Current location - Education and Training Encyclopedia - Education and training - Doors and Windows renovation contract
Doors and Windows renovation contract
Renovation contract model for doors and windows (5 general rules)

Nowadays, many citizens' awareness of rights protection is constantly increasing, and contracts may be used anytime, anywhere and in various scenarios. Signing a contract is an important measure to reduce and prevent disputes. Then do you know how to write a formal contract? The following are renovation contract samples of doors and windows I collected for you (generally 5). You are welcome to study for reference. I hope it helps you.

Renovation contract for doors and windows 1 Party A (the Employer): _ _ _ _ _ _ _

Party B (contractor): _ _ _ _ _ _

Article 1 General situation of the project

1. 1 Project Location:No.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1.2 building structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1.3 project cost: the price of family bedroom decoration project is agreed as follows according to the principles of market competition, high quality and good price: total price: _ _ _ _ _ _, in words (RMB): _ _ _. In which: material cost: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (See Schedule 3: Quotation for Family Room Decoration Project for details). With the consent of both parties, the construction content is changed, and the project payment for the changed part shall be calculated separately according to the actual situation.

1.4 project contracting method: both parties agree to adopt the following _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

(1) Party B contracts all materials. (See Annex V: List of Decoration Materials Provided by Party B)

(2) Party B contracts some materials and Party A provides some materials (see Annex 4: List of Decoration Materials Provided by Party A and Annex 5: List of Decoration Materials Provided by Party B);

(3) All materials contracted by Party B and Party A (see Annex 4: List of Decoration Materials Provided by Party A).

1.5 project duration _ _ _ _ days; Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1.6 project contents and practices (see Annex I: Confirmation Form of Decoration Project Construction Project and Annex II: List of Decoration Project Contents and Practices).

Article 2 Qualification of the construction unit

2. 1 Any unit undertaking the decoration project of family rooms shall hold the qualification certificate of construction enterprises with the scope of decoration project contracting issued by the construction administrative department.

2.2 Party B is an enterprise legal person approved and registered by the administrative department for industry and commerce, and has passed the latest annual inspection of the enterprise, and has the qualification of engaging in civil architectural decoration projects approved by the construction administrative department, and the qualification grade meets the requirements of this construction. If Party B does not have the business qualification or corresponding qualification, Party A has the right to terminate this contract, and Party B shall immediately return the fees paid by Party A and compensate for the losses.

2.3 Individual decoration workers who undertake family room decoration projects should register with the construction administrative department or its designated institution where the project is located with the work permit, identity card and temporary residence permit issued by the relevant competent departments of local people's governments at or above the township level, and implement the system of "registration, training and assessment, skill appraisal and holding certificates". Specific measures shall be formulated by the construction administrative departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government.

2.4 No unit or individual without the Qualification Certificate of Construction Enterprise or the Qualification Certificate of Individual Decoration Practitioner issued by the construction administrative department may undertake the decoration project of family rooms.

Article 3 Project supervision

If it is a supervision project, Party A (or Party B) shall sign a project supervision contract with the supervision company separately, and notify Party B (or Party A) of the name, unit, contact information and responsibilities of the supervision engineer.

Article 4 Construction drawings

Both parties agree to provide the construction drawings in the following ways:

4. 1 Party A designs and provides the construction drawings by itself, and the submission time is _ _ _ _ _ _ _ _ _ (see Annex 6: Design Drawings of Home Decoration Project);

4.2 Party A entrusts Party B with the design and construction drawings in triplicate, with Party A, Party B and the construction team holding one copy respectively (see Appendix 6: Design Drawings of Home Decoration Project), and the design fee shall be paid by Party A (this fee is not included in the project price);

4.3 The construction drawings shall take effect after being signed by both parties.

Article 5 Rights and obligations of Party A

5. 1 _ _ _ _ days before commencement, to create conditions for Party B to enter the site for construction. Empty all or part of the house and remove obstacles that affect the construction; Protective measures should be taken for furniture and furnishings that can only be partially vacated, so as not to affect the construction. Party B's construction personnel shall carefully check and protect the animals on Party A's construction site, and both parties shall sign the "List of Articles";

