Current location - Education and Training Encyclopedia - Education and training - Minutes of monthly safety production meeting
Minutes of monthly safety production meeting
Model essay on monthly safety production meeting minutes (5 general comments)

In normal study, work and life, meeting minutes play an increasingly important role in dealing with affairs. The minutes of the meeting truthfully reflect the contents of the meeting. Without the actual meeting, it can't be recreated, otherwise it will lose its objectivity and authenticity. Do you know how to write meeting minutes? The following is a sample essay (generally 5 articles) of the monthly safety production meeting minutes compiled by me, which is for reference only and I hope it will help you.

Minutes of monthly safety production meeting 1 meeting time: xxx

Meeting place: xxx

Conference theme: xxx

Moderator: xxx

Participant: xxx

Minutes of meeting: The group company held a regular meeting on production safety on June 5438+065438+ 10. The meeting arranged for the safety officers of four projects to exchange experiences on the daily work of safety officers. The experience summary of the four safety officers has positive reference significance for the safety officers of each project to carry out their work better. It is hoped that all divisions can learn from it, train more excellent safety officers and lay a solid foundation for the company's safety production. At the same time, all grass-roots units reported the recent safety production situation, the fourth division focused on the HowNet project, the sixth division focused on the Yujing Huafu project, and the seventh division focused on the hazard identification and control of Yangquan Avenue Phase II project and Sanquan affordable housing project. The safety management department reported the work in June 5438+ 10, and arranged the safety work in June 5438+065438+ 10. The minutes of specific contents of the meeting are as follows:

1. President Zhao Bin emphasized the following points:

1. Communication of relevant leaders and meeting spirit.

2. The safety management organization of the Division should work closely around the safety management responsibilities of the Division, have absolute control over subordinate projects, and take timely measures for projects that do not cooperate with management and rectification.

3. Each division shall define the safety management responsibilities of each management layer of the division, regularly assess the safety management of the project, gradually summarize and improve the key points of the project safety performance assessment of the division, and strive to make breakthrough progress in a short time.

4. All divisions should plan and arrange annual safety education and training as soon as possible, learn from the assessment methods of engineering and technical personnel, study and assess the safety knowledge of all employees, strengthen everyone's safety awareness and popularize safety knowledge.

Secondly, Yan Xinjian, secretary of the municipal party committee, emphasized the following points:

1. The chief executive in charge of safety management of the Division should personally take charge of it, and at the same time pay attention to the construction of the leading group of the Division.

2. Promote a production and operation organization, the core organization of a company. We lack the spirit of striving for Excellence and pursuing Excellence, and we have no serious attitude. I sincerely hope that everyone can make things clear.

3. Safety management is embodied in two aspects: one is basic management, and the other is risk management.

3. General Manager Bo Wenjiang emphasized the following points:

(1) emphasizes basic safety management. Our most basic work is the foundation. Only by doing the most basic work well can we use the more advanced management derived from basic management.

(2), immediately into the negative temperature production, do a good job in this year's winter engineering statistics, the project to do a good job in preparation for the winter survey and winter construction, do a good job in winter construction safety disclosure. 00 at the same time, the company's production safety system organizes the winter inspection.

4. Zhang Yaofeng, deputy general manager of safety, emphasized the following points:

(1) All business divisions must conscientiously implement the relevant deployment and arrangement of the Safety Management Department of the Group Company, and earnestly and rigorously implement all the work.

(2) Re-emphasize the prevention and control of fire accidents, and hope that all divisions attach great importance to the investigation and management of fire hazards and take practical measures to resolutely curb the occurrence of fire accidents.

(3) All departments should provide in-depth guidance on the safety management of their own projects, especially how security personnel can better carry out their work, and supervise the project to hold regular meetings.

(4) Each division should pay attention to the effect and quality of holding monthly safety meetings, and make clear the meeting topics.

(V) All divisions should actively feedback the problems and deficiencies existing in the safety management of the group company at the meeting, put forward mature experiences and practices, and improve and perfect the safety management.

