Summary of Fan Substation Work
Over the past year, under the correct leadership of the leaders of the bureau and departments, all the staff of our station have adhered to the important thought of "the spirit of the 17th National Congress", actively responded to the call of the Party and the masses, and carried out in-depth "learning and practicing Scientific Outlook on Development activities". In the work of safety production, we always adhere to the principle of "protecting people, equipment and power grid", work hard, and actively participate in various work objectives put forward by our bureau at the beginning of the year. Focus on strengthening professional management such as equipment management, defect management and basic management. , and cooperate with our Spring and Autumn Safety Inspection and other phased first-class work. By February 30th, 65438, all the tasks assigned by our bureau had been successfully completed, and a long-term continuous safety production record of 7056 days had been achieved. The work of our station this year is summarized as follows:
First, the basic safety work in the station
Safety in production is the top priority of all the work in our station, so we should strengthen the study of various procedures in substation; Learn safety briefing in time, draw lessons from accidents, strictly implement "two votes and three systems", standardize operations, put an end to habitual violations, and actively participate in daily safety activities and various special safety activities deployed by superiors. Seriously study the principles and policies of safety production, carefully study all kinds of safety documents, safety briefings and accident reports issued by superiors, and earnestly study and investigate with a realistic working attitude to find out the weak links and equipment defects in safety production.
Second, the production safety statistics
Implement 1 and "two-vote system"
20XX 1 &; Mdash6 On June 5438+February, our station accepted dispatch instruction 12 1, filled in switching operation ticket 1 10, and carried out switching operation112. Accepted 15 working tickets for Class I substation and 7 working tickets for Class II substation, with a qualified rate of100%;
While doing a good job of "two votes", I also ensure that the simulated rehearsal operation system is implemented before operation, and strive to achieve the control goal of "zero" misoperation. To achieve this goal, we must strengthen the basic training of daily operation, often hold training and exercises to prevent misoperation, increase the monitoring of singing tickets, and strictly implement the "four controls" in operation. Only in this way can it be implemented accurately.
2, safety production target completion:
(1) Guarantee target: The power generation enterprise has no serious personal injury or above accidents, no general equipment accidents with personnel responsibility, no power outage accidents that have serious social impact, no fire accidents at this station, and no general misoperation accidents, and all the safety production guarantee targets issued by the bureau are fully fulfilled.
(2) Control objectives:
① Personal injury accident:1&; In June+February, 5438, there was no personal injury accident at our station. ② Substation accidents, obstacles and anomalies:1&; From June to February, 5438, there were no substation accidents and obstacles, and 7 items of substation equipment were abnormal.
4, instruments, meters indicate normal.
Three. Basic operation data statistics
The active load of the main transformer is 8,266 kW, which appeared in August, and the power supply is 29.26 million kWh, accounting for 6% and 9% of the county power grid power supply respectively. 3854 operations were error-free, and 300 days were safe without accidents.
Fourth, pay close attention to anti-accident drills.
We make an anti-accident plan in combination with the operation mode of this station, so that the operators can deal with the accident accurately when the fault comes. Our pre-job training and safety activity days are interspersed with anti-accident drills and accident anticipation. I stood in June of "Safety Month" and conducted targeted anti-accident drills. Through accident prediction and drill, not only the technical and psychological quality of the operation personnel on duty is improved, but also the operation personnel can accurately and skillfully analyze the accident when the operation management fails, improve the accident handling ability and ensure the safe operation.
Five, pay attention to the training and learning of employees, improve the overall quality of employees.
In terms of content, I stand on the principle of "what to do, what to learn, what to lack and what to make up". Organize employees to carry out safety technical training, learn safety laws and regulations, explain safety precautions, and improve professional and technical quality and safety awareness. In terms of methods, it is flexible and diverse. Through collective training, anti-accident drills, centralized rotation training, amateur self-study and other forms and methods, employees are trained in safety awareness, safety knowledge, business skills and weak links in safety skills. Enhance employees' analytical ability and adaptability to the objective environment. In terms of time, there are long-term planning and short-term arrangements. Make monthly and quarterly study plans and fix the study time every month. In addition, according to the needs of the situation and tasks, adjust the plan in time and summarize the experience and lessons of the accident in time as a teaching plan. Through these measures, the learning ability of employees will be gradually improved and their comprehensive quality will be improved.
