Current location - Education and Training Encyclopedia - Education and training - Construction commitment letter
Construction commitment letter
In today's social life, we may all use the letter of commitment, and the contents of different letters of commitment are different. Do you know how to write a letter of commitment? The following are nine construction commitments I have carefully arranged, hoping to help you.

Construction Commitment 1 Our company made the following engineering service commitments in the landscape upgrading and greening project of Guiliu Road in Liuzhou City:

1. All the bidding materials provided by us are true and reliable, responding to the basic requirements of the bidding documents and various quotations and terms put forward, and ensuring that the bidding documents are kept strictly confidential, and bidding in the name of others is not used falsely, and there is no collusion, omission or fraud. In case of the above acts, our unit is willing to accept the handling of the Administration Department of the Bureau of Landscape Architecture.

2. Time limit for commitment: 2x65438+00 on May 22nd, 2x65438+June 10. Ensure that the project is completed within 2x calendar days, and the maintenance period is one year.

3. After winning the bid, our company must carefully organize and arrange the construction in strict accordance with Code for Construction and Acceptance of Urban Greening Projects (CJJ/T82-99) to ensure that the greening project quality of Guiliu Road in Liuzhou City reaches the qualified standard.

4. Our unit has sufficient technical strength in maintenance and management, with 4 1 person of college graduates in landscape architecture and related majors, including 5/kloc-0 in landscape architecture. In this tender, 2 landscape engineers, engineer 1 name, 4 assistant engineers, assistant accountants 1 name, 2 water and electricity maintenance workers, 4 technicians and 50 green chemical workers1name are proposed. My unit promises to complete the project on time with good quality and quantity within the construction period to ensure the greening effect.

5. Our total assets are 35.07 million yuan, and we have the ability and sufficient guarantee funds to ensure that the funds are in place during the construction period and submit the bid bond on time.

6. My unit has complete landscaping construction and maintenance machinery with good performance. According to the seasonal characteristics and the growth and development characteristics of various plants, all kinds of machinery can be used reasonably, scientifically maintained, carefully shaped and trimmed in time to create a beautiful and clean street landscape.

7. During the construction period, our unit will ensure the civilized operation and safe construction on the job site. When working high above the ground (such as pruning trees) or spraying pesticides, choose a reasonable time and place eye-catching safety placards at the scene. Operators should strictly implement the safety production system and operating rules to ensure the safety of pedestrians and passing vehicles.

Safe. When machinery and manpower cooperate at the same time, ensure the safety of workers and pedestrians, and avoid mechanical injury or pesticide poisoning.

8. As the project leader of this bid section, earnestly perform their duties.

9. If you are not satisfied with our engineering quality, safety, contract execution and other services, you can directly complain to the competent department of landscape architecture or our unit by telephone or fax.

Tenderee: Liuzhou Garden Construction Engineering Office:

2x10 May 2 1 day

Construction scheme

Construction Commitment 2 Due to xx Project, this unit needs to temporarily occupy and excavate highway sections for construction. In order to ensure civilized highway construction and smooth traffic safety, this unit promises to strictly follow the People's Republic of China (PRC) Highway Law and the Road Traffic Safety Law and other laws and regulations to ensure that the negative impact on road capacity and smooth traffic will be reduced during the construction period. In the process of construction, ensure that it is implemented according to the following requirements:

First, the bright card construction. Hang the highway construction permit at the construction site and publicize the construction unit, project name, warm tips and other information.

Second, enclosure construction. According to the relevant regulations of civilized construction management, standard enclosure facilities should be used for enclosure operation within the construction scope, and relevant safety warning signs should be set. The equipment and articles required for the safety enclosure will enter the site at the same time as the construction team, and the construction can be organized only after the enclosure and safety warning are given to the construction site. After the construction is completed, the enclosure will be cancelled.

Three, construction in strict accordance with the plan, shall not expand the scope of excavation and enclosure. In strict accordance with the approved construction plan, reasonable deployment of human machines and tools, to avoid construction in peak and busy hours, to avoid disturbing people.

