Summary of supervision engineer's work
Time flies, and a period of work activities has come to an end. Looking back on my work during this period, I must have gained a lot. Let's write a work summary for this year's work. So, have you mastered the format of work summary? The following is the summary of supervision engineer's work (selected 6 articles), welcome to read and collect.

Summary of Supervision Engineer's Work1March 12, I applied for the job of Changzhou Cheng Zhen Construction Engineering Supervision Company and was assigned to three relatively close construction sites (far from my home) to supervise civil engineering. I have been working for three months now. With the help of company leaders and comrades, I have successfully completed the corresponding supervision tasks in the past three months, which has been recognized and praised by the owners and contractors. During my supervision work, I worked hard and conscientiously, and did not dare to be tired. I work hard and have a good professional ethics and a strong sense of responsibility. Now I will make the following report on my work and supervision experience in the past three months.

I. Work situation

Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,

In the actual supervision work, I require the construction unit to implement total quality management, establish and improve the quality assurance system, and make reports on commencement, construction measures, technical disclosure, positioning review, material and equipment inspection, concealed works, quality inspection, special inspection and completion data.

In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submit relevant documents (copies), understand the general situation of technical force, main building installation experience, etc. , and check the supply of sand, stone, cement, steel and the mixture ratio of concrete and mortar.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.

Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring project of civil engineering, the leveling of beam is a key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once negligence may cause engineering quality accidents, once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take on-site supervision measures, and strictly supervise the construction of various parts, which will affect the construction quality.

Strengthen process control. During the construction supervision of Wujin Jian 'an Construction Team, it was found that there were quality problems in the building material fly ash bricks used by the team. Although the contractor has a laboratory quality inspection report, in the attitude of being responsible to the owner, the batch of bricks are sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality. In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, so as to solve the dispute between the owner and the contractor fairly.

Provide reliable basis. During the supervision of the three construction sites, I actively coordinated the relationship between various units, making them cooperate with each other, support each other, and do a good job of cohesion to ensure the construction quality and progress. Through the above work, I completed the supervision of the workshop office building project of Tian Li Turbocharger Equipment Co., Ltd., the workshop office building project of Changzhou Yamazaki Motorcycle Equipment Co., Ltd. and the civil engineering project of Zhongdi Electric Co., Ltd., and gained a lot in three months' supervision, but there are still some shortcomings. For example, I am an environmental engineering major, and I don't know much about the professional knowledge of civil engineering, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries, so I need to continue to study hard in various disciplines and constantly improve my professional ability and level.

Second, some suggestions.

1. Strictly implement the supervision procedures.

At present, the on-site supervision work is not completely carried out in accordance with the supervision procedures, such as design disclosure, joint review of drawings, first site meeting, introduction of supervision engineers and supervision contents to owners and contractors, formulation of supervision plans and supervision details, etc. , leading to the supervision engineer to the scene after no one cares, do not know the scope of supervision and how to supervise and other practical problems. In order to avoid the recurrence of such problems in the future supervision work, it is necessary to strictly implement the project construction supervision procedures so that the supervision engineer can clearly supervise.

2. Improve the organization of the project supervision department.

Project supervision institutions are fully staffed, with clear responsibilities of chief supervision engineers, professional supervision engineers and supervisors, and complete communication and transportation facilities. Due to the long route and wide area of municipal engineering supervision, only convenient transportation can ensure the inspection and on-site supervision of each construction section, so that there will be no mistakes in the supervision work and the quality of the supervision work will satisfy the owner.

3. Train supervisors to improve the quality of all employees.

Strengthen the training of supervisors, organize employees to seriously study the Supervision Code and Changzhou Local Engineering Construction Supervision Regulations, unify supervision standards, participate in various classes organized by the Municipal Construction Committee and quality supervision stations, master new policies and standards, and lay a good foundation for supervision work. The above is a summary of my supervision work in the past three months. Because of my short working time in the company, some problems may be one-sided, and there are still many shortcomings in my work. Please ask the company leaders and colleagues to make more corrections in their future work.