5.2 Remove the original telephone equipment before construction; Provide water and electricity during construction, and explain the matters needing attention in use;

5.3 Responsible for coordinating the relationship between the construction team and the neighborhood;

5.4 It is forbidden to dismantle the indoor load-bearing structure. Need to dismantle, change the load-bearing and non-load-bearing structure of the building, or move the kitchen, bathroom, equipment and pipeline, shall be responsible for the relevant departments to handle the corresponding examination and approval procedures;

5.5 Participate in supervising the project quality and construction progress, and participate in the material mobilization and project completion.

Party A:

Party B:

Date of signing:

Doors and Windows renovation contract 2 Party A:

Party B:

According to the requirements of People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Construction Law and other relevant laws and regulations, combined with the specific conditions of this project, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B have reached the following agreement on the manufacture, installation and construction of plastic-steel windows in Jiuxianqiao No.1 Middle School through consultation:

I. Overview of the Project

1, project name:

2. Project location:

3, door and window area:

Second, the construction content

Production and installation of plastic steel doors and windows, including raw material procurement, processing and production, transportation, on-site coordination, on-site installation, edge sealing, protection of finished plastic steel doors and windows, on-site acceptance, maintenance and replacement caused by quality problems, etc.

III. Contract Price and General Contract Management

The total cost of the tax-included project for the manufacture and installation of plastic-steel doors and windows is tentatively set as: one hundred and sixty-one thousand seven hundred and sixty yuan only (¥ _ _ _ _ _ _ _ _).

Fourth, quality standards.

1. The standard atlas is adopted for the plastic steel doors and windows of this project: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. The quality of finished plastic-steel doors and windows shall conform to: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

3. The construction and installation of plastic doors and windows shall conform to the Code for Installation and Acceptance of Plastic Doors and Windows (JJ103), Code for Quality Acceptance of Building Decoration Engineering (GB502 10), Code for Construction of Residential Decoration Engineering (GB50237) and Code for Installation and Acceptance of Plastic Doors and Windows (DBJ/KLOC-0).

4. The main materials (profiles, lining steel, glass) required for this project shall be purchased by Party A, and the auxiliary materials shall be purchased by Party C according to the brand designated by Party A. The materials purchased by Party B must meet the design requirements and relevant national standards, and have quality certification materials.

Verb (abbreviation of verb) responsibility problem

1. Rights and obligations of Party A

(1) Confirm with Party C the drawings of door and window processing and production within 7 days after signing the contract, and make on-site disclosure to Party C. ..

(2) Party A, Party B and the supervision company * * * are responsible for supervising and inspecting the project quality, progress and acceptance of concealed works, handling design changes, visas and acceptance procedures, and coordinating the cooperation and collaboration between on-site construction units.

(3) Coordinate Party B to provide Party C with the construction site and water and electricity connection points required for construction, and explain the matters needing attention in use.

(4) Coordinate Party B to provide Party C with a storage place for semi-finished products and tools. ..

(5) Party A shall organize the project acceptance as stipulated in the contract and complete the settlement according to the contract period.

(6) Party A shall pay Party C's project funds in time as agreed in the contract, which shall be withheld and remitted by Party A and paid to Party B's account, and then paid in full by Party B to Party C. Party B shall not detain the project funds for improper reasons.

(7) Party A shall pay the general contracting management fee and construction cooperation fee to Party B as agreed.

2. Rights and obligations of Party B

(1) Party B, together with the supervision company and Party A, shall be responsible for supervising and inspecting the project quality, progress and acceptance of concealed works, handling design changes, visas and acceptance procedures, and coordinating the cooperation and collaboration between the site construction units. The supervisor and Party A are responsible for randomly sampling the finished doors and windows that Party C enters the site according to the specification requirements (not less than once for each project) and sending them to the testing department for performance testing.

(2) Party B shall provide Party C with the construction site and water and electricity connection points required for the construction, and explain the precautions for use. Party B shall not charge Party C for water and electricity.