Four, the construction site set up obvious traffic signs, set up warning lights at night. For engineering construction that has a great impact on vehicles and pedestrians, in addition to taking measures to ease traffic, special personnel should also be arranged to assist the public security traffic management department to ease traffic. Repair the roads within the construction scope in time to ensure the traffic safety and smoothness within the construction scope. (Pavement cleaning of construction section, maintenance and management of related facilities)

5. Construction materials, machines and tools shall not be placed outside the enclosure, and living facilities unrelated to construction shall not be placed in the temporarily occupied construction site. On the premise of not affecting traffic and pedestrians, temporary facilities such as warehouses and temporary offices should be installed at approved locations, but temporary facilities such as bamboo and wood structures that affect urban landscape should not be installed.

Six, large machinery construction work as far as possible in the evening 10: 30 before, and take effective measures to reduce construction noise and dust.

(Seal) Construction Unit:

(Seal) Person in charge:

Person in charge:

Date, year and month

Construction Commitment 3 In order to ensure the smooth completion of the * * * project, our company makes the following commitments:

I. Quality assurance

1. Construction quality: In order to ensure the construction quality, the relevant provisions of construction quality specifications and standards (including mandatory standards) of construction projects shall be seriously implemented, and technical disclosure shall be made to the construction personnel before construction until each worker is familiar with the operation technology. During the construction, it is required to carry out the construction in strict accordance with the operation technology, and check the construction quality in strict accordance with the "three inspection systems" (self-inspection, handover inspection and professional inspection). Every process is not checked or does not meet the quality requirements.

2. Materials: strictly control the quality of incoming goods, perform material inspection procedures, and use materials with certificates and re-inspection reports.

Second, the time limit for a project guarantee

1, organize reasonable measures:

(1) is uniformly scheduled and managed by the project department.

(2) Timely implement the mobilization, scheduling and management of materials, machinery and labor. Do a good job in process arrangement and prepare the working face in advance.

2, the implementation schedule management:

(1) Arrange weekly plan, issue team and individual quotas and complete engineering quantity indicators, and clarify responsibilities.

(2) The team shall conduct self-inspection on the progress and quality every day, and put forward specific measures to complete the plan. Hold a weekly coordination meeting to coordinate the working procedure and construction progress, and solve the factors that delay the construction period in time.

3. Time commitment: ensure that it is completed on time according to the contract time limit.

Third, safe and civilized construction

The construction team is the person directly responsible for safety, and is equipped with full-time security officers. In addition to complying with the requirements of safety operation procedures, the following points should also be noted:

(A) the construction of electricity safety

(2) Safety measures

1, implement the policy of "safety first, prevention first", and in the whole construction process, we must seriously abide by the construction safety work norms and safety management system, strive to do a good job in safe production and civilized construction, and put an end to the occurrence of vicious accidents.

2. Implement safety regulations.

3. Establish a construction accident insurance system and purchase construction accident insurance for construction personnel according to law.

Sign labor contracts with construction workers according to law, pay workers' wages on time, and never default on the wages of migrant workers.

4. Consciously accept the supervision and inspection of users and their management departments on the quality and safety of construction projects, and timely rectify the problems raised in the inspection.

Fourth, public security management.

1. Hold a public security education meeting once a week, assign a special person to be responsible for public security management, and implement various public security management measures to each team.

2. It is forbidden for all members of the construction team to fight, and it is forbidden for all construction personnel to go beyond the prescribed scope of activities, which will affect the life of on-site management personnel.

3, do not comply with the provisions of the construction site public security management, will be dismissed.

Verb (abbreviation of verb) environmental sanitation

1, the construction site timely sort out the domestic garbage every day, and the living quarters must be kept clean and tidy;

2, site garbage must be cleaned every day to prevent pollution;

3. All garbage must be discarded in the designated place, and it is not allowed to be randomly placed.

4, resolutely implement the construction site clean behavior, to ensure the cleanliness of the construction environment.