Third, the internship experience

The intense three-month internship life is over, and I still have a lot of gains in these three months. It is necessary to sum up after the internship. First of all, through more than three months of internship and practice, I have learned a lot of practical knowledge. The so-called practice is the only criterion for testing truth. Through practice, I have closely observed the whole building construction process and learned a lot of applicable and specific construction knowledge, which I seldom contact and pay attention to at school, but it is also very important and basic knowledge. While studying and practicing many specific construction methods in and out of class, I also have a more real and in-depth understanding of many specific construction details and management processes. Construction project is the construction process and achievement of a building product by the production object of a building construction enterprise, which can be the construction of a building project, or the construction of a single project or a unit project. Its main features are: first, the construction task of building projects or single projects or unit projects; Second, the enterprise construction enterprise is the main body of management; Third, the scope of the task is determined by the project contract. Construction project management includes the following aspects:

1. Organization and management of construction projects

2, construction engineering quality management

3, the cost management of construction projects

4. Construction safety production and civilized construction management

To manage a project well, it is necessary to control the specific construction steps from all aspects. The management experience and practices mentioned above are all obtained by combining knowledge learning with construction site work in recent years. College life is tense and full of expectations. In my spare time, I always look forward to packing my bags, staying away from my relatives and friends and teachers, and going my own way. However, when we can finally leave the nest built by our elders and walk on the big stage of social work like a fledgling eagle, we find that the road of life is so bumpy that everyone's success has experienced some storms. During the short three-month internship, I learned a lot. I continued to work hard and study in the society, adjusted my mentality, changed from a passive state when I first started social work to an active state when I started to adapt to society, and continued to devote myself to intense work with a relaxed mood and abundant energy. This internship made me deeply realize that reading is a way to increase my knowledge and broaden my horizons, but it is also an excellent choice to improve my comprehensive quality through more practice, being in the middle of practical things, touching the pulse of society and setting a position for myself.

The school arranged an internship to learn practical knowledge in the big school of society. This is also my first real contact and feeling with society. I am very happy to come to Changzhou Cheng Zhen Supervision Company, and I am honored to meet these masters to take me, give me knowledge and help in my work, let me fully combine theory and practice in practice, and make clear my future development direction. Although I encountered some language obstacles in the early stage of my internship, I made clear my own shortcomings, studied hard, worked hard and actively faced every new opportunity.

Summary of supervision engineer's work 2. This project is xxx, with a length of xxx meters, a width of xxx meters, a building height of xxx meters, a building area of xxxx square meters, a building span of xxx meters (5 spans), a column beam structure of welded composite H-beam, xxx, and torsion shear high-strength bolts are used for node connection; The coating requirements are shot peening on the steel surface to xxx grade, with zinc-rich epoxy paint as the primer, iron oxide mica as the intermediate paint and oxidized rubber as the top coat. The fire protection grade requires that the fire resistance limit of steel beam is 1.5 hours, the fire resistance limit of steel column is 2 hours, and the design fire protection grade is Grade II.

I. General situation of supervision

(1) Organization of Project Supervision Department

According to the Code for Supervision of Construction Projects, combined with the scale, characteristics, nature and objectives of this project and the requirements of the construction unit, our company appointed xxxx as the project director to be fully responsible for the supervision of this project, and equipped with enough on-site supervisors to carry out supervision work on the spot.

(2) Supervision system

According to the requirements of supervision planning, supervision rules and safety supervision rules, under the auspices of the chief supervision engineer, the project department has formulated various rules and regulations such as supervision regular meeting system, supervision post responsibility system, on-site supervision system and file management system. , and posted on the wall, to urge all members to work hard and do their duty for the owner.

1, each major arranges a special person to fill in the supervision diary every day according to the professional construction progress.

2. The professional supervision engineers insist on daily inspection of the construction site and supervise the whole process of key working procedures and important parts.

3. Every Wednesday, the director or the director's representative will organize the on-site regular meeting, summarize the completion of the work plan last week, arrange the work next week, coordinate and solve the contradictions and problems in the work, and focus on solving outstanding key problems.

4. The director or the director's representative shall organize the preparation of monthly supervision report, summarize the supervision situation of each major this month, and report to the owner and the company in time.

