Current location - Education and Training Encyclopedia - Education and training - 2022 Practical Personal Quality Work Summary (6 selected articles)
2022 Practical Personal Quality Work Summary (6 selected articles)
Time flies and a new job is coming. At this time, you can sum up the work at this stage. By summing up, it enables us to find mistakes and correct them in time. How to write a work summary? I specially collected and sorted out the Summary of Practical Personal Quality Work in 2022 (6 Selected Articles) for you. Welcome to reading. I hope you can read it and keep it.

2022 Practical Personal Quality Work Summary (6 selected articles) (1) Every worker should write a personal work summary after working for a period of time. This work summary can show the previous work achievements one by one, or list the insufficient problems, and write examples of improvement methods and work summary. The following is a summary of personal work in the coking plant for reading only:

In a blink of an eye, I have been in the coking company for xx years. In my work, I have experienced many ups and downs, met many mentors and gained many lessons. Thanks to the leadership for giving me room to grow up, courage and confidence. In the past few years, through our unremitting efforts, we have made some achievements in our work, but there are also many shortcomings. Looking back on the past year, the work is summarized as follows:

First, the annual personal work summary

Summarize the work of sulfur and ammonia section by yourself.

Second, the main problems in the work are:

1, due to the study of business in recent years, I have a deeper understanding of related processes.

2. There are many new technical problems at work, but I know that the process of finding and solving problems is also a learning process. Through continuous study and summary, the problems encountered have been well solved.

3. Sometimes I don't know enough about the work, lack the overall concept, lack the understanding and analysis of thiamine chapters, and lack the understanding of job orientation. As a result, we don't know enough about the optimal process of work, lack logical ability and lack structural thinking. But I believe that in the future work, I will continue to study and think, so as to strengthen my cognitive ability to work and make the best process of work.

Third, work experience.

1. In my work practice, I participated in many collective work and got along very closely with my colleagues. In this process, I strengthened the most precious and important team consciousness. On the basis of trusting yourself and others, the team will be invincible if they have unified thoughts and actions.

At work, a lot of work is done together. In this project, everyone reminds each other and complements each other, which greatly improves the work efficiency. Communication is the most important thing in all work, so we must deal with information timely, effectively and clearly.

2. Every step of work should be precise and meticulous, and strive for refinement. Under the guidance of this mentality, I have achieved satisfactory results in my usual work. Being able to act positively and confidently is the biggest progress in my mentality in recent years.

Now I often calmly analyze myself, recognize my position and ask myself how much I have paid; Always remember that the work content should be precise and accurate, and personal gains and losses should be vague; Avoid risks in time, and be brave enough to take responsibility when problems arise.

3. At work, after practical lessons, I deeply realized that the delay of time is very harmful to the company, which requires us to have a good understanding of the business process before work, and work harder before work to reduce the delay in production caused by the inability to express the workflow well.

At work, I learned a lot of technical and business knowledge, and also strengthened the awareness of production quality, cost and progress; The cooperation with colleagues around me is more tacit. They are all my masters. I learned a lot of knowledge, skills and principles of being a man from them, and I'm glad I had them around when I first started on the road, summing up examples of work summary. I will definitely form an excellent team with them and make better achievements.

Fourth, work experience.

After several years of work and study, I also found that I still have a gap from a professional, which is mainly reflected in the immaturity of work skills, work habits and work thinking, and it is also the place where I will constantly hone and improve myself in my future work. To sum up carefully, I have failed to do well in the following aspects in my work for half a year:

1. The work organization is not clear enough, so it is necessary to prioritize;

In the case of hasty working hours and many things, there must be a detailed and clear plan. If it needs to be completed immediately, it can be completed slowly. I have made great progress in planning this year, but there is still a lot of room for optimization.

2. Not familiar with the process;

During the work, it was found that due to technical problems, including mistakes and omissions, the design was not in place at that time, and the control of this piece was obviously insufficient, and I didn't know how to start. Usually it is always under development, but in the final analysis, being familiar with the business is the prerequisite for completing the production well.

3. The work is not exquisite enough;

Usually, the working distance of fine chemical industry lacks a process of introspection, update and modification at any time. Although the work is often reviewed and summarized, it lacks regularity. For example, updated contents such as function modification may cause errors elsewhere. In the future, we should set aside special time for summary and reflection in our personal work, so as to be refined.