Intransitive verbs focus on civilized production and democratic management.
Our station adheres to the "people-oriented" management concept, pays close attention to the production and living environment, and requires all station staff to be on duty with dressing the and certificates to keep the house clean and consistent. The appearance of the station is basically "clean and tidy", creating a rigorous, beautiful and comfortable working environment for everyone. People are also responsible for environmental hygiene and team hygiene, and at the same time, some supervision and assessment methods have been formulated to improve the civilized production consciousness of team members. Seven, 20XX work priorities
1, carefully study the important instructions and speeches of bureau and station leaders, understand the spirit of important meetings, and implement all the work assigned by superiors.
2. Further study the new "two votes" standards and related management systems issued by provincial companies, and carry out special rectification activities of "two votes and three systems" in combination with their own safety production practice to prevent electrical misoperation.
3. Strengthen the analysis and control of dangerous points. Electrical misoperation accidents are extremely harmful, and the main reason for misoperation accidents is that the dangerous points in the operation process are not effectively controlled. Therefore, it is of great significance to find out the dangerous points in the operation process, analyze their causes and control them in real time to prevent the occurrence of electrical misoperation accidents.
4. Actively participate in anti-accident drills. There should be strict requirements for anti-accident drills, and the number of drills should be easy to be less, easy to be detailed, and not easy to be much. The form of drill should pursue on-site simulation, pay attention to the process of drill, and prohibit activities based on the content of drill.
5. Standardizing self-on-site behavior is the key. In addition to poor organization and other reasons, the accident was discovered by ourselves, mainly because the on-site workers' operation behavior was not standardized. Large-scale and complex operations are often not prone to accidents because of strict organization, standardized field operations and concentrated personnel. On the contrary, small and simple operations are prone to major accidents. Therefore, we should be highly alert to simple work, and even simple work can't simplify a link in the working procedure.
6. Participate in various safety activities and live a good life as a safety team. Activities should be diversified, such as studying safety documents, checking safety facilities and discussing existing problems. , but the content of the activity should be accurate and not too comprehensive. Fundamentally curb violations and equipment accidents, so as to be aware of them and prevent them before they happen.
7. Seriously participate in on-site equipment training to improve the familiarity with the equipment. Strengthen the inspection of equipment, regularly quantify, do not ask for a wide range, but ask for everything; Strengthen night patrol and special patrol of equipment, find defects in time and deal with them in time to effectively prevent pollution flashover.
8. In accordance with the overall requirements of "perfection, standardization, consolidation and improvement", carry out extensive and in-depth standardization work and further deepen the work of "creating first-class".
9. Develop good habits in daily work, sum up experiences and records from practical work, and form specific words.
10, abnormal and near miss control is the goal of security team production and our own efforts. How to achieve the goal of safety team can only be achieved by improving the safety management level of the team and enhancing the role of safety education and training. As long as safety management adheres to the principle that hidden dangers are better than open flames, prevention is better than disaster relief, and responsibility is more important than Mount Tai, it is the premise and key to realize safe production of electric power. Doing a good job in accident prevention is the primary job that every operator must do, because safety in production is related to the development of enterprises, the honor of teams and groups, and the vital interests of every employee. At the same time, through creating safety team culture, effectively carrying out safety team activities, improving accident handling ability and other activities, the substation accidents are controlled to the lowest point, and the safety production is truly realized. Seriously analyze the possible hidden dangers of accidents, strengthen the study of dangerous points and control measures issued by this bureau and the study of preventing dangerous points from misoperation in this class. Seriously analyze the unsafe phenomena and hidden dangers in the operation of electrical equipment, and formulate corresponding preventive measures to fundamentally curb the occurrence of illegal equipment accidents.
