Solar energy engineering installation contract
With the general improvement of people's legal awareness, the frequency of using contracts is on the rise, and signing contracts is an important measure to reduce and prevent disputes. So what should we pay attention to when concluding a contract? The following is the installation contract of solar energy project that I helped you sort out, I hope it will help you.

Solar Energy Engineering Installation Contract 1 (hereinafter referred to as "Party A")

(hereinafter referred to as "Party B")

After Party A's examination of Party B's contracting qualification, Party A agrees to subcontract the installation of street lamps at the 26-meter entrance of the construction project of Chuanqian Industrial Port in Qiandong New City to Party B for completion. Now, in order to clarify the rights and obligations of Party A and Party B in this project, facilitate their cooperation, and ensure the progress of quality assurance to complete the street lamp installation project, the two parties, based on the principle of equality, mutual benefit and consensus, have reached the following agreement through full consultation in accordance with the relevant provisions of the People's Republic of China (PRC) Contract Law:

First project

1. Project name: street lamp installation of 26-meter entrance road of the construction project of Sichuan-Guizhou Industrial Port in Qiandong New City.

2. Project Location: zhenyuan county, Guizhou.

Three. Project content: it shall be implemented in accordance with the bidding documents of general contracting project and Party A's requirements. The main contents are as follows: newly installed 7-meter-high disposable street lamp, newly poured street lamp foundation, excavated and backfilled cable trench, demolished and restored sidewalk, damaged and restored roadway, newly installed cable tube and laid cable provided by the owner; Procurement, transportation, construction, installation and lighting of new lamp poles, lamps, electrical equipment, light source materials, cable pipes, accessories, street lamp foundations and auxiliary materials.

Article 2 Project implementation

1. The project is planned to start on August 20th, 20xx, complete on October 20th, 20xx 165438, and the construction period is 15 months.

Two. In case of any of the following circumstances during the construction, the construction period shall be postponed accordingly with the consent of Party A. ..

1, reason of force majeure.

2. Party A fails to provide necessary construction conditions.

3. Other delays not caused by Party B. ..

Three. Party A shall manage, supervise and coordinate the project in the whole process and in all directions.

Four. Party A designates the location and temporary arrangement of water and electricity interfaces for Party B's on-site construction, and Party B shall bear the water and electricity expenses for on-site construction and related expenses for temporary facilities.

5. During the construction period, Party B shall guard, fence and guard at its own expense according to the needs of the project. Before the finished products are delivered to Party A, Party B shall be responsible for the protection of the finished products.

6. Party B is responsible for cleaning the site in time after daily completion, and transporting the slag or garbage generated by its own construction out of the site.

Seven. Party B shall be responsible for the construction safety of the project scope before completion and handover, and all construction safety accidents during the period shall be borne by Party B. ..

Eight. On the premise of ensuring the construction quality, Party B shall bear the expenses arising from the cross-construction of this project and other sub-projects.

9. Without Party A's permission, Party B shall not carry out construction at night.

X. All kinds of lines and public facilities damaged by Party B during the construction shall be compensated by Party B.. ..

Article 3 Total Contract Price and Payment Method

1. The total contract price is: in words: RMB one hundred and sixty thousand Yuan only Wu Bai Yuan only (in figures: ¥5 160000.00 Yuan).

Second, the payment method:

After the lighting installation of the project is completed and accepted, Party A shall pay 95% of the total contract price in one lump sum within seven days, that is, 49020xx.00 Yuan (in words: RMB four million five hundred and ninety-two thousand Yuan only). 5% of the remaining total contract price, namely RMB 258,000.00 Yuan (in words: RMB two hundred and fifty-eight thousand Yuan only), shall be used as the quality guarantee for this street lamp installation project, and shall be paid to Party B at one time without interest within 7 days after the expiration of one year from the date of project completion acceptance.

Article 4 Project Quality

1. The engineering effect meets the requirements of Party A's drawings.

2. The quality of products and projects provided by Party B shall conform to the bidding documents of general contracting projects and Party A's requirements. Should provide the corresponding quality certificate, in line with the corresponding national or industry standards and other requirements.

Article 5 After-sales service

1. The quality guarantee period of this project is one year, counting from the date of acceptance.

Two. Solution of problems within the warranty period: Party B shall go to the site to solve the corresponding problems within 24 hours after receiving the notice from Party A. ..