4. Lack of work experience, especially field experience;

This year's field experience has been greatly improved, and we have a new understanding of the whole workshop, but we still lack understanding of some details and specific practices, so we need to strengthen our study in future work.

6. Lack of knowledge summary of daily work;

Work summary has made progress, but it is still not enough. If you look back and think about the right and wrong, gains and losses of daily, weekly and monthly work, you will grow faster. In the future work, I will also regard this as the key to improve myself.

7. Doing things is not decisive enough, sticking to details and procrastinating;

Procrastination is one of my great shortcomings. Everything has to be postponed. If I work more actively and resolutely, I will avoid many unnecessary mistakes in my work. In fact, sometimes, you don't have to be serious in your work. Comprehensively consider the progress, quality and cost, grasp the main contradictions, solve the main problems and make corrections at any time. Everything is done carefully, and people tend to stick to details. Learning to be imperfect is also the progress of work and the requirement of fine chemical industry.

In the future work, I will always pay attention to correcting my shortcomings, and I will certainly develop good work habits and grow into an excellent professional in the company.

Verb (abbreviation of verb) working face

Among them, the following points are the focus of my improvement next year:

1, improve the initiative of work, do things simply and decisively, and don't be slow;

2, work should pay attention to practical results, pay attention to results, all work around the completion of the goal;

3. Improve the overall situation and take whether other people's work can be smoother as a yardstick for measuring work;

4, seize every opportunity to improve professional ability, strengthen the usual knowledge summary work;

5. Thinking and practice of fine chemical industry.

Actual Summary of Personal Quality Work in 2022 (6 selected articles) (Part II) With the attention and guidance of company leaders and the joint efforts of departmental staff, the management of Quality and Safety Department has always adhered to the quality and safety policies of "a century-long plan, quality first" and "safety first, prevention first, comprehensive treatment", earnestly performed departmental responsibilities, deepened quality and safety supervision and strengthened emergency response. Popularize safety production and engineering quality laws and regulations, quality and safety knowledge and business skills, strengthen quality and safety responsibility consciousness and business level, promote the implementation of engineering quality and safety production measures, and ensure the effective control of engineering quality and safety production accidents and the smooth realization of quality and safety objectives. The quality and safety work of our department this year is summarized as follows:

First, the development of quality and safety work

A construction project safety committee and a safety production leading group composed of all participating units of the construction project were set up respectively, and all construction and supervision units were required to set up safety production leading groups respectively. According to the principle of "who is in charge, who is responsible", it is determined that the person in charge of the unit is the first person responsible for production safety. The general manager of xx Company signed the responsibility book of safety management objectives with various construction and supervision units, defined the post responsibilities, and carried out the responsibilities layer by layer. Improving the quality of employees is the most important thing to strengthen basic management. The Quality and Safety Department has strengthened the quality and safety awareness of engineers and technicians and improved the management level. Through construction safety education and training, strengthen the safety awareness of contractors, improve the operation skills of safety production management personnel and front-line personnel, and effectively prevent safety accidents.

Supervise and urge the construction unit to make a plan based on the safety risk assessment in the construction process according to the engineering characteristics and construction organization design, analyze the major hazards in the construction process, refine and improve the preventive measures, identify the major hazards that may exist in the construction process next month, and formulate prevention and control measures. At the beginning of each month, the Quality and Safety Department organizes the safety directors and safety management personnel of the construction and supervision units to hold a meeting on identification and prevention of major hazards, regularly check the information release of warning signs of the units, effectively implement the laws, regulations and technical standards of production safety at the grassroots level, comprehensively consolidate the safety foundation, and realize the standardization of production safety protection, site appearance and construction site safety management.

Strengthen the daily inspection of safety production, carry out regular inspection of safety production, further implement the implementation of safety management rules and regulations through comprehensive and in-depth inspection, and focus on the safety hazards of temporary electricity consumption, construction machinery, service roads (edge protection), bored piles, cranes and other special equipment. For the problems and hidden dangers found, we will make timely rectification by personnel, time and measures to ensure that all safety precautions are put in place and hidden dangers are rectified.

In order to strengthen project construction management and eliminate common quality problems, the Quality and Safety Department requires that technical training, technical disclosure, material entry, construction technology, technical requirements, quality control and other aspects should be analyzed and demonstrated before each sub-project starts, and the construction organization design should be formulated. According to the technical requirements in the construction organization design, first complete the model project, then test the quality indicators of the model, analyze and compare the test results, and then modify and improve the construction organization design. Comprehensively evaluate the process, technology and quality indicators of the first project, determine the process, establish a model project, guide the mass production of subsequent projects, and prevent and correct possible quality problems in subsequent mass production.