5, each professional appoint someone who is responsible for the preparation of supervision information. Designate a special person to manage the engineering documents issued by the company and the owner, as well as the instruction documents issued by the contractor, and form a document receiving and dispatching record for future reference.

6, the project supervision department in the unit project completion acceptance, to conduct a comprehensive supervision of the whole process of supervision work.

(III) Internal management system of the Project Department

1. On the wall of the office of supervision department, there are system boards such as Post Responsibility System for Director and Supervision Engineer, Professional Ethics Code for Supervision Engineer, Quality Control Procedure and Schedule Control Procedure to guide the supervision personnel to work in an orderly manner. A bulletin board should be set up, and a special person should be responsible for including various rules and regulations, address books of engineering-related personnel, various notices and other engineering information into the column.

2. All supervisors of the project department shall wear safety helmets and work clothes with company logo when entering the site.

Second, the working methods and principles of the project supervision department

After the project supervision department enters the construction site, the professional supervision engineers of the project supervision department, headed by the chief supervision engineer, shall, based on the actual situation of the project construction, carry out relevant policies, strictly perform the entrusted supervision contract of the construction project, conscientiously implement relevant technical standards, norms and laws and regulations, take the construction of high-quality projects with reasonable investment and fast speed as the control goal, and take "law-abiding, honesty, fairness and science" as the code of conduct for prior guidance. At the same time, the professional supervision engineers strictly exercise the rights entrusted by the construction supervision contract in their work, strictly supervise according to law with excellent professional knowledge, realistic professionalism, meticulous scientific attitude and fair and honest work style, constantly strengthen the internal organization and management of supervision in their work, and actively explore the total work experience, so that the supervision work truly reflects its scientific and fair nature.

In terms of serving the owner, the supervision department should try its best to meet the requirements of the owner within the supervision scope stipulated in the supervision contract and strive to become the owner's staff and agent. In the management of contractors, the principle of "supervision, help and promotion" is adopted to carry out the work, and at the same time, the contractor is urged to implement total quality management to promote the management level of engineering construction to a new level.

Summary of supervision engineer's work 3 The first half of 20xx is coming to an end. Looking back on the work of 20xx in the first half of the year, there are fruitful joys, difficulties in tackling key problems with colleagues, and disappointments when encountering difficulties. Time flies, unconsciously, the second half of 20xx is coming. The important work in the first half of this year is summarized as follows:

First, the main work content of an individual for one year

In the past six months, I have mainly participated in the closure project in the first phase of xx District, the underground pipeline survey in xx City, the restoration project of three wharf yards in xx City, the displacement observation of the comprehensive building and the measurement of several projects of the company.

Second, perform job responsibilities

In this half year's work, I still carry out all kinds of work with the attitude of learning by doing, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.

In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness.

If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited.

Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and try to do it. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.

In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.

Third, work experience, feelings and shortcomings

Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge.

In this half year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also led to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.

Four. Personal career development opinions and views on the company next year.

Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.

Work summary of supervision engineer. Time always goes by inadvertently, and 20xx will soon be over. Looking back on this year's work, I sincerely thank the company leaders for their concern, trust and support. In one year's work, I worked hard, had a good professional ethics and a strong sense of responsibility, and successfully completed the corresponding supervision tasks. In order to sum up the experience and lessons and better carry out the supervision work next year, the situation is now reported to the leaders as follows:

I. Work situation

Over the past year, we have always adhered to the guiding ideology of "quality first, prevention first, process control and terminal control" in line with the principles of law-abiding, fairness, science and integrity, adhered to professional ethics, maintained the image of supervision, strictly supervised the construction unit and enthusiastically served the owner unit, and achieved the following points in our work:

1, study hard at ordinary times, and control carefully in advance. Carefully review various construction schemes before construction, lead the supervisors of this bid section to be familiar with construction drawings and relevant design specifications, learn relevant specifications and procedures, and require supervisors to master key links, find out difficulties and focus on quality control objectives.

2, in the process of construction, strengthen control. Pay attention to the inspection and acceptance of materials entering the site, and carefully sign the application materials of qualified materials. Materials that fail to pass the appearance acceptance are required to be cleaned up by the construction unit under the supervision of the site supervisor and shall not be used. Strengthen on-site inspection, point out and solve problems in time when they are found, and prevent problems before they happen.

