Measure accurately and check the size
Before laying, according to the design requirements, the measurement should be accurate, the center and elevation of the furnace should be set out, and the dimensions and related elevations of each part of the masonry should be checked.
Staggered masonry, pointing full.
Refractory brick masonry should be staggered, mud in brick joints should be full, and the surface should be pointing. Dry masonry, except as specified in the design, is generally filled with dry refractory powder.
Alignment of wooden hammer and rubber hammer
You can't chisel bricks on refractory brick masonry. When laying bricks, align the wooden hammer with the rubber hammer. Don't knock on the masonry when the mud is dry.
The machined surfaces of the bricks face the furnace respectively.
The machined surfaces of the bricks face the inner surface of the furnace and the furnace trough or expansion joint respectively.
Step fork
When bricklaying is interrupted or reworked, trapezoidal ramps need to be made.
Sit in the right position and build
Composite brick should be built according to its assembled inner diameter, size and elevation.
Prevent from getting wet
Fire-resistant masonry and thermal insulation masonry should be protected from moisture from construction to production.
Flash youth composition 1
The wind chimes of youth opened the heart, and the colored flutes of youth blew the dreams. The breeze of youth dispersed my troubles, and