Second, the quality and safety issues

Not equipped with full-time security officers according to the number specified in the tender documents; The setting of safety warning signs and signs is not standardized and timely; Temporary electricity consumption is not standardized, which fails to achieve "one machine, one brake, one leakage and one box"; The protection of foundation pit excavation is not timely; Anti-freezing measures for concrete construction in winter are not in place; The step excavation at the junction of subgrade construction filling and excavation is not standardized.

Third, next year.

Continuously establish and improve the quality and safety management system and system, continuously improve the safety technology and management level of project managers at all levels, and continuously improve the knowledge level of safety production and self-protection ability of project employees; Strengthen on-site management and increase education and punishment for violations of discipline; Further improve the internal ledger management to be refined and standardized; Regularly carry out special inspections on the safety of special equipment and strengthen the management of special equipment; Further strengthen the early warning method of the unit and the development, study and education of "safe construction site".

Supervise and inspect the implementation of "four uses and four guarantees" by the construction unit; Strictly control the quality of raw materials, pay close attention to project quality control, focus on spot-checking subgrade compaction and improving the amount of soil ash, bridge and culvert concrete quality and abutment backfill, so as to overcome and reduce the occurrence of common quality defects; Adhere to the principle of "standardized calculation, reasonable expenditure, measurement and payment, and earmarking", and audit and supervise the use of safety production expenses of construction units.

2022 Practical Personal Quality Work Summary (6 selected articles) (3) The personal work summary of quality management engineer is 500 words.

As a project quality manager, I first received quality management training. Through training, I learned the key points of engineering quality management, engineering quality management norms and other related professional knowledge. Quality control is the core of engineering construction. Engineering quality is a systematic process formed by design quality, construction quality and acceptance quality, and it is a comprehensive quality formed by cascade influence. The construction unit carries out the construction according to the design documents, and the quality is formed after our acceptance. Therefore, in terms of quality control, as far as my personal work experience is concerned, the following aspects should be adhered to in engineering quality management to achieve the quality control goal of civil construction management:

1, design quality, first of all, we should start from the source and pay attention to the control of design quality. Our design management department is the competent department of design quality control, and they have done a lot of work for this. However, due to their heavy workload, it is impossible to check it very carefully. Therefore, as a construction management department, it still takes a lot of time to carefully review the design documents before the start of construction, and at least ensure that the mistakes on the drawings are disposed as much as possible half a month after the start of construction. If the upstream design documents are of good quality, there will be no mistakes in architecture, structure and coordination with other disciplines, and many changes will be reduced in the construction process.

2. Construction quality is the center of on-site quality control and the top priority of construction management. The influencing factors of construction quality include personnel, mechanical equipment, construction scheme, materials and environment. Therefore, the construction quality control should also start from the following aspects.

Working in accordance with contracts and procedures is only the most basic requirement for a project quality manager. How to use contracts and procedures flexibly and solve many unclear or out-of-contract things reasonably is the real consideration of work ability.

By observing and learning how to solve such problems in the work of other engineers and leaders, my working ability has been improved to a certain extent. I know that only by constantly learning and accumulating, constantly reflecting on progress, avoiding arrogance and rashness, working hard and improving my ability to deal with problems can I grow into a qualified construction quality management engineer as soon as possible.

Summary of Actual Personal Quality Work in 2022 (6 selected articles) (4) Since the operation of the quality management system, the office has done a good job in employee training and management document control according to the requirements of the company's quality manual and program documents, and successfully completed various management tasks and achieved certain results. The main system management work is summarized as follows:

First, carry out knowledge and skills training to comprehensively improve the quality of employees.

In order to ensure the effective operation of the quality system, meet the needs of the company's management and system implementation, and improve the quality of employees in an all-round way, ISO 900 1: XX version of knowledge training, process technology skills, inspection ability and other training were carried out. The training rate of employees as planned is 100%, and the qualified rate of training assessment reaches 100%.

① According to the requirements of "20xx annual training plan", organize all employees to learn the knowledge of ISO 900 1: XX quality management system and train the contents of "program documents". After testing, the qualified rate of relevant contents reaches 100%.

(2) In order to improve the operation skills of the production personnel, the product technology and operation skills were trained. Pass the examination and issue a work permit.