3. If Party B fails to send someone to the site or solve the problem in time within the above time limit, Party A has the right to handle it by itself, and the expenses and responsibilities arising therefrom shall be borne by Party B. ..

Article 6 Project completion acceptance

1. The project acceptance shall conform to the national construction acceptance specifications, quality inspection standards, industry specifications, contract documents of this project and Party A's requirements.

2. After the project meets the completion acceptance conditions, Party B shall submit the completion report to Party A, and Party A shall be responsible for organizing the acceptance.

Party A shall give a reply within fifteen days after receiving the completion report: if it meets the acceptance conditions, it shall organize the acceptance within fifteen days; If it does not meet the acceptance conditions, it shall notify Party B in writing within fifteen days. If it is not approved after fifteen days, it will be deemed that the acceptance conditions have been met and the project will be automatically accepted.

Three. The completion report provided by Party B to Party A shall include detailed and accurate completion drawings and completion data in quadruplicate.

Article 7 Liability for breach of contract

1. If Party B delays the construction period without justifiable reasons due to its own reasons and fails to complete the cost project within 15 months of the contract period, it shall pay Party A a penalty of 5‰/ day of the total contract price; If the construction period is delayed for more than half a month due to Party B, Party A has the right to terminate the contract, and the losses caused to Party A therefrom shall be borne by Party B. Party A reserves the right to claim the insufficient performance bond.

2. Party B transports the slag or garbage generated by its own construction to the site after daily completion, and fails to clean up the site in time; Party A has the right to punish according to the daily 200 yuan standard.

3. If Party A fails to accept and pay the project payment according to the requirements of this contract, it shall pay Party B a penalty of 5‰ of the total contract price/day;

Article 8 Other matters

I. If there are any matters not covered in this contract, both parties shall reach a supplementary agreement through consultation. The supplementary agreement has the same legal effect as this contract.

Two, the contract dispute, the two sides should negotiate to solve. If no settlement can be reached through negotiation, both parties shall bring a lawsuit to the local people's court.

3. This contract is made in duplicate, with each party holding one copy.

Four. This contract shall come into effect as of the date when Party A and Party B affix their official seals and sign by their legal representatives or authorized agents.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Solar Energy Engineering Installation Contract 2 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

After friendly negotiation, Party A and Party B reached an understanding on the system design of Xinhe Jiayuan solar hot water system project, and now reached the following agreement on related matters:

I. Technical parameters

1。 Water capacity, number of pipes, pipe diameter, shell material, inner container material, supporting material, others:

According to the requirements of the owner of Party A's residential area, if other models are needed, other models can be provided with the consent of Party A, and the quotation will be discussed separately.

2. Accessories:

3. Hot and cold water pipes, wires and pipes shall be connected according to the positions reserved by the four parties, and Party A shall construct according to the actual situation.

Second, the acceptance method

The acceptance shall be jointly conducted by Party A, Party B and the Owner. All materials used in the system are of high quality and meet the relevant national standards. System acceptance criteria are based on technical parameters and construction scheme. Specific indicators are lower than the relevant national industry indicators or standards, according to national standards for acceptance.

Three. Fees and payment methods

1. The price of each water heater is RMB: (,auxiliary equipment:

2. The payment method is as follows

Four. Responsibilities and obligations of Party A

Party A shall provide electricity and water for the construction site. Party A shall provide relevant design materials for the building roof. After the construction scheme and installation location are determined, if Party A needs to change the design or increase or decrease some projects, it will be implemented after confirmation by both parties.

Verb (abbreviation of verb) Party B's responsibilities and obligations

1. Party B shall ensure that the system configuration and functions meet the requirements of "System Technical Parameters" and national standards of relevant industries.

2. During the construction period, Party B shall not move or destroy the original facilities on the roof of Party A without authorization. If necessary, Party A shall be informed in writing and handled by Party A..

3. The installation location of Party B shall be determined by Party A in advance. The construction quality of Party B shall meet the safety requirements (including lightning protection requirements). Party B shall bear all the responsibilities for the losses caused by the defects of Party B's construction scheme and the construction quality not meeting the safety requirements.

4. Party B shall be responsible for all safety problems in the construction.

Liability for breach of contract of both parties of intransitive verbs.

If one party's breach of contract causes losses to the other party, it shall pay a penalty of RMB yuan in addition to compensation for the losses.

Seven. Party B's quality commitment and after-sales service

1. If the main solar water heater has quality problems within three years, Party B will replace it for free. Auxiliary devices and control systems shall be replaced by Party B free of charge due to quality problems within one year. For the damage beyond the warranty period or the damage caused by quality problems (man-made damage or improper use), Party B only charges the production cost and provides lifelong service.