3, after control, strictly implement the acceptance procedures and quality standards.

Second, the shortcomings and suggestions

1. I found that my professional level, professional technical ability and organization and coordination ability need to be further improved. For example, the mastery of some norms is not skilled enough; There are too many verbal instructions to the construction unit and insufficient written instructions.

2. Strengthen the internal training of supervisors, actively participate in the study organized by the company, and strengthen the accumulation of their own theoretical knowledge.

3. Strictly implement the supervision procedures, handle the existing problems in time and report them in time, and further do a good job in drafting, reviewing and signing all kinds of supervision documents.

Three. Work plan and next year's plan

1, be strict with yourself, study hard, constantly update and supplement new knowledge, improve business level and work ability, and better adapt to the complex working environment on the construction site.

2. Arrange work, study and life reasonably, and constantly enrich yourself in the process of work.

3. Further strengthen on-site quality control and resolutely put an end to quality accidents caused by poor supervision.

4, reasonable arrangement, carefully guide the on-site supervision work, do a good job in the ideological work of the supervisors in this bid section, and give them better help and care. Give full play to the subjective initiative, work enthusiasm and creativity of everyone in the whole supervision team, unite and cooperate with one heart and one mind, and do a good job in supervision for 20xx years.

5. Organize the on-site supervision data in time to ensure that the supervision data is true, accurate, complete and timely.

The concern and support of company leaders and comfortable working conditions have given me the motivation to work hard. The warm care and cooperation of my colleagues make me feel comfortable and practical in my work, and the unique corporate culture atmosphere of the company makes me full of confidence in my work. I firmly believe that I can do better in my future work and contribute to the development of the company.

Summary of supervision engineer's work 5 xxx, as the special supervision of this project, is responsible for the supervision of the construction site. Although the working environment is harsh, the living conditions are hard and the working hours are long, I have always been strict with myself in my work and always pay attention to maintaining the company's image. In the process of project supervision, we should follow the principles of fairness, impartiality and independence, strictly supervise enthusiastic service, strictly control quality and persist in seeking truth from facts.

With the support and help of my leaders and colleagues, I studied my business knowledge seriously, worked hard to improve my work level, and successfully completed all the tasks assigned by my leaders. The Mumu project is mainly completed throughout the year. The work in one year is very busy, but it is full of passion, efforts and challenges. The specific summary is as follows:

First, study hard and constantly improve your business ability.

Professional quality is the basis for supervisors to perform their duties. I have a clear understanding of this. In order to improve my business ability, I pay great attention to my usual study and accumulation. As long as I have time, I will read all kinds of professional books related to norms and constantly supplement my professional knowledge. I attach great importance to the accumulation of practical experience and like to delve into the causes and treatment methods of problems in engineering and make records. In contact with the owner and the construction unit, I also pay attention to absorbing other people's experience and learning advanced management methods and construction techniques from others to enrich myself. At work, whenever I encounter problems I don't understand, I will humbly ask my leaders and colleagues for advice. Often discuss with colleagues management methods, management contents, and how to arrange all the work as a whole. With the help of leaders and colleagues, my organization and coordination ability and business management level have made obvious progress.

Second, work hard and successfully complete all tasks.

I am mainly responsible for the mywood project. The total length of the road is 3900.19m, and the total width of the road surface is 40m. When completed, it will become the main road of the city. At work, I am always strict with myself, with serious interpersonal relationship and strict working attitude. Based on the principle of reassuring leaders and owners, I earnestly abide by the professional ethics of supervision and do every job rationally and orderly in accordance with rules and regulations. Patrol, inspection, standing by, witness sampling, sampling and other daily supervision work, can not be careless, strictly control the quality of the project. In the specific contact and coordination work, I always adhere to the principle of "safety first" and do a good job in the supervision of various projects. Put forward the potential safety hazards and safety problems found in the work in time, require rectification, make corresponding treatment according to the actual situation, adhere to the professional standards of "law-abiding, fair, scientific and honest", and strictly control the construction quality according to their own post responsibilities. Go to the construction site on time every day to "stand guard and supervise" and strictly control each working procedure according to the requirements of drawings and specifications. Record the supervision diary in detail every day, and collect and summarize the data account. Problems and hidden dangers encountered in construction should be handled in time, and major problems and problems that cannot be handled should be reported to leaders and relevant departments in time. Find out the reasons and responsible persons for various problems on site, strictly check various quality systems, and promote the steady improvement of quality management level.