Verb (abbreviation of verb) Zhao Xufeng, Minister of Safety Management Department, mainly reported as follows:

(a), 10 test.

On June+10, 5438, the safety management department conducted a safety inspection of the 18 project, and issued a rectification notice of 14 and three re-inspection records. The focus of this month's inspection is the assessment of safety objectives and responsibility system, as well as small and medium-sized machinery. The problems existing in the inspection are as follows:

1, the project did not sign a safety target responsibility letter with each worker, and the safety target assessment record was not timely; Some equipment of small and medium-sized machinery has no safety protection shed, some equipment has not been connected to the protective zero line, and the safety disclosure of mechanical operators is not timely.

2. There are many problems in the project site with tight construction period, such as the floor is near the edge, the stairs are not protected in time, the hole is not covered, there is no safe passage for people to enter and exit, the external scaffolding is not high enough, the materials on site are piled up at will, and the mechanical equipment works in spite of illness. All divisions should pay special attention to projects with unreasonable construction period, intensify inspection, and find and eliminate potential safety hazards in time.

3. Recently, the temperature has dropped, and the use of electric mattress, iodine tungsten lamp and electric heating rod has increased. The department should focus on the inspection of winter construction projects to prevent the above items from being used for heating and properly solve the heating problem.

4. Safety information: the format of safety technical disclosure is not uniform, and the disclosure is not carried out according to parts and items, the data record of temporary electricity consumption is lagging behind, the certificates of special operators are not inspected annually or expired, the on-site handover record of the project manager is lagging behind, and the content of safety education is not targeted.

5. There are still many common safety hazards: the safety net is not tightly bound, the number of external scaffolding walls is not enough, the protective zero line of the switch box is not properly connected, the materials on site are piled up at will without fire extinguishers, the workers on site trample on the square wood at will, the wires and cables are dragged at will without protection, the elevator landing door is not closed properly, the workers on site wear safety helmets as the external unit logo, and the distribution box is used as the external unit logo on site. The above problems have been repeatedly corrected and committed, and the project should reflect on these problems, strengthen on-site safety control and reduce the occurrence of on-site safety hazards. The Division shall strengthen the management of on-site safety details, find these problems in time and supervise the rectification at the on-site side station, so as to avoid being used to or turning a blind eye to potential safety hazards.

(2), accident notification

Circular of the Ministry of Housing and Urban-Rural Development on the production safety accidents of municipal housing projects in the first three quarters of 20xx: In the first three quarters of 20xx, there were 492 production safety accidents of municipal housing projects, with 570 deaths, an increase of 148 and deaths 139, up by 43.02% and 32.25% respectively.

Major and above accidents: in the first three quarters of 20xx, there were 2 1 major accidents in municipal engineering production safety in China, with 76 deaths, 5 more than the same period of last year, and the number of deaths increased by 1 1 person, up by 3 1.25% and1respectively. 20036.0000000003

Accident types: The production safety accidents of housing municipal engineering in the first three quarters of 20xx years were classified by types, with 257 falling accidents, accounting for 52.24% of the total; There were 75 accidents caused by objects, accounting for15.24% of the total; 4 1 lifting accidents, accounting for 8.33% of the total; 50 collapse accidents, accounting for10.16% of the total; There were 69 other accidents such as mechanical injury, electric shock and vehicle injury, accounting for 14.02% of the total.

Overview: In the first three quarters of 20xx, the number of accidents and deaths in 10 area decreased year-on-year, and no accidents occurred in two areas. The current situation of production safety is still grim. First, the number of production safety accidents and deaths showed an upward trend compared with the same period last year. Second, the number of accidents and deaths in some areas increased significantly year-on-year. Third, the number of major accidents and deaths has increased compared with the same period last year. Especially since July, major accidents have occurred frequently, with 14 major accidents and 52 deaths in three months, up by 133% and 108% respectively.