2. However, if the solar mainframe is damaged due to disasters, Party B promises to replace it free of charge. The after-sales service promised by Party B will arrive at the site within 24 hours after the maintenance, which will not affect the normal use of the community owners of Party A..

3. Party B promises that the normal service life of the system is 20xx years.

8. If either party breaches the contract, both parties shall first settle it through friendly negotiation. If negotiation fails, the breaching party has the right to resort to law.

Nine. This contract shall come into effect as of the date of signature and seal by both parties. This contract has 3 pages in total and is made in duplicate, with each party holding one copy.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Solar Energy Engineering Installation Contract 3 Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws, both parties sign this contract on the basis of equality, voluntariness and consensus, for mutual compliance.

I. Overview of the Project

1, project name:

2. Project location:

Second, the contract price and products

1. Contract price: RMB (in words: RMB only).

2. Product and price: one (brand) ton thermal insulation water tank, with unit price of RMB per ton. One air energy 5P machine, unit price.

Note: 2. 1 The project price includes tax, and the project invoice is issued.

2.2 The project price includes: transportation fee, installation time fee, commissioning fee, inspection fee, etc.

Third, the term of the contract.

1. After the contract is signed, the material preparation period is 10 day, the installation period is 10 day, and the planned installation time is 20xx165438+1October 20th to 20xx165438+. Party A shall notify Party B of the details five days in advance.

Fourth, the project payment:

When Party A pays Party B for the project, Party B will issue a receipt to Party A. ..

1. After the contract comes into effect, the down payment is 15000 yuan (in words).

2. Pay RMB 10000 Yuan (in words) after the goods arrive at the installation site.

3. After the normal operation of installation and debugging, Party A and Party B shall pay the final payment of RMB 7,200 (in words) in one lump sum. Note: If Party A fails to pay according to the contract, it has the right to take back the equipment.

Verb (abbreviation of verb) warranty and after-sales service

1. From the date of installation, the whole water heater is guaranteed for three years, and the accessories (controller, safety relief valve and pipeline) are guaranteed for one year.

2. Within the specified warranty period, all failures caused by manufacturing problems can be repaired free of charge.

3. The following situations are not within the scope of free maintenance, and maintenance services can be provided, but the material fee is charged:

(1) Damage or normal long-term loss caused by improper use by users (handling, bumping, improper input voltage, etc.). ).

(2) Damage caused by the maintenance point's own installation and maintenance without the company's permission.

(3) Damage caused by force majeure (such as fire, flood, earthquake, war, etc.). ).

4. During the warranty period, Party B must go to the site for treatment within 48 hours after receiving the notice.

The responsibility of both sides of intransitive verbs

1, Party A's responsibility

1, go through the payment procedures for the project according to the provisions of this contract.

2. Coordinate with the general contractor to provide the site for the supervisor.

3. Coordinate the general contractor to provide power interface.

4, engineering installation, water and electricity use costs.

2。 Party B's responsibilities

1. Party B shall assign professional technicians to carry out the construction and installation, and complete the project within the time limit stipulated in the contract. During the construction period, Party B must obey the management of Party A and the supervision of site supervisor.

Seven. responsibility for breach of contract

Except for force majeure and government policy actions, both parties shall perform their obligations in strict accordance with the terms of the contract and shall not breach the contract; Otherwise, the observant party has the right to require the defaulting party to bear 50% of the total contract price for breach of contract. If the liquidated damages are insufficient to make up for the losses, it shall compensate the insufficient losses.

Eight. Termination of contract

Nine. others

1. If both parties have a new agreement, they shall sign a supplementary agreement on this contract, which has the same legal effect as this contract. Disputes arising from the performance of this contract shall be settled by both parties through friendly negotiation; If negotiation fails, a lawsuit may be brought to the people's court where Party A is located.

2. This contract shall come into effect as of the date of signature and seal by both parties, and shall become invalid after payment. This contract is made in duplicate, with Party A and Party B holding one copy respectively. ..