In the future, we should stress science and be innovative. Diligent and studious, improve independent thinking ability; Be realistic; We should study and have both ability and political integrity. Constantly improve innovation ability, improve dialectical thinking, and further assume the responsibility of safe production.
In a word, Hongshiqiao substation has done a lot of in-depth and meticulous work in the safe operation management of 20XX substation. This humble achievement is the result of the care and guidance of the bureau leaders, which can not be separated from the help and support of the competent leaders and the concerted efforts of Qi Xin, the staff of the whole station. Of course, according to the requirements of modern substation management, we still have a big gap. In the future, we will strengthen the safety education for employees, further consolidate the basic work of safety production, closely focus on safety production, constantly explore new ideas and methods of safety work, and strive to build a "one strong and three excellent" modern power supply enterprise.
Summary of substation work Fan Wener
I graduated from xx Electric Power School in June, 20XX, majoring in power plant and electric power automation. After that, he was assigned to xx Power Supply Company, and reported to the human resources department of the company on February 7, 20XX. It has been four years since then. Through the company's organizational arrangement, the factory education and training were carried out, and then the secondary education and training were organized in the work area. In March, 2002, I entered the relay protection class in the electrical maintenance work area to conduct team education and training. In recent years, I have done some professional and technical work with the help of my colleagues and leaders. The work is summarized as follows:
20XX: I participated in the field practice with my master for the first time, and participated in the spring repair of 1 10kv Gaoya substation and 1 10kv Xindian substation; Participate in the installation and commissioning of the newly-built 1 10kvxx substation. Advanced gis indoor primary equipment is used in Anding Substation 1 10kv, and the whole substation is unattended. Participated in the technical transformation project of 1 10kv new substation, and realized the microcomputer transformation of protection; Participate in the unattended transformation of 35kv Neiguan Substation, Ningyuan Substation and Yangpo Substation; During this period, I have been involved in the elimination of defects in other substations. In my work, I gradually became familiar with the equipment and working procedures, and the relevant provisions in the Electrical Safety Work Regulations. In this year's work, I have a systematic and preliminary understanding of substation and relay protection. I will rationally use common tools and professional tools, and do a good job in maintenance, correctly select measuring instruments and meters, do a good job in maintenance, correctly implement the "Electric Power Safety Work Regulations" and relevant regulations on relay protection, set various relays according to the fixed value notice, and correctly implement various requirements and measures such as cross-line connection and continuous switching in the notice of relay protection and automatic device setting.
The period of 20XX was SARS: I participated in #2 main transformer, 4 1 10kvxxx substations,10kv line protection device,10kv line protection device, bus differential device and low-cycle load shedding together with the work area owner, work area leaders and company leaders. In the project acceptance stage, xxx encountered heavy rain and flood. Under the leadership of the company, my construction workers risked their lives to carry out emergency rescue work, so that the power equipment was intact, and I was also praised by the company. Participate in the installation and debugging of integrated automatic control equipment in newly-built 1 10kv Tao Yang substation; Participated in the elimination of defects in various substations; During this year, I have further mastered the knowledge of relay protection, and I can carry out simple relay protection setting value calculation and variable ratio calculation, understand the control signal, measurement and secondary circuit diagram of relay protection and automatic device, and skillfully judge the correctness of circuit wiring according to the diagram, check the correctness and completeness of relay protection device inspection report, correctly implement the contents of relay protection and automatic device anti-accident measures, deal with circuit defects and investigate common faults.
During the period of 20XX: I participated in the acceptance of xx330kv substation, which is the first substation with 330kv voltage level in our company, giving me the opportunity to learn more about high voltage level. Participate in the installation and debugging of gis indoor primary equipment and its secondary equipment in 1 10kv Gaoya substation; In this year, we have mastered the relay protection technology to a great extent.