(3) In order to strengthen quality inspection, a training plan for quality inspectors has been made.

Two, strengthen the control of documents and materials, and implement standardized management.

In order to ensure more standardized control of documents and materials, the office work summary strictly follows the operation requirements of iso900 1 quality management system, and manages the filing and distribution of documents and materials to ensure the integrity and unity of all kinds of documents and materials.

Three. suggestion

In daily work, the printing and copying of documents need to be handled externally, which is costly. It is suggested that the company buy a computer and printer to save costs, and I hope the company leaders will approve it.

Summary of Actual Personal Quality Work in 2022 (6 selected articles) (5) Only by going through XX and summing up the past can we better meet the future. Annual work summary, quality and safety supervisor of construction engineering, not to be missed!

In joy and pain, we have gone through XX years. In this extraordinary year, we have overcome all kinds of natural and man-made disasters. At this time, we must be glad that we can have a beautiful family and a bright future! The year's work is coming to an end. With our continuous efforts, our construction quality and safety supervision has been successfully completed. In one year's work, I believe we have done our best, and we will continue to do so in the coming year!

Under the correct leadership of the Municipal Planning and Construction Bureau and the guidance of the Municipal Party Committee and the Provincial Construction Department, we took the opportunity of the assessment of the quality and safety supervision institutions and personnel of the provincial office in XX, took the "year of safety" as the starting point, constantly strengthened the self-construction of the supervision station, further reformed and improved the supervision and management mode, strengthened building energy conservation, steadily promoted the household acceptance of residential projects, adhered to the efficiency construction of "five-star service", effectively improved the quality and safety supervision and management and service quality, and successfully completed various tasks in XX. The specific work is reported as follows:

(a) XX annual work summary:

1, 174 quality and safety supervision procedures, with a construction area of 2.905 million square meters. The total cost is 3.35 billion yuan, and the quality supervision fee is 9.443 million yuan.

2. Supervise the completion acceptance 103, with a construction area of1607,000 square meters, a total cost of 820 million yuan, and a completion acceptance rate of 100%.

3. 248 quality supervision opinions were issued, and the qualified rate of quality problem handling was 100%.

In June of 4.5438+10, the tower crane under construction was specially inspected and reported;

5.2, xx province building energy-saving branch project quality acceptance procedures were fully launched;

In June and April, a major inspection of construction safety production was carried out, and the "Year of Safety" was launched in an all-round way;

In July and May, a special campaign of 100-day supervision of construction safety production was launched;

In August and June, carry out information statistics and submission of earthquake investigation and investigation of hidden dangers in construction safety production;

In September and August, personnel were sent to participate in the energy-saving inspection of the province's construction projects organized by ministries and agencies.

10, September, actively do XX;

1 1, 1 1, and do a good job in meeting the quality and safety supervision of national construction projects of the Ministry of Housing and Urban-Rural Development;

12. Actively respond to the establishment of a national health city by the municipal party committee and municipal government, and comprehensively intensify the inspection of "creating health";

13, the city further carried out special rectification activities for the safety of hoisting machinery and formwork support system.

/kloc-June 0/4 and/kloc-February 0/2 sent personnel to attend the observation meeting on site management of construction quality and safety held by the ministries and agencies, and made corresponding reports and summaries.

15, completed all the work assigned by the superior leaders.

(2) Continue to adhere to the special acceptance system for pile foundation engineering, steel structure engineering and curtain wall engineering. Carry out indoor environmental testing in an all-round way and strengthen the supervision and management of decoration projects. Entrust quality supervision for the second decoration project throughout the year 15.

(three) to supervise and carry out energy conservation work.

In the first half of the year, the ministries and agencies issued the "Code of Practice for Engineering Quality Acceptance of Building Energy Conservation Department in xx Province". According to relevant laws and regulations and mandatory standards for engineering construction, our station has compiled a quality supervision scheme for building energy-saving projects, which has effectively promoted the implementation of building energy-saving work.

(four), actively carry out the construction of quality supervision station itself, strengthen internal supervision and management.

1. Constantly improve the quality and professional level of station staff, on the one hand, make unremitting efforts in political and ideological education for a long time, on the other hand, organize station staff to study various norms and regulations on a regular basis, on the other hand, actively participate in various trainings and exchange meetings organized by provinces and ministries to improve the professional quality of supervisors;

2. In order to meet the assessment of our station's supervision institutions by the Provincial Supervision Bureau, we have carefully studied the "Assessment Measures of the Provincial Supervision Bureau", defined the assessment contents, and implemented the specific work to people. Through active and serious preparation, I successfully passed the examination.