Commitment unit (signature):

__________________

Commitment (signature):

___________________________

20xx * * month * * day

If our company is lucky enough to win the bid, we will do our best to complete the construction task. Our company will undertake the project quality warranty responsibility within the quality warranty period according to laws, administrative regulations or relevant national regulations on project quality warranty.

First, the quality warranty period

According to the Regulations on Quality Management of Construction Projects and related regulations, our company agrees that the quality warranty period of this project shall be implemented according to the current national warranty regulations.

The quality warranty period is two years from the date of project completion acceptance.

Second, the quality warranty responsibility

1 belongs to the warranty scope and content, and our company will send someone to guarantee it within 7 days after receiving the warranty notice.

2. In case of emergency repair accident, our company will arrive at the scene of the accident immediately after receiving the accident notice for emergency repair.

3. After the quality warranty is completed, your company will organize the acceptance.

Third, commitment

After the project is completed, our company will establish a return visit system after the project quality and function are used. Our company strictly implements the provisions of the Municipal Construction Committee on warranty maintenance, actively signs warranty contracts with the construction units, issues warranty service cards, and implements three announcements to ensure that customers can reflect the engineering situation to our company in time. Since the acceptance and delivery of the project, we have established the idea that "the customer is God" and provided thoughtful services in strict accordance with the warranty period stipulated by the state.

Six months after the project was submitted for construction, we will pay a return visit for the first time to understand the problems existing in the quality and function of the project, and put them on record, and organize relevant personnel to carry out maintenance treatment as soon as possible until all the decoration is completed. (Student Accommodation Commitment Letter)

One year after the project is submitted for inspection, we will pay a second return visit to learn more about customers' opinions and suggestions on the project, and give a reply in a short time to satisfy customers. Make a record of each return visit, so as to consider the new decoration scheme and solve the existing problems in time.

After the warranty period, we will set up a user hotline in the company to answer users' inquiries in time and enthusiastically, solve users' difficulties and be on call.

Your company can reserve 3% of the project quality warranty money according to the project settlement amount and return it after the warranty period expires. We hereby promise that during the warranty period, if we fail to undertake the warranty obligations in time, you can arrange other construction units to carry out maintenance, and the maintenance expenses incurred will be deducted from the quality guarantee fund, and we will be fined 100% of the warranty amount.

Chapter V of the Commitment on Construction In order to further strengthen the management of safe production and civilized construction of the project, the construction unit and the project department should establish and improve the management systems of safe production, civilized construction, closed transportation of construction waste and bulk building materials, various safety measures, civilized construction measures and construction waste disposal measures, which should be complete and effective. Construction projects should ensure the effective investment of various measures and capital expenditures, and construction supervision should strictly supervise the construction units and earnestly do the following work:

1. A solid, beautiful, environmentally-friendly or landscape-creative closed enclosure (fence) must be set up at the site of the construction area in accordance with the Standard for Safety Inspection of Building Construction (JGJ59-99), and the height shall not be less than1.8m. A neat and strict dense mesh net or safety net must be set outside the building for closed construction.

2. The gatehouse must be set up at the gate, the enterprise logo should be set up at the entrance and exit, and the car washing platform, car washing equipment and garbage sedimentation tank should be set up, so that there is no leakage and pollution in and out of the net car.

3. The main construction roads and yards must be hardened with concrete, hardened with solid materials or afforested. The reserved land and construction waste must be transported in corresponding containers or pipelines, piled up in a centralized way, and covered or regularly sprinkled with water to control dust. It is forbidden to throw objects in the air.

4, it is forbidden to burn all kinds of waste in the construction site.

5, the site must be reasonable arrangement of drainage facilities, drainage to unobstructed, can not have water phenomenon.

6. The site and its surroundings must be kept clean and tidy, and materials should be stacked in an orderly manner.

7, living quarters and construction areas should have obvious isolation measures, dormitory and site canteen settings must meet the specified requirements, and meet the safety conditions and health standards.