20xx years: participated in the battery replacement of old DC system in 1 10kvxx Cliff Substation, xx Substation and xxx Substation; Participate in the installation and debugging of 1 10kv Weiyuan substation and Gaoya substation with low cycle load shedding; Participated in the addition of 1 10kv Tao Yang Substation 1 10kv line, installation, commissioning and commissioning of bus coupler protection devices. In this job, under the guidance of my master, I learned to make a work plan and what the person in charge of completing the project independently should master. During this year, I have the ability to take charge of an ordinary project independently.
I just participated in the spring inspection of 1 10kvxx substation, xx substation and xx substation in 20xx. In this new year, I will try to make myself more mature, comprehensive and advanced in my work. According to the spirit of this year's company meeting, I will carry out "love activities" and take the implementation of "safety project" as the main line of work to ensure safety and stability, which will be the first in all my work in 2006. This main line will make me perform better in this new year.
In the past few years, I have mastered the basic knowledge that should be known and mastered in relay protection work, and have some experience and understanding of many problems encountered in relay protection work. In the future work, I will continue to consult the masters with an open mind and study the knowledge of relay protection hard, so that I can play a better role in relay protection.
In the professional and technical work in recent years, I have done some practical work in production practice by using the professional and technical knowledge I have learned, and I have a certain technical work ability. However, there are still some shortcomings. In my future work, I will strengthen my study, overcome my shortcomings and strive to continuously improve my professional and technical level.
As an ordinary power worker and a qualified relay protection professional in xx Power Supply Company, I hereby apply for the qualification of relay protection professional assistant engineer, and hope that the leaders of the title working group of the company will review, hope to pass and give encouragement!
Three Selection of Model Papers for Substation Work Summary
In 20xx, with the correct leadership and help of the company leaders and the joint efforts of all the staff on duty in the distribution room, our station always regards the safe and economic operation of the distribution system as the main task of substation management, and insists on safety first.
The specific safety work is summarized as follows:
(1) The station always puts safety work in the first place, puts work in the first place, and strictly implements electrical safety regulations and various rules and regulations of the company in the work.
(2) Conduct regular safety education, improve everyone's awareness of safety in production, and make it clear that without safety, the venues in the sports center cannot guarantee normal power supply and the smooth holding of the National Games.
(3) Constantly improve the technical level of the attendant, insist on writing articles on the quality of personnel, teach and learn from each other, learn from capable people, conduct regular technical training, and conduct anti-accident drills in combination with the actual situation in the station and the National Games. In order to make progress from the shortcomings, due to the above measures, the professional quality of the station staff has been improved to varying degrees, familiar with the performance and operation mode of equipment, able to handle and analyze accidents, and familiar with the equipment, performance and rules and regulations of this position. Because of the advanced equipment and high technology content, on-site training is often carried out to ensure the safe operation of the equipment.
(4) Various systems are complete, responsibilities are clear, and there is no violation. The handover system operates in an orderly manner according to electrical safety regulations and company requirements. There were no unclear handover, lax handover and untimely handover. Labor discipline is strengthened, and there is no phenomenon of leaving the post and leaving the post. Have a work permit when going to work, and don't do anything unrelated to work. You are always in a full state of mind.
(5) Everyone is responsible for equipment management. Do a good job of equipment inspection and defect elimination, adjust the power factor in time in combination with the load measurement of distribution equipment, and implement single power supply operation when there is no important event to reduce reactive power loss. Check the equipment on time, and there is no delay or omission in the inspection. In the case of operation mode change, heavy load, abnormal equipment failure, bad weather, etc., the number of inspections shall be increased as required, so that the equipment in our station can always be kept in good condition, and the abnormal situation shall be handled in time to ensure the safe, reliable and economical operation of power supply equipment.
(6) All records shall be neat, standardized and complete, and there shall be no mistakes and omissions, and the time shall not be inconsistent, and the "two votes and three systems" shall be strictly implemented.