The Ministry of Housing and Urban-Rural Development requires deployment in accordance with the 20xx special rectification work plan for building construction safety, urges all parties to strictly implement the main responsibility of production safety, strengthens the safety management on the construction site, and carries out in-depth investigation and management activities of potential safety hazards focusing on construction cranes, deep foundation pits and tall formwork support. It is necessary to vigorously promote the education and guidance of safety production on the construction site, improve employees' awareness of safety production and safety protection skills, effectively control and prevent production safety accidents, and further promote the steady improvement of the national construction safety production situation.

(3), 1 1 work schedule

1, winter construction projects should take reliable measures, increase safety investment, and fully guarantee safety in production. During the winter break, the work of safety production cannot be relaxed and neglected, and the competent department of the Division shall inspect the project according to the normal construction rhythm to ensure that all projects are under control.

2.6 165438+ 10, five projects, namely, the second phase project of Shanxi Medical University, the renovation project of Longtian Village, the Energy College, the Teachers College and the Xinzhou Healthy Community Project, will be completed and accepted at the provincial construction safety standardization site, involving the first division and the general contracting company. Ministerial safety management departments should attach great importance to this work, unswervingly complete the arrangement and deployment of the group company on time, and ensure the realization of the annual target.

During 3.6.5438+10, the group company organized electricians and elevator drivers for training and assessment, and all divisions should continue to actively organize special types of work to register and collect evidence during the winter vacation.

4. During the month of165438+10, the inspection of the safety management department focused on lifting equipment and fire safety.

Minutes of Monthly Safety Work Meeting 2 Agenda: Safety Work Meeting

Meeting time: xx year x month x day

Meeting contents:

A, electrical facilities installation regulations

The meeting stipulated the installation requirements of electrical facilities: in the future, all units must install electrical equipment and facilities according to the requirements of safety production standardization and unify the standards. For example, the equipment installation personnel should design and install according to the requirements of three-phase five-wire system, the front end of the socket of manual (mobile) tools should be equipped with leakage protection, and the power supply facilities such as socket board and control box should ensure that the PE line (zero line) is in place.

II. Work Arrangement of 20xx Annual Safety and Environmental Assessment

Combined with the actual situation of the Group, the annual safety and environmental assessment of 20xx has been adjusted on the basis of 20xx:

1. The assessment time is adjusted to: 20xx65438+1October1-20xx September 30th;

2. The company's major personal injury accident (referring to medical expenses) is adjusted to10.5 million yuan;

3. The total amount of safety EIA is adjusted to 654.38+10,000 yuan;

4.20xx annual safety and environmental accidents exceed the annual assessment indicators, and the penalty amount is adjusted to 50% of the excess (30% in 20xx);

Three. Other work notices

1.20xx annual safety production innovation declaration, if each unit meets the reward clauses in the safety production reward and punishment management system, it shall submit written materials to the safety supervision department of the logistics support center before 65438+February 10.

2. Each unit must complete the signing of the responsibility letter between the department and the security team at the end of 65438+February. The format of the responsibility book requires standardization, and the contents of the terms can be adjusted according to the actual situation of the unit on the basis of last year.

3. "Safety Management System" 3.3. 1 When employees go out during work, they must hold the leave application form or tolerance approval form approved by the superior supervisor of their unit for the record in the gatehouse. 3.3.2 Employees who take the shuttle bus to the north and south factories shall be supervised by the shuttle bus driver. If it is found that the bus driver gets off the bus halfway to do private affairs, he should give feedback to the safety supervision department of the logistics support center and notify the relevant units after investigation and verification. Starting from 65438+February 1, all guard rooms will be strictly implemented according to the system, and all units are requested to do relevant work.

Four, the next step to remind the safety work.

1. Through the standardization construction of safety production, the basic management data of each unit has been basically improved. Next, all units should rectify the existing problems in time, and the future work should be carried out in strict accordance with the standardization requirements.

2. Before the equipment installation and layout, all units should set out from the long-term development direction and arrange the equipment scientifically and reasonably according to the requirements of safety production standardization to avoid repeated rework.

3. Strengthen the safety production management of special equipment, and relevant responsible departments shall conduct safety inspection according to regulations and make records. For the equipment that needs inspection and testing, the responsible department must test it according to the regulations. Boilers, pressure vessels, lifting machinery, elevators, pressure gauges, safety valves, etc. Must be used during inspection.

