Workshop Work Summary 1 I. Quality
As a production workshop, quality is our eternal pursuit! In our work, we strictly control the quality of products, so that the products will be strictly inspected when they are released from the furnace, and will be sent to the quality inspection department for the second screening after the first screening process.
In the production of products, quality is always the first requirement, which has been understood by everyone in the production industry. But this is a meticulous requirement after all. Some new employees missed some problems of the product because of their lack of rigorous work or experience! Therefore, there are various problems in the work.
To this end, leaders will always remind everyone that quality is important! Especially in the production workshop, once there is an error, it is a batch of products that go wrong! If not found in time, it will cause certain losses!
Second, efficiency.
Although quality is the first requirement, after all, we can't treat our work like polishing works of art. In the face of numerous orders, we must rely on personal experience and ability to optimize our work efficiency. At work, especially some experienced old employees, can find problems in time, solve them and report them in time. To this end, we have been committed to experience sharing and innovation, thus improving the overall ability of the team.
Third, management level.
In terms of management, we strengthened the requirements for employees in the first half of the year and introduced the reward system in time. Under this system, employees actively look for problems in their work and report to the monitor in time. This not only let us know all kinds of problems in our work, but also actively promoted the enthusiasm of employees and enhanced their enthusiasm for work.
Fourth, the problems in the first half of the year.
When it comes to work, it is mainly in management. In order to ensure the safety management of the workshop and the health protection of employees, smoking in the workshop is strict! However, during the inspection, many employees still secretly smoked in toilets, computer rooms and other places, and they were repeatedly banned! To this end, the management and punishment system will be strengthened more strictly in the future, and violations will be eliminated in time!
Workshop work summary 2 I. Theoretical training
Hydraulic cylinder belongs to the executive component of hydraulic system, and its operation failure is related to the whole system besides the hydraulic cylinder itself. Therefore, when troubleshooting hydraulic cylinder operation faults, we should carefully observe the fault symptoms, adopt the method of logical reasoning and item-by-item coercion, and carefully analyze the fault causes from the outside to the inside, so as to determine the troubleshooting methods and avoid blind disassembly. Improper installation, use and maintenance are the reasons for the operation failure of hydraulic cylinders. In this paper, the bad action of hydraulic cylinder and common typical operation faults are systematically analyzed.
Second, on-site training.
First, the hydraulic circuit should be depressurized before the hydraulic cylinder is disassembled. Otherwise, when the oil pipe joint connected with the oil cylinder is unscrewed, the high-pressure oil in the circuit will be sprayed out quickly. When the hydraulic circuit releases pressure, loosen the handwheel or pressure regulating screw at the overflow valve, unload the pressure oil, and then cut off the power supply or power source to stop the hydraulic device. Secondly, it is necessary to prevent the piston rod top thread, oil port thread, piston rod surface and inner wall of cylinder liner from being damaged during disassembly. In order to prevent the piston rod and other slender parts from bending or deforming, they should be evenly supported by skids. Finally, the disassembly should be carried out in sequence. Due to the different structures and sizes of various hydraulic cylinders, the disassembly sequence is slightly different. Generally, the oil in the two cavities of the oil cylinder should be drained, then the cylinder head should be removed, and finally the piston and piston rod should be removed. When removing the cylinder head of the hydraulic cylinder, the key or snap ring with internal key connection should use special tools, and a flat shovel is prohibited; Flange end cover must be pushed out with screws, and hammering or hard prying is not allowed. When it is difficult to pull out the piston and piston rod, it should not be forcibly pulled out, and the reason should be found out before disassembly.
Third, ideological trend.
This week, we can face up to our current work, start from bit by bit, accumulate constantly, and train ourselves into outstanding talents who can stand all kinds of tests. In order to maximize their potential in the future and show their talents on the company's platform. At the same time, we believe that the company will give strong support. We will make contributions to the reform, development and stability of enterprises with high-spirited and inexhaustible creativity, and enhance the vitality and sustainable development ability of enterprises.
Workshop Work Summary In March, the projects of the second phase of the gas workshop entered the final sprint stage, and the south-north steel structure of the dry dust removal project was successfully completed, and the cylinder is currently being hoisted; The gas holder booster station is equipped with two boosters; The screw machine in the air compressor station is being installed and debugged, and all the work is in full swing.
10, the gas workshop carried out special safety rectification, special equipment inspection and heatstroke prevention and typhoon prevention, which eliminated all kinds of hidden dangers in time, well controlled all kinds of risks, ensured personal safety and ensured the safe and stable supply of energy media. However, it is worth mentioning that due to the long-term low-temperature production of blast furnace, the water content of ore is high, the dry dust removal box and ash conveying system are seriously blocked, and the bag is seriously dewed. Now, after a week of unpacking and cleaning rotation, the dust box barely maintains production. It is worth noting that the responsibility of regional safety management in some stations has not really been put in place, and the inspection and maintenance of equipment in some stations are not detailed enough, and the equipment maintenance is not timely. These problems show that our basic management and law enforcement need to be strengthened. Especially in this special situation, it is more necessary for every employee, especially the stationmaster, to be highly alert, highly valued and highly responsible. Concentrate on safety in production.
10, the second phase blast furnace system will be put into operation, and the dry dust removal system connected with it will sprint to ensure the smooth production of the blast furnace.
The main work arrangement of workshop in X month is as follows:
1. In the second stage, the new employees will be given corresponding job knowledge training to strengthen their professional knowledge.
2. Debug and install the second-phase arrival equipment.
3. Focus on supervising the construction progress and quality of the second phase of dry dust removal project.
4. Pay special attention to the second phase project, especially the plan approval, construction quality, construction progress and preparation before production of the second phase dry dust removal project. If the construction progress is too slow, it is necessary to supervise the whole process and focus on ensuring the quality of the construction period.