Three. Shortcomings in work and work plan for the coming year

Through one year's efforts, although some progress has been made, there are still many shortcomings. Professional knowledge and organization and coordination ability need to be improved. In my future work, I will further strengthen my study and constantly improve my professional and technical level and business ability. I will also communicate with the owners and construction units more actively, strengthen organization and management, and constantly improve work efficiency and quality. The tenet is "forge ahead, keep improving" and maintain the corporate image with quality service.

Four. Advice to the company

It is hoped that the company can appropriately increase the wages and benefits of employees according to the actual situation of the project and the working conditions and working ability of employees, so as to improve their work enthusiasm.

Supervision engineer's work summary for 6-20xx years, under the correct leadership of the company, closely around the company's overall work ideas and priorities, constantly improve the level of engineering supervision, and put an end to major safety accidents. Taking the company's quality goal as the work goal, and in line with the enterprise spirit of strict supervision, enthusiastic service, law-abiding, fairness and scientific integrity, I have basically achieved this year's work goal through one year's efforts. As a member of the supervision company, we will report our work and study this year to the leaders as follows:

I. Summary of field work

1. Master the engineering design drawings in the process of the project, find out the difficulties in quality control, determine the control objectives, and consult the construction specifications and quality inspection standards of various disciplines in this project to meet the needs of this project. Review the qualification and scheme of professional construction units entering the site.

2. Pay attention to the inspection and acceptance of materials and components in the site, and require the construction unit to attach the factory certificate to the materials in the site, and report to the supervision department in time for appearance inspection and quality certificate review of the materials in the site, and sign the materials for approval. The contractor is required to immediately remove unqualified materials from the site and shall not use them. At the same time, in the process of supervision, the materials used are tracked and supervised to prevent the contractor from shoddy and stealing the column when using materials.

3. Conduct on-site supervision on concealed works and key parts, and require supervisors to make on-site supervision records. Strict requirements are put forward for the construction inspection procedures of contractors' sub-items, so as to avoid the disconnection between engineering entities and data and ensure the synchronization of construction progress and data. For the quality, safety and progress problems existing in the construction process, first communicate orally, then ask in writing and follow up, and finally hold a special meeting to solve them. Organize special meetings on professional quality, safety and progress, and coordinate relevant personnel on site to conduct safety inspection on the construction site every week.

4. Work closely with the construction unit, review the construction progress plan prepared by the construction unit in advance, and put forward opinions on the unreasonable process arrangement of the construction unit after consulting with the owner and obtaining the consent, and ask it to make reasonable adjustments to make the progress plan meet the actual engineering needs. Before the construction of each type of work, it must be carried out in the example room, and it can be carried out on a large scale only after the supervision department and the owner check and accept it and form a written record at the same time. In the process of construction, the quantity of each single project should be completed quite well, and each project should be reported to the owner for confirmation in time.

Second, the shortcomings and suggestions

1. In the process of work, I found that my professional level, professional skills and knowledge are limited. For example, the boundary between some details acceptance specifications and mandatory provisions is not clear; At work, there are many verbal instructions to the construction unit; Inadequate communication with the construction party leads to passive supervision. In the future work, the control of the project schedule should also proceed from the implementation situation to avoid the disconnection between the schedule and the entity. At the same time, we should strengthen the study and accumulation of our own professional knowledge of safety production management to meet the needs of safety production.

2. It is suggested that the company can organize more experienced professionals to train our supervisors at an appropriate time to improve their professional level.

Third, the next work plan and experience

As a supervision engineer, I haven't been an engineer for a long time, and there are still many shortcomings in my work. In the future, I will be more strict with myself, study my business hard, constantly update and supplement new knowledge, improve my business level and work ability, sum up my experience and better complete the supervision work.