8, in order to ensure the construction on time, not on-site mixing concrete, do not produce noise nuisance, noise equipment should be set in the work area to reduce the volume.

9, the construction site environmental maintenance and hygiene standards must be strictly implemented (JJ146-20xx) standards and the Ministry of Health and the Ministry of Construction "Notice on Further Strengthening the Hygienic Management of the Construction Site Canteen" (Wei Jianfa [20xx] No.94).

10, the construction waste generated by the project construction should be declared and disposed of to the residual soil management center of the municipal urban management bureau five days in advance, and the disposal procedures should be handled, and the transportation contract for consumption and cleaning should be signed, and the implementation can be organized only after approval.

1 1. If it violates the above commitments, it is willing to accept the administrative punishment of the competent department.

Article 6 of the Construction Commitment Letter: (Tenderee)

We have carefully read and been familiar with all the contents of the bidding documents of this project, and agree to form a contractual relationship with the tenderer according to the contents of this bidding document and relevant legal forms. We are willing to accept all the contents of this tender document, agree that this document, as an annex to the contract, has the same effect as the text of the contract, and promise that all the information provided is true, legal and effective, and we are willing to bear all the responsibilities if it is untrue.

Once winning the bid, we will sign a contract with the project legal person in accordance with the specific provisions of the bidding documents, strictly fulfill the contractual obligations, deliver the goods on time, and provide high-quality materials and services for the project. In order to clarify our attitude, determination and confidence in bidding for the slope and affiliated greening construction project of Guizhou Guizhou Guitianneng Coking Co., Ltd.' s 6.5438+300,000 tons/year circular economy briquette coking expansion project, we solemnly promise as follows:

I. Quality Commitment

We solemnly promise that the quality of this project meets the requirements of the bidding documents, and the survival rate is 100% (including the survival rate). If there are quality problems in the construction process due to our reasons, we are willing to unconditionally bear all the losses caused to the owner.

Second, the time limit for a project, schedule commitment

We completely obey the arrangement of the owner, and on the basis of ensuring the survival rate of 100% (including survival), meet the progress requirements of the owner and ensure the completion on time.

Three. Commitment to safe and civilized construction

We will obey the management of the owner and supervision unit, abide by the owner's management system of safe and civilized construction, strengthen the management of safe and civilized construction, ensure the safety of construction personnel and equipment, ensure that no casualties occur, meet the requirements of the owner, and bear all legal responsibilities arising therefrom.

Four. If any material and construction quality problems are found during the execution of the contract, we will replace them as soon as possible and bear the corresponding economic responsibilities.

Signature and seal of the bidder's representative:

Chapter VII of the Commitment on Construction is to prevent noise and air pollution on the construction site, protect and improve the environment, guarantee the normal working, studying and living environment of the masses according to law, and promote the construction of a harmonious community and an environment-friendly society, and hereby sign this commitment.

1. In order to ensure the smooth construction of this project and ensure that there is no environmental pollution and dust in our construction responsibility area, we hereby make the following commitments to Party A and competent departments at all levels:

1. During the construction period, we will strictly abide by the laws and regulations on safety production and environmental protection, implement the rules, regulations and technical standards on safety production and environmental protection, abide by Party A's safety and environmental protection management system, and accept Party A's safety and environmental protection supervision, inspection and assessment.

2. During the construction period, six 100% measures, such as enclosure on the construction site, stacking and covering of materials, closing of muck trucks, vehicle washing in and out, ground hardening on the construction site, and wet operation on the demolition site, shall be strictly implemented.

3. Actively cooperate with Party A's construction work, and implement relevant measures to prevent and control environmental pollution such as dust, noise, solid waste and wastewater in the construction organization design of this project.

We will abide by relevant laws, regulations and other requirements, and take effective measures to control noise, dust and air pollution, and protect the working environment and the occupational health of workers and people around us.

5. In order to prevent construction dust, our company will assign special personnel to take charge of dust reduction measures such as cleaning and sprinkling water in the construction responsibility area of our unit according to the site conditions (except for rainy and snowy days and icy weather on the road surface); Under the weather conditions of earthwork construction, dry weather and wind force above level 4, the number of sprinklers should be appropriately increased.

6. The domestic garbage and construction garbage on the construction site shall be classified and stored in a centralized way according to regulations, and shall be removed in time.

7. The strong noise equipment we use in the construction site conforms to the relevant regulations, and noise pollution prevention measures must be taken to minimize noise pollution and reach the noise emission standard of Noise Measurement Method on Construction Site; Construction machinery prone to dust is equipped with dust-proof devices.

Second, the accountability system

Failing to perform their duties as required, which has an impact, shall be dealt with severely by relevant units, relevant responsible persons and other directly responsible personnel; If the case constitutes a crime, it shall be directly transferred to relevant law enforcement departments.

This letter of commitment shall come into effect as of the date of signature by both parties, and will automatically terminate when the cooperation relationship between the two parties terminates; This undertaking is made in duplicate, one for Party A and one for Party B..

Construction unit: Baiyun Primary School, Yongchang Town, Liangzhou District

Signature of person in charge:

Commitment unit: Jinchang Fangzheng Construction and Installation Engineering Co., Ltd.

Signature of the person in charge of the company:

20xx year month day

Letter of Commitment for No.8 Project of Bengbu China Railway Industrial Investment Development Co., Ltd.:

Our company has the honor to undertake the cooperative development project of Binhu New Area on the west bank of Zi Long Lake in Bengbu City. In order to ensure the safe and civilized construction requirements of this project, promote the safe and civilized construction of the construction site, improve the construction environment of the construction site, and ensure the standardized demonstration site of safe and civilized production in Bengbu City, our company now solemnly promises the safe and civilized construction of this project as follows:

1. According to the temporary surface and standards approved by the Employer, control the whole construction process according to the requirements of safe and civilized construction, ensure that the accident rate of young injuries does not exceed 5‰ from the commencement to the completion of the project, put an end to major and above production safety accidents, curb general production safety accidents, and ensure that the standardized demonstration site of safe and civilized production in Bengbu City is obtained.

Second, if a production safety accident occurs due to our reasons, our company will bear the responsibility, which has nothing to do with the employer, and the employer will not bear any responsibility.

Third, strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first, comprehensive management", conscientiously implement the responsibility system for safety production of personnel at all levels, and strive to achieve controllable, controllable and controllable safety production.

Four, establish and improve the safety production guarantee system and supervision system, improve the safety production command system, improve the safety management and assessment system, formulate key requirements and measures to achieve the annual safety production work objectives and follow up.

5. Do a good job in the analysis and pre-control of dangerous points, vigorously carry out standardized operations, scientifically analyze the safety situation at the project site, and find weak links and hidden dangers of accidents.

Take effective preventive measures in time.

Six, to ensure the full investment of the funds needed for safe production, focusing on the extraction and use of the funds needed for anti-accident measures and safety technology labor protection measures, establishing a safety production incentive fund, and ensuring the extraction and use of the funds needed for safety incentives.

Seven, in accordance with the "Regulations on the Administration of Work Safety in Construction Projects" and other laws and regulations and the requirements of relevant industry safety standards, formulate construction plans and preventive measures, effectively protect dangerous parts of the construction site, put an end to illegal command and operation, and ensure that all parts and links of the construction site meet safety requirements.

Eight, organize regular safety work meetings, analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; Organize regular internal safety inspections, and timely organize rectification for problems found by superior units, owners, supervision units and internal inspections.

Nine, regularly organize employees to participate in safety education and training, improve employees' safety awareness, ensure that employees are familiar with the rules and regulations related to safety production and safety operation procedures, and master the safety operation skills of this position.

Ten, formulate emergency plans for major casualties, equipment damage and other safety accidents, establish a systematic, hierarchical, consistent, clear division of labor, coordinated emergency system for safety accidents, and organize their implementation.

Eleven, the investigation and handling of major accidents, strictly implement the principle of "four pass". For major or typical accidents, timely grasp the accident situation, hold a special accident analysis meeting, put forward measures to prevent accidents from happening again and conscientiously implement them.

Twelve, strengthen the construction of enterprise safety culture, closely around the situation of enterprise safety production, carry out ideological and political work, and adopt various vivid and effective forms to educate employees on safety thought, professionalism and discipline, so that employees can establish a firm "safety first" thought.

China railway tianfeng construction engineering co., ltd

Date of 20 10 year

Construction Commitment Letter 9 I. Quality

Quality objective of this project: qualified.

We guarantee that the products provided are all products produced by the enterprises indicated in the bid-winning notice. If it is found that the manufacturer of the products provided by our company is different from the manufacturer indicated in the bid-winning notice, our company will bear all the responsibilities.

Second, the time limit for a project:

The bidding period of this project is 38 calendar days.

Third, the project warranty:

Strictly implement the relevant national standards.

Fourth, safety.

Organize the construction in strict accordance with the current national safety inspection standard (JGJ59-99) and the Measures for the Administration of Work Safety in Hubei Province, so as to prevent the occurrence of major safety accidents, ensure zero industrial accidents and ensure safe production.

According to the safety guarantee measures in the construction organization design, organize the implementation.

Verb (abbreviation of verb) acceptance method

After the project is completed, Party B shall submit it to Party A five days before the project completion acceptance.

A set of completion acceptance report and the following information.

1, increase or decrease design change documents and engineering negotiation records;

2, outsourcing materials and supporting materials certificate;

3, take cover engineering and single project acceptance records and other related information;

4. Party A and Party B shall conduct self-inspection on the project quality table.

Within two days after receiving Party B's completion acceptance report and related materials, Party A shall jointly invite the quality supervision department with Party B for acceptance. If Party A fails to organize the acceptance without justifiable reasons, and can't put forward amendments, Party B may regard the completion acceptance report as Party A's approval, and ask the quality supervision department to accept it on schedule.

If the project has not been accepted by the quality supervision department, Party A uses it in advance or without authorization, and the quality or other problems arising therefrom shall be borne by Party A..

The quality of the completed project should meet the national quality inspection and evaluation standards and the qualified conditions stipulated by the fire department.

If the quality and fire protection of the completed project are unqualified, Party B shall rework and modify it according to the requirements put forward by the indoor quality supervision department and the fire protection management department until it reaches the national indoor decoration quality standard and fire protection standard. And bear the cost of rework and modification.

Cooperation between intransitive verbs and owners and other departments

During the construction period, in the spirit of being responsible for the owner, the company will try to coordinate the relationship with the owner, supervision and other departments, obey the management, cooperate sincerely and strictly abide by the contract. Resolutely do not subcontract or subcontract the project. If professional construction projects are involved and meet the subcontracting conditions, our company will actively cooperate with you after your approval.

Seven. favorable terms

In order to show the company's overall strength, give full play to the company's construction technology level and make due contributions to the development of the construction unit, the company formulates the following preferential terms:

1, project payment method, under the premise of ensuring the smooth progress of the project, fully respect the opinions of the owner.

2. The warranty period of all warranty projects can be extended according to the requirements of the construction unit on the basis of the implementation of national regulations.

Eight. Respond to other relevant clauses proposed in the tender documents.

Once our company wins the bid, we will strictly abide by the main terms of the contract listed in the bidding documents, conscientiously implement the contract law and construction contract, and abide by the contract. According to the current national construction specifications and acceptance standards, carefully organize the construction, complete the construction task within the time limit promised by the bid, ensure the project quality to reach the quality level promised by the bid, and prevent the occurrence of safety accidents. Carry out quality warranty in strict accordance with national regulations. Otherwise, we are willing to bear the responsibility for breach of contract.

Commitment unit: limited liability company