(3) Party B is responsible for providing Party C's semi-finished products and tools stacking site, as well as the existing vertical transportation tools and scaffolding on site.

(4) Party B shall, under the organization of Party A and the supervision unit, handle the handover of the civil hole with Party C in time, provide the installation baseline of doors and windows on the construction site, and determine the installation position of doors and windows to meet the installation requirements.

(5) After the doors and windows are installed, Party B shall be responsible for the sealing work around the doors and windows (Party C shall be responsible for the sealing work around the doors and windows).

(6) Party B shall not charge any fees to Party C..

3. Rights and obligations of broadcasting

(1) Appoint Party C's site representative to be responsible for the performance of the contract, organize the construction as required, ensure the quality and quantity, complete the construction task on schedule, and handle all matters that Party C is responsible for.

(2) Party C shall enter the site for construction as required by Party A, and organize the procurement, transportation and protection of semi-finished products in advance, and obey the overall management of the general contractor.

(3) According to the provisions of the construction safety code, technical measures such as construction safety and security shall be taken to ensure the safety of on-site construction personnel and third parties, and be responsible for the protection of on-site facilities and finished products.

(4) Accept the supervision and management of Party A and the supervision company, and obey the overall project schedule and construction coordination of the general contracting construction unit.

(5) Carry out the construction in strict accordance with the approved processing drawings and the current national construction and technical acceptance specifications to ensure the project quality and contract time limit.

(6) Participate in project acceptance. After the project is completed and accepted, the completion data shall be handed over in time according to the requirements of Party A, and the project settlement shall be prepared.

(7) After the project is completed, the garbage shall be cleaned up in time and put in the designated place.

(8) During the construction period, Party C shall be responsible for the cleaning and garbage removal of the construction site and municipal transportation roads (only referring to the pollution caused by Party B's transportation vehicles). If punished by the general contractor and government functional departments, Party C shall bear the fine by itself.

(9) According to the provisions of this contract, Party C shall protect semi-finished products and finished products, and conduct intermediate acceptance and completion acceptance.

(10) Party C takes full responsibility for the quality and safety work in the construction process, and has nothing to do with Party A and Party B. ..

(1 1) If Party C fails to organize the construction according to the quality and safety requirements, Party A has the right to ask Party C to leave the site and contract the project separately.

Six, intermediate acceptance and project acceptance

1. Intermediate acceptance: main processes such as fixing installation, door and window frame positioning, door and window sash installation, hardware fittings, frame edge caulking and gluing. Only after passing the sampling inspection by Party A and the supervisor can we enter the next working procedure.

2. Preliminary acceptance: Party C shall submit four complete sets of completion data and acceptance report to the project supervisor. When it is difficult to review the completion data, the initial inspection time shall be agreed, which shall be attended by the supervisor, Party A, Party B and Party C. After the initial inspection is passed, the completion acceptance time shall be agreed and the project handover formalities shall be handled.

3. Completion acceptance: The project handover acceptance team composed of relevant departments, Party A, Party B, Party C and the supervisor will conduct comprehensive inspection and acceptance of the project. After the acceptance, Party A, Party B and Party C will handle the written handover procedures.

Seven. engineering supervision

1. Party A entrusts _ _ _ _ _ Construction Supervision Co., Ltd. to be responsible for the supervision of this project. Party C shall designate a representative to be responsible for contacting with the supervisor and obey the instructions and management of the supervision engineer; Attend the supervision meeting on time, and be fined _ _ _ _ _ _ yuan for absence without permission.

2. Party C must accept the coordination and management of the general contracting and supervision units, and cooperate with other professional subcontracting construction units to check the relevant dimensions of the cross in the construction drawings.

3. If Party C needs to use scaffolding or temporary warehouse of materials built by the general contractor, it shall put forward the time and requirements in advance, which shall be provided by the general contractor with the consent of the supervision engineer.

4. Within the specified time, if Party C enters the next process without the acceptance of the supervision engineer and Party A and Party B, the supervision engineer and Party A and Party B have the right to inform Party C to rework or take necessary measures for testing. Regardless of whether the results of testing and reinspection meet the design requirements, the cost of reinspection shall be borne by Party C, and the resulting construction period and cost losses shall also be borne by Party C. ..