This contract shall be terminated after the rights and obligations of both parties are fulfilled.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Solar energy engineering installation contract 4 construction unit:

(hereinafter referred to as Party A)

Construction unit:

(hereinafter referred to as Party B)

Maintenance unit:

(hereinafter referred to as XX)

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, fairness, honesty and credit, since Party B did not listen to the opinions of Party A's management and did not use professionals to carry out protective demolition of solar energy in the dormitory renovation project of Party A's living quarters, the solar energy of Party A's private users was damaged in a large area. Now Party B entrusts XX to be responsible for its maintenance service and scale removal, and through friendly negotiation among Party A, Party B and Party C, the solar energy is repaired and dismantled.

first

1. Project name: solar energy maintenance and installation project.

2. Project location:

3. Maintenance scope and content: Maintenance of vacuum tube collectors, incubators, auxiliary water tanks, roof pipes, connectors and accessories for all users who install solar energy. The key maintenance items are: whether the soft connection of the collector is damaged, whether the incubator is dripping, and whether the vacuum tube is white or damaged.

Article 2 Supply and installation methods of engineering materials: All engineering materials are provided by XX to Party A, and XX is responsible for the maintenance and installation of all solar energy equipment. Party B guarantees that the equipment provided is original, brand-new and authentic, and is responsible for the product quality; XX shall ensure that the installation and construction are carried out in accordance with national standards, and shall be responsible for the quality of the installation project.

Article 3 Product name, model, unit, quantity and amount:

Remarks: The above price includes equipment and materials, transportation, installation hours and taxes.

Article 4 The product quality and technical standards shall be implemented according to the enterprise product standards.

Article 5 Mode of transportation, place of arrival and mode of delivery of products:

1. Mode of transportation: XX car will be transported to the delivery place designated by Party A. ..

2. Arrival place:

3. Delivery method: At the place of delivery, the consignee of Party A shall sign for confirmation.

Article 6 Acceptance method and time limit for raising objections: Party A shall conduct acceptance according to the list of equipment and materials specified in the contract. If there is any objection to the specifications or quantity of the goods or both, Party A shall raise it in the presence of XX personnel, and then sign for it.

Article 7 Settlement method and time limit of solar energy equipment maintenance and installation project: the total contract price is RMB Yuan only ();

Payment method: Party A will transfer the money to XX Bank, but this fee will be directly deducted by Party A from the project payment for which Party B is responsible.

1. Within 7 working days from the date of signing the contract, Party A shall pay XX% of the total contract price, namely RMB (in words) as the advance payment;

2. Within 7 working days after the acceptance of equipment and materials, Party A shall pay XX% of the total contract price, that is, RMB (in words) as the project progress payment;

3. After the maintenance, installation and debugging are completed and put into normal use, Party A shall pay% of the total contract price to XX within 10 working days, that is, RMB (in words);

4. Quality deposit%, namely RMB: RMB (in words). The warranty period is 6 months, and it will be paid in one lump sum within 10 working days after the expiration of the warranty period.

5. For the above XX payment, Party A shall issue a special invoice for full value-added tax as required.

Article 8 Product quality responsibility and after-sales service terms:

1. The quality guarantee period is 6 months from the date of acceptance.

2.XX provides on-site maintenance and operation training of equipment; During the quality guarantee period, if the product is damaged due to product quality problems, XX shall be responsible for repairing and replacing parts and other materials; If the cause of the damage is not a product quality problem, XX will charge the basic maintenance fee, and if the damaged parts are replaced, the fee will be charged according to the ex-factory price of the replaced parts. After the warranty period ends, XX will provide lifelong paid maintenance service for Party A..

Article 9 Time limit for a project and construction requirements:

1, the construction period is 5 days. If XX fails to provide supporting materials and installation equipment according to the construction progress, which will affect the normal construction progress, Party A will impose a fine on 500 yuan.

2. Party A shall provide accommodation for the construction personnel, ensure the water and electricity supply at the construction site, and provide other necessary assistance during the construction.

3.XX shall carry out maintenance and installation in strict accordance with the relevant national standards and the requirements of Party A's users, accept the supervision of both parties, correct the non-conformities in construction, and bear corresponding responsibilities.

4, XX should pay attention to safety and civilized construction. XX shall be responsible for the safety accidents caused by XX.

Article 10 Liability for breach of contract:

1. Party A's responsibility: If Party A fails to pay the advance payment and the progress payment according to the time stipulated in the contract, Party A shall pay 5% of the liquidated damages to Party B or XX (equipment and materials are paid to Party B, and the project payment is paid to XX), but the total amount of liquidated damages shall not exceed 30% of the equipment and materials or the progress payment. If Party A fails to pay after reaching this limit, Party B and XX have the right to terminate the contract, and Party A shall bear the economic losses of Party B and XX.