Workshop work summary 4 "Work as the criterion, high standards, strict requirements, complete the work tasks" Last July, I came to the production department of high-speed wire rod factory, and I benefited a lot from the scheduling work for one and a half years. What I see, hear and feel makes my work different. The condition of high-speed wire rod factory is not 65438+the output required by the company at the end of February. However, in the past year, the dispatching group obeyed the command of the company and the factory department, its work instructions, dispatching responsibilities, production organization, participated in the study organized by the company to improve professional knowledge, the company's production policy, set an example to organize production, work inspection and study. And take "safe production, energy saving, self-improvement and high efficiency" as the criterion to ensure the stable and smooth production of the workshop throughout the year.
In the past year, I have made achievements in my work. My own ability is limited and my professional knowledge is weak, which also brings direct or indirect losses to the company and the high-speed wire mill. Every time you miss a phone call and arrange it, there is competition in production, and even unclear recorded data has a negative impact on production. As far as the situation is concerned, I joined the iron and steel enterprise for a short time, with strong management and bold work, which brought inconvenience to my work, the degree of ideological emancipation, the gap with experienced colleagues, innovative work, weak will, poor writing foundation and learning. In order to make our work better and strengthen our image and quality in the future work, I ask myself to set an example, treat others sincerely, know my work and value, and humbly ask my colleagues for professional questions. In the work, all words and deeds are regulated by system and discipline, abide by rules and regulations, respect comrades, unite with comrades, listen to opinions from all sides, and shape a good image of high-speed line dispatching. I will make up for my study and practice, sum up my experience with my conscientious work, try to be familiar with all aspects and professional knowledge of high-speed wire rod, and make suggestions for reference. Hard work, correct attitude, seeking truth from facts, more understanding, more support, more doubts, less arguments, less responsibilities and requirements, so that in the new year, we can be a qualified high-speed line dispatcher and give the production tasks.
Summary of workshop work 5 In a blink of an eye, one year's work is coming to an end. With the help of the team and leaders, through summing up experience and analyzing carefully, we can learn from the problems that arise, exercise our ability in difficulties, improve ourselves in reflection, and finally successfully complete the work throughout the year. In order to better improve my personal ability and make greater progress in my work in the new year, according to the requirements of the leaders, I will summarize my personal work for one year as follows;
1. At the beginning of the year, the production line was in a hurry. In view of the situation that there are few skilled employees and many new employees, we should strengthen the learning ability of new employees and arrange hands-on teaching for old employees, so that new employees can adapt to the operations of this position in a short time.
2. In the middle of this year, in the production process, the shift consumption gradually increased due to the switch of explosive barrels. Employees are required to be busy but not chaotic, tight but not scattered, and do their own team well. At the same time, find out the reasons, strictly check the paper tubes on the machine, and gradually eliminate the paper tubes that are reused many times to reduce the unnecessary consumption caused by paper tubes, thus reducing the probability of tube explosion.
At the end of this year, employees were fighting at work, which led to work-related accidents. Deeply reflect on the imperfection of safety team education, strengthen safety education for employees and stop unreasonable behavior.
4, shortcomings in the work:
Not active enough when dealing with the work that he is not in charge of. The reason is that I am afraid of overstepping my authority and offside, and sometimes I don't take the initiative to put forward my own work ideas, which leads to a slow pace of work. It is not enough to learn new things. I often do things by experience in my work, and I use my previous work routines to deal with problems, which shows that I am not bold enough in my work.
Team management is not meticulous enough, and employees' awareness of safety and quality is not strong enough, leading to safety accidents this year 1. Although the parties were educated and dealt with afterwards, corresponding countermeasures were also made. However, we should give priority to prevention, strengthen education in peacetime, improve employees' awareness of safety and quality, and fundamentally reduce the occurrence of hidden dangers of safety accidents.
Workshop work summary 6 I. Safety learning situation
165438+1After a major safety accident occurred in the operation workshop on October 6, employees were organized to study continuously from August 8 to 22 under the arrangement of the rolling mill 17 days. The main study contents include Notice on Strengthening Safety Work, Lifting Equipment Management System, Lifting Equipment Operation Ticket, Aerial Work Management System, Aerial Work Ticket, Equipment Maintenance Operation Safety Specification, Equipment Maintenance Operation Ticket, Safety Management System for Working in Confined Space, Operation Ticket for Working in Confined Space, Technical Operation Rules for Electrical Safety and Hazards.
Second, the hidden trouble investigation
From the 8th, the hidden dangers were investigated according to the requirements of the factory, and six hidden dangers were found by the * * * meter, all of which have been dealt with.
Third, the implementation of the safety system
The electrician violated the rules this month 1. Same as June 10. Employees can better abide by the company's regulations when wearing labor protection articles, and no one is punished for wearing labor protection articles that do not meet the regulations. On June 6, 65438, when the 7# motor was replaced and overhauled, the pre-established safety measures could be implemented.
Fourth, the direction of next month's efforts
1, continue to strengthen the safety education for employees, especially to implement the system of power failure and listing for temporary maintenance work. Ensure the safety of maintenance.
2. Strengthen the equipment hidden trouble investigation and fill in the hidden trouble investigation and rectification form. On February 28th, 65438, the motor base of the feeding platform was damaged because the anchor bolt of the motor was loose. Although the person in charge on duty has been assessed, it is still necessary to refine the equipment routine inspection from the management, so that the assessment of routine inspection can be well documented. In addition, some teams and groups dealt with the potential safety hazards but did not fill them in, which led to the factory department's incomplete understanding of the following situations. 165438+ 10, teams that fail to fill in the form in time will be assessed.