5. Party C shall obey the supervision engineer's inspection, rewards and punishments for Party A and the general contractor's safety production, civilized construction and the implementation of various rules and regulations of the subcontractors.

6. In the process of construction, Party C shall take measures such as protection, wrapping, covering, sealing and reasonable arrangement of construction sequence to effectively protect finished products and semi-finished products. If Party C's finished products are not well protected, Party C shall repair them free of charge. In case of poor maintenance, the supervision engineer or Party A has the right to entrust others for maintenance, and all responsibilities and expenses arising therefrom shall be borne by Party C. ..

Eight. arbitrate

Any dispute arising from this contract between Party A, Party B and Party C shall be settled through negotiation in principle; If negotiation fails, it shall be submitted to the people's court of the place where the contract is performed for a ruling.

Nine. others

1. For matters not covered in this contract, the three parties may sign a supplementary agreement through consultation.

2. The relevant annexes and supplementary agreements of this contract have the same effect as this contract.

3. This contract is made in sextuplicate, with Party A, Party B and Party C holding two copies respectively, which shall come into effect after being signed and sealed by the three parties.

Party A: (signature and seal)

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ _ _ _ _ _ _

Company address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: (signature and seal)

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ _ _ _ _ _ _

Company address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party C: (signature and seal)

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ _ _ _ _ _ _

Company address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date:

3 renovation contract of Party A's doors and windows:

Party B:

According to the Building Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B have reached an agreement on the installation of aluminum alloy doors and windows and stainless steel doors and windows contracted by Party A. Both parties agree to sign this contract according to the following terms and conditions, and abide by them jointly.

I. Project name:

Second, the project address:

3. Contracting mode: contracting mode of contracting, contracting materials, contracting production, contracting transportation, contracting installation, contracting safety and civilization, contracting construction and contracting completion acceptance. Party B shall be responsible for completing this project within the time limit specified by Party A, subject to the acceptance standard amount of Party A.. ..

Four. The scope and contents of this project include all aluminum alloy doors and windows and stainless steel doors and windows in the construction drawing.

Five, the project unit price:

Aluminum-gold alloy doors and windows 125 yuan /m2, aluminum alloy rolling gate 200 yuan /m2 stainless steel door 400 yuan /m2, Stainless steel protective window 85 yuan /m2 stainless steel protective fence 100 Yuan/a stainless steel protective frame 100 Yuan/a stainless steel gutter frame 100 Yuan/a maintenance part material and salary of glass 100 Yuan /m2 Dismantle the rolling gate 360 yuan/Road and replace the bottom beam of the rolling gate material1m2.

Six, the project payment

After Party B's project is completed and accepted by Party A, Party A shall pay all the project funds to Party B. ..

Seven, material supply

The aluminum alloy and stainless steel materials used in this contract project shall be purchased and supplied by Party B. ..

Eight. Responsibility of both parties

Party A's responsibilities:

1, ensure the provision of construction working face, and timely solve the coordination of cross operation on the construction site.

2. Ensure the power supply to the construction site.

3. Pay the installment payment on time.

Party B's responsibilities:

1. The construction must be carried out in strict accordance with the construction drawing (or negotiation scheme) and current specifications, obey the reasonable suggestions of Party A, and abide by the relevant rules and regulations of the construction site to ensure the engineering quality and safe production. Illegal operation is strictly prohibited.

2. Bring your own construction equipment during the construction.

3. Party B shall not subcontract the scope of work related to the signing of this contract to others.

Both parties have the responsibility and obligation to cooperate closely for civilized construction.

5. During the construction period, Party B shall take full responsibility for related accidents or accidents due to its own reasons and personal unsafe behaviors.

6, safe construction, civilized construction, law-abiding, it is strictly prohibited to party b's workers in the construction site to fight, make trouble, if the circumstances are serious, report to the public security organs.

7. It is forbidden for workers to commit other illegal acts in the construction area, and it is forbidden to use child labor under 18 years old.