2. Responsibility of Party B: During the construction process, Party B shall send 12 people to conduct on-site supervision and inspection, and shall not engage in malpractices for personal gain or perfunctory things. Mark and count the solar energy that cannot be repaired at all, and inform the relevant responsible personnel of Party A of the details. Otherwise, Party B will unconditionally bear all maintenance costs. If the delay exceeds 3 days, Party A shall be deemed to have unilaterally terminated the contract, and Party B shall bear all the economic losses of Party A. ..

3.XX liability: If the project is not completed on time due to XX reasons, Party A will pay a fine of XX500 yuan/day for each day of delay. If it is overdue for more than 3 days, Party A shall be deemed to have unilaterally terminated the contract, and Party B shall bear all the economic losses of Party A. ..

Article 11 If the contract cannot be performed normally due to force majeure, the three parties shall settle it through friendly negotiation.

Article 12 Ways to settle contract disputes: Disputes arising from the execution of this contract shall be settled by the three parties through friendly negotiation. If negotiation fails, either party may bring a lawsuit to the people's court where the plaintiff is located according to law.

Article 13 This contract shall come into effect as of the date of signature and seal by the three parties.

Article 14 If there are other matters not covered in this contract, the three parties can make supplementary provisions through consultation, which have the same effect as this contract.

The original of this contract is in sextuplicate, with Party A, Party B and Party C holding two copies respectively.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A's solar energy project installation contract 5:

Party B:

In accordance with the Economic Contract Law of the People's Republic of China, the Regulations on Construction and Installation Engineering Contracts and relevant regulations, and in combination with the specific conditions of this project, this contract is hereby signed by both parties through consultation for compliance.

I. Overview of the Project:

1. Project name;

2. Project site;

3. Scope and content of the project: (See the project list for details)

4. Project warranty period: one year from the date of project acceptance and delivery.

Second, the project cycle

1. The total duration of this project contract is days (calendar days are counted from the commencement date).

2. The commencement date of this project is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(1) Preparatory stage

Organize engineering and technical personnel and construction personnel to seriously investigate the site, formulate the technical scheme of engineering construction, study the solution, and conduct on-site measurement and fixed point.

(2) Construction stage

1. Foundation pit excavation: The foundation pit excavation is carried out in strict accordance with the fixed position, and manual excavation is adopted.

2. Foundation fabrication: C20 commercial concrete is used as the concrete foundation, and it is vibrated with a vibrator. Before pouring the reinforced concrete foundation, the water in the pit must be removed. The top position should strictly control the elevation of the foundation surface.

3. Installation and construction of street lamps: After all the basic work is completed, the lamps can be installed. Lamps and lanterns installation must be carried out by certified professional electricians, and the lamps and lanterns installation task must be completed with good quality and quantity.

4. Installation of distribution box: The distribution box shall be installed on the ground, and there shall be no gas, steam or other chemical corrosive substances that have a serious impact on the conductor and insulation of the equipment.

5. Installation of grounding device: punch a grounding angle with the length of 1.5m on each lamp post, with the model of L50×50×5× 1500. Connect the vertical grounding electrodes reliably with φ 16 galvanized round steel. The metal frame of the distribution box should be well grounded.

6, project acceptance, both engineering supervision acceptance test of this project.

Four. Organization and responsibilities of the project department

1. Project Management Department: comprehensively manage the project, be specifically responsible for the implementation of this project, control the project progress on site, and coordinate and solve problems such as quality, cost, safe production, civilized construction, mechanical scheduling, materials and labor.

2. Technical data group: solve technical quality problems and assist the project manager in project construction.

3. Quality inspection team: conduct quality self-inspection, assist supervision in quality inspection, and collect and sort out quality assurance information.

4. Foundation construction team: responsible for pipeline and foundation construction tasks.

5. Electrical construction team: responsible for the installation and debugging of street lamps.

6. Transport team: responsible for transporting earthwork, materials and lighting materials.

7. Mobile team: responsible for the installation and debugging of instrument control system and grounding electrode.

8. Material group: cooperate with the technical and construction group to provide all kinds of tools and materials needed, ensure the supply of materials according to the project progress and construction requirements, strictly control the quality of materials, and do not allow unqualified products to enter the site.

Five, the construction progress plan and guarantee measures

Schedule: Our company plans to enter the site within working days after signing the contract, and immediately set the site, lay the foundation and install street lamps, and strive to complete the construction task in 25 days.