(five), to further carry out the quality supervision of government information management.

In order to standardize the work management system and improve the office efficiency, our station has effectively implemented the efficiency construction of "five-star service", simplified the procedures and implemented one-time handling, which is convenient for the clients. At the same time, four basic systems were implemented in the station; (1) first question responsibility system; (2) One-time notification system; (3) service commitment system (4) time-limited completion system.

(vi) Existing problems

Although some achievements have been made, there are still some problems and deficiencies, and some work needs to be further consolidated and deepened. Here are some questions:

1, the construction unit has problems such as subcontracting, illegal subcontracting, linking, and unauthorized construction with incomplete procedures.

2. A few construction units lack the awareness of laws and regulations on engineering construction, disturb the market order, connive at the blind construction of construction enterprises without handling the construction permit and quality supervision procedures, and affect the engineering quality and supervision.

3. There are some problems in the supervision unit, such as lax management, incomplete system, low quality, inadequate on-site supervision personnel and failure to supervise according to regulations. After some supervision units undertake supervision tasks, there are not enough supervisors, and they do not conduct on-site supervision according to regulations, and the director rarely goes to the construction site. On-site supervisors have low professional ability and can't find quality problems in time.

Looking forward to XX, we still have a lot of work to do. It can be said that we have tried our best, but this writing needs our constant efforts. In many realistic situations, our work will be hindered and cold-eyed. However, these are temporary difficulties. As long as we always want to do a good job, we can do it well. No matter how difficult it is, we can overcome it. XX years, our construction engineering quality and safety supervision bureau will work harder!

Summary of actual personal quality work in 2022 (selected 6 articles) (6 articles) Under the correct guidance of the leaders of China xxxxx Ninth Engineering Bureau Co., Ltd. and a branch company, under the correct leadership of the project department, and with the efforts of the supervision and construction unit, the project department strengthened management and control for the weak links in construction quality management, and did a lot of fruitful quality work, which achieved good results. The quality work of our project department is summarized as follows:

A, the construction quality

With the joint efforts of the quality department of the project department and all the staff of all departments, the quality production situation of our project department has remained stable and running well. Up to now, there has been no quality accident in this project department.

Second, the main work situation of construction quality

My project department closely revolves around the spirit of the important indicators of quality work of the Ninth Engineering Bureau of Water Resources and Hydropower in China, and organizes various construction teams to make technical disclosure for each working procedure, so as to fully understand the importance of engineering quality ideologically and conceptually. My project department pays special attention to quality work mainly from the following aspects:

One: Technical disclosure

Before the construction of each working procedure, the project department shall organize the construction team to make quality and technical disclosure, put forward requirements for the construction quality of each working procedure, remind the key points and difficulties in the construction, predict the parts and working procedures that may cause construction quality problems in advance, and focus on controlling these parts.

Two: process inspection

Our project strictly implements the "three inspections" system. The construction team shall conduct self-inspection, process handover and mutual inspection, and the project department shall conduct final inspection. Check the factors that may cause quality problems in advance, and unqualified finished products are not allowed to be used. For the team that repeatedly puts forward the construction technology that causes quality defects without paying attention to it, the corresponding quality punishment shall be taken and ordered to rectify immediately. If concrete honeycomb and pits are found on the inspection site, they are generally caused by the high falling height of concrete pouring, concrete leakage, unsmooth template surface and other reasons. My project department put forward corresponding control measures to solve these problems, which have been effectively controlled.

Third, the finished product protection

Strictly follow the finished product protection system formulated by the project to protect the finished products of construction. In view of the construction in hot season and cold season, our project has formulated corresponding plans and measures, and strictly implemented them in the construction. For example, after concrete is poured in high temperature season, it should be covered with plastic film and watered for curing, and the pouring time should be chosen at night as far as possible. After concrete pouring, it is forbidden to enter the next working procedure before reaching the strength of master cheng yen.

Fourth, quality analysis training.

The project department will hold quality analysis meeting on time every quarter to analyze a series of quality defects in recent site construction and put forward effective treatment and control measures. Verify the treatment measures proposed for the problems in the last quarter. So as to improve the management of aquatic products by the managers of the project department, realize the full participation and control the quality in an all-round way.

China xxxx No.1 projects department

October 15th, 20 13