8, put an end to all theft, once found that workers have theft, no matter how much to report to the public security organs.

This contract is made in duplicate and shall come into effect as of the date of signature by both parties. After the project is completed and accepted, both parties confirm that it is correct. After Party A pays off the project payment, this contract will automatically become invalid. Matters not covered in this contract can be amicably negotiated by both parties.

Party A:

Date:

Party B:

Date:

4 renovation contract of Party A's doors and windows:

Party B:

According to the Building Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B reach an agreement on the installation of aluminum alloy doors and windows in the construction project of Yuan Jie Home Care Service Demonstration Center contracted by Party A, and agree to sign this contract according to the following terms, which shall be abided by both parties.

I. Project name:

Second, the project address:

3. Contracting method: contracting, manufacturing, installation, mortar joint filling, safe and civilized construction and completion acceptance. Party B is responsible for coordinating the work of aluminum alloy doors and windows supervision and relevant departments, so that the project can pass the acceptance and delivery of relevant departments within the time limit specified by Party A. ..

Four. Scope and content of the project

Including the installation of all aluminum alloy doors and windows, plastic steel doors, folding doors and tempered glass partitions in the construction drawing.

5. Construction period: 20xx to 20xx years.

Party B shall complete the construction task within the time specified by Party A, and ensure that it is synchronized with the progress of the project and will not affect the operation of other types of work.

Six, the project quality:

According to the current national standards, and reached the acceptance level of aluminum alloy doors and windows.

Seven. Contract price:

Unit of valuation of the contract price: RMB. 220 yuan for aluminum alloy doors and windows, 200 yuan for plastic steel doors. The tempered glass partition wall is a lump-sum contract with 250 yuan per square meter (its total area is settled according to the drawing budget). The total price has included production equipment, labor, machinery, building installation and cleaning (including glass), insurance, risks and profits.

Eight, project payment

1. Pay 20% of the total project payment according to the completion of the project installation, 80% of the total project payment after the preliminary acceptance of the project completion, and pay all the remaining project payment within 15 days after the project completion.

2. Party B shall issue a receipt to collect the progress payment of this project.

Nine, material supply

The aluminum alloy materials used in this contract project shall be purchased and supplied by Party A. ..

X. responsibilities of both parties: responsibilities of party a:

1, provide a copy of the construction drawings, ensure the provision of the construction surface, solve the coordination of cross-operation on the construction site in time, and provide on-site commanders and technicians.

2. Assign relevant personnel to be responsible for the technology, intermediate acceptance, installment settlement and audit of each project.

Party B's responsibilities:

1. The construction must be carried out in strict accordance with the construction drawing and current specifications, obey Party A's rationalization proposal, and abide by the relevant rules and regulations of the construction site to ensure the project quality and safety in production. Illegal operation and waste of materials are strictly prohibited. In case of unnecessary losses caused by Party B, Party B shall bear all expenses such as material costs, transportation costs and procurement labor costs.

2. All construction equipment in the process of self-provided aluminum alloy construction has been included in the comprehensive labor price.

3. Party B shall not subcontract the scope of work related to the signing of this contract to others. If the project cannot be completed according to Party A's requirements, Party A has the right to send additional personnel to participate in the construction, and the unit wage shall be deducted from Party B's installment payment according to the requirements of the rush party, and each job shall be no less than 200 yuan.

4. When Party B can't bear the related workload in the construction process or Party A doesn't trust and finds the subcontracted project, Party A has the right to order Party B to leave and recover the paid project funds. If the completed project can meet the project quality acceptance standard, it will be paid at the contract unit price of 80% of the completed workload. If Party A thinks that the contractor can't meet the quality requirements, it will not be resolved, and it will leave the site unconditionally within a reasonable date notified by Party A, and the expenses and responsibilities arising therefrom will be borne by Party B. ..

5. Party B has the responsibility and obligation to cooperate closely with other brothers to carry out civilized construction.

6. During the construction period, Party B shall take full responsibility for related accidents or accidents due to its own reasons and personal unsafe behaviors.