Guarantee measures: according to the requirements of the construction unit and the actual situation of the project, the construction period is 25 days. In order to ensure the timely completion of the construction task, the guarantee measures we take are:

(1) Control the construction period according to the construction progress;

(2) According to the construction schedule and the actual progress of the project, work out the weekly operation plan, adjust the input of manpower and equipment in time, and ensure the completion on schedule;

(3) Each ZuoYeDui makes daily arrangements according to the schedule to ensure completion;

(4) Strengthen the inspection and implementation of the schedule, and carefully check and implement it item by item every day;

(5) Strictly control the process links to ensure that all divisional projects are completed as planned;

(6) According to the requirements of the construction schedule, prepare the supply plan, labor use plan and construction machinery use plan of various materials and processed parts, and implement them as planned;

(7) Manage the invested manpower, material resources and financial resources scientifically and reasonably, and make overall plans and balances in time to ensure the rationality, compactness, balance and continuity of the project construction;

(8) Try to adopt factory, mechanized construction and advanced construction technology to speed up the construction progress;

Construction cost and payment method of intransitive verbs

1, and the total project cost is RMB:

2. The project payment method is that after the contract is signed, Party A pays the project deposit as advance payment, and the goods arrive at the construction site. After the project installation is completed and the system debugging is normal, Party A shall pay% of the project cost, and the balance shall be paid within three months after the completion.

Seven. Responsibilities and obligations of Party A

1. Party A provides electricity for construction and water for construction site.

2. During the construction, Party A shall provide temporary warehouses for Party B to store construction materials; Party B is responsible for the safety of building materials during construction.

3. After the construction scheme and installation location are determined, if Party A needs to change the design or increase or decrease some projects, it will be implemented after confirmation by both parties.

4. Party A shall pay the project payment on time.

Eight. Responsibilities and obligations of Party B

1. Party B shall ensure that the system configuration and functions meet the requirements of "System Technical Parameters" and national standards of relevant industries.

2. During the construction, Party B shall not move or destroy the original facilities on the roof of Party A without authorization. If necessary, Party A shall be informed in writing and handled by Party A..

3. The construction period of this project is 25 days from the effective date of the contract, which is not affected by strong winds, rainy days, other natural disasters and force majeure.

4. The installation location of Party B shall be determined by Party A in advance.

5. Party B shall be responsible for all safety problems in the construction. If either party breaches the contract, both parties shall first settle it through friendly negotiation. If negotiation fails, the breaching party has the right to resort to law.

This contract shall come into effect as of the date of signature and seal by both parties. This contract is made in duplicate, one for each party.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6 solar energy project installation contract of Party A:

Party B:

Through consultation, Party A and Party B decide to install solar energy project at the place designated by Party A, and hereby sign the following contract:

1. In order to ensure the installation quality of this project, Party B shall send professional installation personnel and carry out the construction in strict accordance with the installation plan agreed by both parties.

2. In order to ensure the engineering installation quality, Party A must use the original standardized accessories of Party B. ..

Three. Party A must cooperate with Party B in the construction process. Party A's water and electricity must be in place, and Party A can start installation only when it has the installation conditions. If the construction period is delayed due to Party A's reasons, the construction period will be postponed. ..

Four. Party B's responsibilities;

1. Provide qualified products to Party A according to the contract requirements.

2. According to the contract requirements, the models, specifications and quantities of the main products provided to Party A are shown in the built-in list. ..

3. Party B shall serve the project according to the service commitment. See "After-sales Service Commitment of Solar Energy Project" for details.

Verb (abbreviation of verb) Project amount and payment method:

1. The total contract price is RMB twenty-four thousand yuan only (24,000 yuan only).

2. This contract shall come into effect after being signed and sealed by both parties. After the contract comes into effect, Party A shall immediately pay Party B an advance payment of 30% of the contract price, that is, seven thousand two hundred yuan only (seven thousand two hundred yuan only).

3. After Party A passes the acceptance, Party A shall pay the remaining project funds to Party B in one lump sum.

Six, construction and time limit for a project:

1. Party B shall enter the site for construction from the date of receiving the advance payment from Party A. ..

2. In the process of project installation, if Party A has other requirements for Party B, both parties can make an agreement separately.

Seven. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.

Eight. Any dispute arising from the performance of this contract shall be settled by both parties through friendly negotiation. If negotiation fails, it can be settled through legal channels.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _