Current location - Education and Training Encyclopedia - Education and training - Comprehensive implementation and answer of Jianghu knowledge contest
Comprehensive implementation and answer of Jianghu knowledge contest
A, clear water;

B, shore green;

C. the river is stable;

D, Jingmei;

Correct answer: ABCD

40, Taihu Lake basin to implement the river length system, the same river and lake set up multi-level river length, the next level of river length to strengthen the river length ().

A. guidance;

B. supervision;

C. evaluation;

D, responsible;

Correct answer: ABC

4 1, comprehensively promote the task of river length system in Taihu Lake basin, mainly including comprehensively strengthening () and other work.

First, water resources protection;

B. Management and protection of waterfront;

C. prevention and control of water pollution;

D, water environment management;

Correct answer: ABCD

42, in order to strengthen the management and protection of water resources in Taihu Lake Basin, comprehensively promote the construction of water-saving society in Taihu Lake Basin, and promote the transformation of () and ().

A. mode of production;

B. economic development model;

C, water use mode;

D, water-saving methods;

Correct answer: BC

43, in order to strengthen the management and protection of water resources in Taihu Lake Basin, establish and improve the regional total water consumption control, Taihu Lake and other key rivers and lakes total water intake control, (), () and (), to save water? Three at once? Equal water saving management system.

First, the planned water management;

B, planned water intake management;

C, water resources demonstration;

D. examination and approval of water intake permit;

Correct answer: ACD

44. Strictly implement regional examination and approval. For areas where the total emission reduction control plan of key water pollutants has not been completed, the administrative boundary section and the control section of major rivers entering Taihu Lake have not reached the phased water quality target, the approval, approval and (), () and () procedures for construction projects that may produce pollution will be suspended in Taihu Lake Basin.

1. Feasibility report;

B, environmental impact assessment;

C, water permit;

D, sewage outlet setting review;

Correct answer: BCD

45. The water source of Xiaoshan Reservoir focuses on solving the drinking water safety problems such as poor water quality in drinking water source areas, and adopts comprehensive control measures such as (), () and () to improve the water quality in storage.

First, the comprehensive improvement of pollution sources;

B. relocation of polluting enterprises;

C, control the scale of livestock and poultry breeding;

D, water ecological restoration and protection;

Correct answer: ACD

46. Focus on the comprehensive management of black and odorous rivers in urban and rural areas, formulate targeted remediation plans for polluted rivers, and () and () take a multi-pronged approach to scientifically remediate urban black and odorous water bodies.

First, source control and pollution interception;

B, diverting water into the river;

C, endogenous pollution control;

D, endogenous pollution control;

Correct answer: AC

47. In order to comprehensively promote the river length system in Taihu Lake basin, it is necessary to speed up the establishment and improvement of the river length system that reflects the characteristics of various places and standardize the operation of the river length system.

First, work supervision;

B, enjoy information * * *;

C. evaluation and accountability;

D, work plan acceptance;

Correct answer: ABCD

48. The Taihu Lake Basin has fully implemented the river length system. The following () is the way to enrich and improve the working mechanism of river length system.

First, innovate the working methods of river captains;

B, strengthen departmental linkage;

Strengthen regional cooperation;

Encourage public participation;

Correct answer: ABCD

48. The Taihu Lake Basin has fully implemented the river length system, and the following () are ways to strengthen supervision and monitoring.

First, establish a supervision and inspection system;

B, strengthen the supervision and management of rivers and lakes;

C, strengthen the supervision and monitoring of rivers and lakes;

Encourage public participation in supervision;

Correct answer: ABC

49. Taihu Lake Basin should fully implement the river length system. In order to strengthen the supervision and management of rivers and lakes, the supervision and management of sewage outlets into rivers and lakes and the examination and approval of sewage outlets (), () and () are strictly enforced.

A, new;

B. reconstruction;

C. illegal construction;

D. expansion;

Correct answer: ABD

50. Taihu Lake Basin should fully implement the river length system. In order to strengthen the supervision and monitoring of rivers and lakes, all sewage outlets above the river basin scale, including those with sewage discharge of () cubic meters/day or () 10,000 cubic meters/year and above, shall be comprehensively monitored, and other sewage outlets shall be supervised and monitored, and the monitoring results shall be notified to relevant departments in time.