7. All personnel entering the site need to provide ID cards and security cards.

8. Abide by the law, implement the relevant rules and regulations of the company and the construction site, and obey the management of Party A. ..

9, in the living quarters must obey the site living quarters management system, living quarters health cleaning regularly. It is forbidden for Party B's workers to fight in the construction site or living quarters. If it happens, both parties will be fined 500 to 5000 yuan, and if the circumstances are serious, they will be reported to the public security organ for handling.

10. It is forbidden for Party B's workers to pull wires and sockets in the construction site and living quarters without permission. It is forbidden to use the electric stove with the tap on. Fines 200 yuan once, and shall be investigated for economic and legal responsibilities in case of accident.

1 1. It is forbidden for workers to commit other illegal acts in the living area, and it is forbidden to use1child labor under 8 years old.

12, put an end to all theft. Once workers are found to have committed theft, regardless of the number, the party group will be fined more than 5000 yuan. If the circumstances are serious, it will be reported to the public security organ for handling, and all consequences will be borne by the team.

XI。 Others:

(1) For matters not covered in this contract, both parties shall negotiate separately;

(2) The notes, annexes and supplementary agreements of this contract are an integral part of this contract and have the same effect as this contract.

(3) This contract is made in triplicate, two for Party A and one for Party B, and shall come into effect after being signed by the representatives of both parties.

Party A:

Date:

Party B:

Date:

Renovation contract for doors and windows 5 I. Project name:

Second, the project site selection:

Three. Scope and mode of contracting: materials, production and installation contracting.

Four. Construction date: from * * days to * * days. In case of power failure or climatic factors affecting the construction, the construction period can be postponed accordingly.

5. Project price: The project is subject to a fixed unit price of RMB per square meter, with a quantity of square meters and a total cost of about RMB. When the project is handed over, it shall be settled by the actual quantities measured and approved by both parties.

6. Payment method: When Party B enters the site, Party A pays the project payment; After the door and window frames are installed, Party A shall pay the project price; After the project is completed, Party A shall pay the project payment.

Seven, quality requirements:

1, material requirements: profile glass: steel lining:

2. Installation requirements: According to the current national and industrial quality evaluation standards, construction technical acceptance specifications and construction drawing standards provided by Party A. ..

Party A shall inspect and supervise the processing and construction process of Party B's products, and Party B must cooperate.

Eight. Duration warranty: the warranty period of this project is one year, counting from the date when the comprehensive acceptance is qualified and the acceptance certificate is obtained.

Nine. Rights and obligations of Party A:

1. Party A has the right to inspect, approve the project quality and confirm the project quantity.

2. Party A has the right to manage Party B's construction site.

3. Party A has the obligation to provide Party B with construction drawings and timely provide design changes.

4. Party A has the obligation to coordinate the work between Party B and the construction team.

5. Party A has the obligation to provide Party B with electricity and water for construction.

6. Party A has the obligation to confirm and accept the samples and subdivisional work submitted by Party B in time.

X. Rights and obligations of Party B:

1. Party B has the right to demand payment for the project according to the contract.

2. Party B is obliged to carry out the construction on time according to the contents of the contract and relevant standards.

3. Party B has the obligation to undertake the maintenance of on-site materials and finished products after installation and the safe custody of the project, and bear the expenses arising therefrom.

4. Party B has the obligation to carry out maintenance in time during the warranty period and bear the corresponding expenses.

XI。 Engineering change:

1. Party A has the right to replace doors and windows, but it must notify Party B in writing.

2. If Party B suffers economic losses due to Party A's change, the expenses shall be borne by Party A. ..

3. If the construction period is extended due to the design changes provided by Party A, the contract construction period will be postponed accordingly.

Twelve. Breach of contract and disputes:

1. If Party A and Party B fail to implement it according to the schedule agreed in the contract, both parties shall settle it through consultation in time, and the settlement result shall form a written meeting record.

2. If both parties to the dispute fail to negotiate, they may apply to a people's court for a ruling.

This contract is made in duplicate, with the same legal effect, and each party holds one copy.

Party A:

Party B:

Date of signing:

;