(7) The substation safety work is carried out as planned, so as to check the project to people, set the completion time, set the results and requirements, check the measures to prevent small animals once a month, and plug the loopholes in time when found. Safety appliances should be checked before use, and should be used after expiration. It is forbidden to use expired or unqualified appliances.
Because the safety work of our station is carried out according to the above contents, there has not been an accident in 20xx years, and there has not been an equipment accident caused by inadequate inspection equipment, which has ensured the safe and normal power supply of the company.
Thoughts on annual safety work of substation
In order to seriously implement the policy of "safety first, prevention first", ensure the safety of equipment, ensure the safe and economic operation of power transformation and distribution equipment, and ensure the safe and normal power supply of the company, the annual safety work idea of power distribution room is formulated.
1. Clarify the objectives, implement the responsibilities, strengthen the safety awareness, start with the safety awareness of the personnel on duty, strengthen the awareness of "safety first, prevention first", carry out labor competitions such as "no accidents for 100 days" and "no mistakes for thousands of people", put an end to illegal operations, and no accidents occur throughout the year.
2. Improve the rules and regulations, strictly implement the Electrical Safety Regulations and the company's various rules and regulations, and organize regular study of safety regulations.
3. Improve the emergency mechanism and emergency handling capacity. Lines and equipment have always been the top priority in the safety work of the distribution room. The distribution room will strengthen safety management, formulate and improve emergency plans, strengthen the emergency handling capacity of the personnel on duty for unexpected accidents of lines and equipment, and implement safety measures according to the requirements of the power sector and the company.
4, regular maintenance, strengthen inspection, to ensure safe and stable operation. In addition to daily maintenance, power outage maintenance will be carried out in spring and autumn, and patrol management of lines and equipment will be strengthened in daily work to ensure that the patrol is in place on time, and hidden dangers will be found and eliminated in time to ensure the safe and normal operation of equipment.
Selected essays on substation work summary 4
Since the substation was put into operation on February 16, 20XX, it has reached the end of the year unconsciously. In the past year, according to the unified deployment of the company and the Third Waterworks, we successfully completed all the work plans made at the beginning of 20XX, including the study and training of safety work objectives and related safety regulations in substations, and achieved good results and expected purposes. The brief situation is summarized as follows:
First, according to their own reality, establish and improve the safety rules and regulations in the station.
Formulating necessary, reasonable and strict rules and regulations is an effective means to ensure the safe production of substations. To achieve electrical safety, it is necessary to organize the staff of the whole station, do everything according to the rules and regulations, do their own duties and responsibilities, and truly achieve "safety in production, everyone is responsible."
Before the substation was put into operation, the team formulated the post responsibilities and safety responsibilities according to the different responsibilities of the personnel on duty, and determined the "substation safety work goal", that is, no productive personal injuries and minor injuries occurred; No power grid damage and major equipment damage accidents; No three-fault accident of relay protection occurs; No misoperation accident occurs; Equipment accidents or other accidents without general responsibility; There are no other serious violations of discipline. In addition, we have formulated various safety operation procedures, anti-accident and misoperation prevention measures, operation scheduling management system, equipment management system, operation analysis management system, etc. Make clear the relationship between people and equipment, and make sure that every job and equipment are managed, from the main transformer switch to the key, everywhere. After the substation was put into operation, we supplemented and improved the relevant regulations according to the changes of the situation.
In a word, people, people and equipment, equipment and equipment can be organically organized into a reasonable whole by establishing a sound and perfect system of rules and regulations. It has laid a solid foundation for preventing all kinds of accidents and ensuring personal safety and equipment safety.
Two, pay attention to business training, and strive to improve the professional quality of the class committee.
In today's era of rapid development of science and technology, the quality of personnel is very critical. It is very important to cultivate a high-quality team and do a good job in training. According to the requirements of the superior factory director, the operation class cooperated with the station technical room to formulate a detailed training plan, which was carried out step by step in four quarters throughout the year.