4. Strengthen the safety production management of special operations personnel, and unlicensed personnel shall not work at their posts; The operation of certified personnel must be standardized and standard, and no illegal operation is allowed.

5. Strengthen the safety management of hazardous chemicals: users should designate special personnel and set posts, and they must be stored as required to strengthen the safety control during use.

6. In addition to the infrared protection of punching machines, units that can install protective nets on small punching machines should implement them in time.

Minutes of Monthly Safety Work Meeting 3 20xx On the morning of March 26th, the Center held a 20xx safety work meeting. Yao Huazhou, deputy director of the center and deputy head of the safety production leading group, presided over the meeting, and Li Jinfa, director of the center and leader of the safety production leading group, attended the meeting and delivered a speech. The meeting heard the summary of the center's 20xx annual safety work, and studied and deployed the 20xx annual safety work. The minutes of the meeting are as follows:

1. The meeting heard the report on the work safety of the Center in 20xx. In 20xx, the safety form of the center is good, and the work of safety production has achieved remarkable results, which has effectively guaranteed the completion of various tasks of the center. At the meeting, the results of the 20xx annual safety production assessment were reported, all of which passed the assessment, and eight departments (units) won the title of "Advanced Collective of Safety Production".

Second, the meeting once again emphasized the importance of safe production, made arrangements for the work of safe production in 20xx, and put forward clear requirements:

1. We should attach great importance to the work of safety in production and always take safety in production as the top priority to ensure safety. All cadres and workers should further raise their awareness of safety in production, firmly establish the idea of "safety first, prevention first" and implement the work of safety in production.

2. Further strengthen the construction of safety production management system.

(1) Improve the safety production management network and organization. From the leading group for production safety, leaders in charge, department heads and safety officers to specific responsible persons (teams and groups), the responsibilities are clear. Safety responsibility books at all levels are signed in place.

(2) Improve the system construction. Further revise and improve the safety management system and formulate the management system related to special posts; Establish and improve the safety assessment mechanism. Don't leave blind spots or dead ends.

(3) Continue to strengthen the publicity, education and training of production safety.

3. Strengthen the construction of safety production supervision system. Strengthen production safety inspection and hidden dangers rectification, conduct regular inspections and spot checks on key parts, institutionalize and standardize vehicle maintenance, strengthen inspection of on-site workplaces and experimental testing equipment, timely rectify hidden dangers, and conduct follow-up inspections.

4. Grasp the key directions and key links.

(1) Focus on the safety of field geological survey and implement field safety guarantee measures. First, before the on-site construction, the safety officer should go to the site to check whether the construction is standardized and whether the safety warning signs on the construction site are clear, so as to ensure the safety of personnel and equipment. Second, the selection of camp, operation route and geographical environment of field operation site should comply with relevant regulations. The third is to do a good job in safe production in flood season. Fourth, protective drugs must be carried in summer field work.

(2) Strengthen the safety production of overseas geological survey and strictly abide by foreign affairs discipline and relevant regulations.

(3) Strengthen vehicle and traffic safety management. Hold driver safety meetings regularly or irregularly, strictly implement the quarterly vehicle inspection system, and do a good job in vehicle maintenance and repair before and after driving. To strengthen the driver's safety learning and training, drivers must do a good job of "three diligence" in vehicles, do not drive faulty vehicles, and it is strictly forbidden to drive after drinking and fatigue. Resolutely implement the regulations of the bureau and the center on field traffic safety. When renting a vehicle in a foreign country, a lease contract must be signed with a unit with legal personality. It is forbidden to rent vehicles without legal representative units and maintenance reports, especially manned vehicles, to prevent traffic accidents.

(4) Strengthen the safety management of fire prevention, anti-theft, anti-virus and inflammable and explosive articles.

(5) Do a good job in the second batch of relocation of the center. In view of the relocation of a large number of instruments and equipment in the experimental testing room, it is necessary to make careful arrangements and formulate detailed relocation plans to ensure safety.

