(1) construction contract: 1. Civil construction contract (including bill of quantities approved by both parties); 2. Other contracts and supplementary agreements. (2) Construction permit: 1, commencement report and supervision application form; 2. Construction permit; 3 construction enterprise qualification certificate (or Zhangzhou construction enterprise registration certificate); 4, engineering construction personnel list and post card, the project department seal letter of activation. (3) Engineering drawing change record: 1, unit engineering drawing change record and completion acceptance checklist; 2, drawings self-examination, came minutes; 3. Design change notice; 4, engineering negotiation records (notice, visa, agreement) and summary table. (4) Construction site preparation: 1, control network setting data (site control point setting or encryption); 2, engineering positioning measurement, pay-off records; 3. Measurement data of foundation trench excavation line; 4, the construction site quality management inspection records; 5, technical disclosure, safety disclosure, construction organization design. (5) Records of foundation treatment: 1, records of foundation drilling and borehole layout; 2. Inspection records of the base tank; 3. Records of foundation treatment (cast-in-place pile or reinforced pile); 4, pile foundation construction data (independent pile foundation construction data can be submitted separately). (6) Construction test record: 1, test report and foundation compaction coefficient summary table; 2, mortar (block) mixture ratio, compressive strength test report, evaluation form, summary table; 3, concrete (block) mixture ratio, compressive strength test report, evaluation form (standard) (rebound data filed together), summary table; 4, concrete permeability test report, summary table; 5, reinforced joint (welding) test report, summary table; 6. Other construction test records. (7) Quality certificates of construction raw materials and inspection report on arrival (all quality certificates of materials related to this project shall be collected and filed): 1, quantity list, registration form and summary table; 2, material supervision to submit for approval table 3, quality certificate, inspection report 4, other records. Note: All material quality certification documents and materials shall enter the site at the same time and be submitted to the supervisor for approval. Steel, cement (self-purchased), brick, block, sand, stone (self-purchased), admixture (self-purchased), waterproof material, thermal insulation material, decorative coatings and external wall putty, anticorrosive material (paint), decorative brick material and other materials. (8) Quality certificate of prefabricated components: prefabricated components (prefabricated reinforced concrete, steel structure, grid structure, partition board, doors, windows, curtain walls and other components); Ready-mixed concrete certificate (opening appraisal certificate shall be submitted together). (9) Inspection record of concealed works 1, foundation and main structure reinforcement works; 2, steel structure engineering; 3, waterproof engineering; 4, other projects (masonry, ground, doors and windows, walls, details, thermal insulation engineering, etc. ). (10) Construction record: 1, engineering positioning measurement inspection record (axis and elevation measurement setting-out acceptance record); 2, on-site construction prestress records; 3, new building materials, new technology construction records, construction scheme (method); 4, concrete construction records. (1 1) inspection and sampling data of foundation and main structure: 1, foundation inspection and pile foundation inspection (pile foundation construction shall be submitted separately); 2. Inspection of concrete structure: inspection records of specimen maintenance and removal under the same conditions, thickness of reinforced protective layer and other inspection records without damage or local damage; 3, steel structure quality inspection records (material approach, welding, fastener connection, installation and painting). (12) Engineering quality inspection record: 1, acceptance record of foundation and main works (structural acceptance); 2, division (a branch) engineering quality acceptance records. (13) engineering quality accident handling record: engineering quality and safety accident report, notice, investigation and handling data (including quality defects and safety problems handling). (14) construction diary: construction diary (including civil engineering, water and electricity, quality and safety, etc. , according to the unit engineering records). (15) Safety and function inspection data (including function spot check records): 1, water storage test inspection records of waterproof engineering (roof, basement and ground); 2, building verticality, elevation, total height measurement records; 3, flue, smoke (wind) inspection records; 4. Physical performance test report of curtain wall and external window; (Three characteristics of external window, four characteristics of curtain wall and pull-out test of rear embedded parts); 5, settlement observation records; 6. Inspection report on the bonding strength of ceramic tiles.