, the preparation of fees and taxes list.
In the second quarter, the installation project bill of quantities valuation
First, the purpose and significance of carrying out the bill of quantities valuation
Second, the influencing factors of bill of quantities valuation
Third, the bill of quantities valuation method
In the third quarter, an example of compiling bill of quantities for electrical equipment installation project
The fourth quarter electrical equipment installation engineering bill of quantities valuation example.
Chapter VI Installation Project Quota and Quota Valuation
Section 1 Overview of Installation Engineering Quota
First, the concept of quota.
Second, the characteristics of the quota
Third, the classification of quota.
In the second quarter, the project unit price and unit valuation table
A, the project unit price
Second, the unit valuation table
In the third quarter, the installation of artificial, mechanical affecting, the determination of material consumption quota
A, the determination of the installation engineering labor quota consumption
Second, the installation of construction machinery affecting the determination of the quota consumption
Third, the determination of material consumption quota for installation engineering
The fourth quarter installation engineering labor, materials, machinery affecting the determination of the unit price
A, installation engineering labor price.
Second, the determination of the unit price of installation engineering materials
Three, the installation engineering construction machinery affecting the determination of unit price
Section 5 Calculation of Quantities for Quota Valuation of Installation Project
A, electrical equipment installation project
Second, water supply and drainage, heating and gas engineering
Three, ventilation and air conditioning engineering
Four, building intelligent system equipment installation project
Five, brush oil, anti-corrosion, heat preservation project
Repair project of intransitive verbs
Chapter VII Audit and Management of Installation Project Cost
The first section of the installation engineering design budget preparation and review
I. Contents and Functions of Design Budget
Second, the preparation method of installation engineering design budget estimate
Third, the installation project design budget review
Section 2 Compilation and Audit of Construction Drawing Budget for Installation Project
I. Overview of Construction Drawing Budget
Second, the installation project construction drawing budget preparation
Third, the installation project construction drawing budget review
Section 3 Project Settlement and Final Accounts for Completion
I. Project Settlement
Second, the project completion accounts
The fourth quarter installation project cost management
First, the basic concept of project cost management
Second, the scope of project cost management
Third, the project cost information management
Fourth, the project cost information
Five, the project cost index