(6) Continue to strengthen the construction safety of bases in Wuhan and Yichang. Strengthen contact with local safety management departments.

Minutes of Monthly Safety Production Meeting 4 Name of Meeting: Special Meeting on Safety Production

Number of participants:

Actual number:

Moderator:

Location:

Time:

First, conscientiously implement the safety production policy of "safety first, prevention first", further improve the management level of safety production in our village, and make the safety production work continue to be carried out in a planned and step-by-step manner.

The second is to strengthen the management of gas stations and liquefied gas, and strengthen the education of students' safety knowledge such as road traffic, diet and fire prevention.

Three, seriously carry out safety inspection, check the number of enterprises not less than five times a year, to achieve the village safety of more than half of the enterprises under its jurisdiction, and actively cooperate with the safety inspection of departments at all levels.

Four, strengthen the management of production safety, establish and improve the responsibility system for production safety, further decompose the responsibility, clear responsibility, prevent and reduce the occurrence of production safety accidents in our village.

Fifth, strengthen the publicity of safety knowledge for students, preschool children and parents to prevent children and students from playing in the flow and traffic safety hazards.

Recorder:

20xx year x month x day

Minutes of monthly safety production meeting 5 Meeting time: xx year xx month XX day.

Meeting place: conference room of project department

Participants:

Construction unit: xxx, xxx, xxx, xxx.

Subcontractor: all employees of xxxx Labor Service Co., Ltd.

Moderator: xxx

Recorder: xxx

Meeting contents:

Guided by the "Implementation Plan of the Safety Committee of xx Economic and Technological Development Zone on Printing and Distributing the Special Action of Law Enforcement and Rectification of Safety Production in Langfang Development Zone", our unit held a special meeting to carry out the special action of safety production rectification according to the actual situation of our unit.

Work objective: With the goal of effectively controlling the hidden dangers of major accidents, putting an end to serious accidents, avoiding fatal accidents and minimizing serious injuries and accidents below, we will carry out in-depth special rectification actions, effectively solve the outstanding problems and hidden dangers existing in our unit's safety production, and ensure the continuous and stable safety production of this project.

First, the rectification content:

1. In terms of labor and employment, strengthen the management of labor and employment in this unit, standardize the employment behavior, protect the legitimate rights and interests of workers and employers, implement the fingerprint punching system, ensure the unified management of the attendance data of workers in this unit, carefully register and verify the salary table and attendance table, and put an end to malicious salary-seeking incidents.

2, safety education, real-time detailed safety education for migrant workers in this unit, improve the safety education and training files, record the education and training assessment, so that migrant workers have a good sense of safety.

3. In terms of construction site management, materials should be packed neatly, and it is forbidden to pile them up at will to prevent materials from encroaching on fire exits, and construction personnel are forbidden to walk around the construction site at will.

4. In terms of using fire and electricity, establish a hot work approval system, equip the construction site and migrant workers' dormitory with fire-fighting equipment, and prohibit private wiring; Establish a separate compartment for storing liquefied gas in the kitchen to maintain ventilation; Dangerous goods such as oxygen and acetylene should be placed separately according to regulations.

5, the use of safety protection facilities and personal labor protection articles, the standard setting of "four" and "five borders"; Set up a safety net as required, and equip and maintain fire fighting equipment in real time; Workers are prohibited from going to work without helmets; Safety belts and personal labor protection articles. Smoking is prohibited on site.

6. Illegal operation is strictly prohibited. Electricians, welders, scaffolders and other special operators should hold relevant certificates and strengthen safety education.

Two, the establishment of special rectification of production safety special action organization:

The management personnel of subcontractors led by the general contractor shall check and implement the above contents item by item, and make improvements item by item to ensure that there are no safety problems and hidden dangers, and ensure the safety production form of this project is stable.

(Blank below)

Construction unit:

Signature of participants:

Signature of participants:

China xx Construction Development Company

Xxxx elevator test tower engineering projects department

Xxxx,xxxx,xx,xx

;