In the first quarter, we focused on the scheduling procedures, so that everyone mastered the relevant knowledge of system equipment operation management and accident handling; At the same time, because our station is newly put into operation, the quality of personnel and equipment has not been mastered, so we focus on the study of new equipment in the station, so that everyone can understand and master its operation, maintenance, operation methods and precautions.
The second section systematically studied the working rules of safety production. Make everyone realize that safety work is the most important thing to ensure the safety of equipment and people, put an end to violations and avoid accidents; Combined with mass safety inspection, everyone's safety awareness and knowledge have been greatly improved; Through this quarter's study and examination, everyone has a comprehensive grasp. At the same time, in order to fully master professional knowledge, cultivate good study habits, make business training routine and institutionalized, and constantly improve the level of business knowledge.
In the third and fourth sections, we deeply studied the operation rules of substations. Due to the continuous improvement of system equipment and the issuance of new operating procedures and management assessment system, all the staff on duty have carefully studied and studied some new regulations under the active organization. Really understand and master through discussion and other forms. In addition, the third quarter is an accident-prone season. In view of this feature, we conducted targeted anti-accident drills. The drill shows that the ability to judge and handle accidents, the level of command and operation, the uploading and releasing of secondary values, and polite expressions have all been improved to a certain extent, and good practical results have been achieved.
At present, there is a strong learning atmosphere in substations, and many comrades can use their spare time to learn business knowledge and improve their business ability.
Third, set up QC team, strengthen scientific and technological research, and provide guarantee for equipment safety.
Our station has concentrated technology and a high starting point. Carrying out scientific and technological research activities in a timely manner will help improve the system and equipment and improve the technical level of the team. This year, we have two major QC projects under way or completed:
(1), system and equipment drawing list.
After the completion of the substation, the construction unit and the manufacturer have handed over all the design and construction drawings, technical specifications and other related materials to the substation technical room in stages. However, it is found in the work that the drawings are different from the actual situation. For the sake of safe production, together with the technical office of the station and with the support of the factory leaders, we reported this work to the relevant departments of the company. At present, the drawings of 6kv switchgear and main control unit have been reviewed, and the rest are in progress.
Transformation of hydraulic operating mechanism of GIS circuit breaker.
Hydraulic operating mechanism belongs to the control part of GIS circuit breaker, and its state is directly related to whether the circuit breaker can operate normally. In order to effectively monitor its internal state, we carefully checked the internal and external structures, compared the relevant drawings and specifications, and put forward a transformation scheme: adding a DC electromagnetic counter inside it to monitor the startup times of the hydraulic pump, so as to monitor the internal leakage of the hydraulic operating mechanism.
Fourth, strengthen basic management and attach importance to team building.
Giving full play to the master spirit of the whole class and mobilizing the enthusiasm, initiative and creativity of the whole class in production are the core of team building in operation class. Because it is not easy for all staff to concentrate at one time, the class takes advantage of the opportunity of study and training and insists on holding a team meeting once a month to discuss various problems in the process of duty. Correct if there is one, and encourage if there is no one.
We have also compiled various management assessment standards and organized the whole class to learn, so that everyone can understand why we should do this. There are procedures, standards of advantages and disadvantages, penalties for violators and rewards for those who abide by the rules. When the substation was just put into operation, some records and statements were scrawled, misread and omitted from time to time. In the case of finding out the facts, resolutely deduct points according to regulations. When the duty officer sees that the system is not written on paper, but hung on the wall, he can consciously abide by it.
In the company's many inspections and appraisals (including midnight surprise inspection), the clean and tidy working environment of the substation and the professional quality of the personnel on duty left a deep impression on the superior inspectors.
The above achievements can not be achieved without the efforts of the whole class. At the same time, the factory leaders and the technical office of the station also paid hard sweat. Of course, we also have shortcomings, and there is still a gap from the "three first-class" proposed by Manager Chen. In the future, we will work harder to promote the in-depth development of team work and provide a strong guarantee for the safe and high-quality water supply of the second and third water plants.