Pre-construction stage
In the early stage of construction, it is necessary to conduct on-site investigation and carry out necessary demolition and reconstruction, including wall demolition and wall building. At the same time, it is necessary to excavate trunking, carry out hydropower transformation and completion acceptance, seal trunking, carry out hidden hydropower transformation project and carry out waterproof project at the same time. Toilet and kitchen floors need to be tested with water closed for 24 hours. Finally, I began to paste the wall tiles in the bathroom and kitchen.
Basic treatment stage
In the primary treatment stage, it is necessary to hang the ceiling and plaster the corner line, cover the door cover and window cover, and at the same time make a good wooden cabinet framework. At the same time, all kinds of wooden doors, modeling doors, flat pressing doors, wooden boards should be painted with dust-proof paint (clear oil), marble countertops on windowsills should be leveled and laid, wooden decorative boards should be pasted, fine wiring should be done, wall foundation should be treated, polished and leveled, and furniture and doors and windows should be glued (edge protection).
Detail processing stage
In the detail treatment stage, the wall should be painted at least three times, and the site should be brushed, the nail holes should be patched, and the paint should be painted. At the same time, we should deal with the corners, lay floor tiles, solid wood or composite wood floors, waterproof marble strips, skirting lines, etc. In addition, it is necessary to install and debug lamps, switches, sockets, sanitary ware, handles and door locks, clean up the site and repair the joints of floor tiles. Finally, the interior of the decoration company is initially accepted, and the three parties make an appointment for formal acceptance and deliver it to the owner.