Display doors and windows, pipes, cables, floors, wall paint, exterior wall tiles, building materials, building intercom system, transformer box, interior wall insulation system … visible or invisible; From balcony railings to doors and windows, from switch sockets to water pipes and wires, from intelligent systems to energy-saving materials, from external walls and internal walls to the ground, balconies and other architectural technologies are displayed.
Extended data:
Key points of exhibition in construction area:
First, the model first:
1. Require the general contractor to require the construction of the construction method model area.
2. The general contractor shall be responsible for the method training for each labor team.
3, the project company engineering department and supervision records, supervision records.
Second, the method model construction:
1, specify the control point.
2. Specification of node details.
3, after the project department, supervision unit, the owner's acceptance.
Third, the construction method model training disclosure:
1. Conduct training disclosure on model construction methods for all labor teams entering the site.
2, combined with visual revelation