Summary of Oil Depot Work 1 Keke Oil Depot, under the correct leadership of the company, conscientiously implemented the company's work arrangements, guided by scientific development, closely focused on the hardware and software construction of the oil depot, and consolidated the oil depot infrastructure. Through the joint efforts of all staff, Keke Oil Depot has made some achievements in the aspects of construction perfection and preparation before production, but there are also some shortcomings. The summary is as follows:
I. Oil Depot Construction Keke Oil Depot Construction Project is located in the east of Keke Salt Industry Group, Tangke Town, Wulan County, Haixi Prefecture. The main construction contents are: oil storage tank area, railway oil loading and unloading area, highway oil distribution area, auxiliary production area and administrative area. There are 0/0 oil tanks/kloc-0 in the first phase, with a total tank capacity of 24000m, including 3 gasoline tanks with a tank capacity of 6000m;; 7 diesel tanks with a tank capacity of 65438+800,000 m; Storage tanks all adopt internal floating roof storage tanks; The grade of oil depot is Grade II. The project covers a total area of 66,380 square meters with a total investment of 87,480,600 yuan, including 6165438+3,000 yuan for environmental protection. After the project was approved, it broke ground in September, completed the "three links and one leveling" and infrastructure construction before the end of 20xx, resumed work on March 27th, and was completed in June 65438+ 10 of the same year. After the completion of the construction, Wei Song, director of the development department of the sales company, and other leading groups are responsible for the acceptance. The Keke oil depot passed the acceptance of Haixi Fire Brigade on February 15, 20xx. At present, we have made many contacts and communication with railway companies, safety supervision bureaus, land and resources bureaus and other relevant departments, and made good progress. After the special railway transportation line is opened to traffic, the oil depot can transport oil.
Two. Main Work Progress With the strong support of the company and the joint efforts of all employees, Keke Oil Depot has mainly completed the following work: 1. Strengthen the renovation of oil depot infrastructure and improve the quality of oil depot engineering. According to the construction standards of oil depot engineering and the company's requirements for the quality of oil depot engineering, Keke Oil Depot has carried out comprehensive renovation of important equipment, facilities and important areas related to oil depot safety production. Organize employees to carry out a comprehensive sanitation cleaning work for the whole reservoir area and reserved reservoir area, which greatly improved the sanitation of Keke oil depot and the working environment of employees; The lighting system of sewage pool and oil shed in oil area was reformed to meet the explosion-proof safety regulations. Problems such as submersible pump, crane pipe and warehouse sweeping pipeline in the oil unloading pump house and oil unloading trestle have been rectified; The auxiliary facilities such as fire dike, fire pipeline and fire sand pool in the tank farm have been transformed to meet the fire protection standards; The civil works, installation and electricity of the oil depot have been carefully renovated and rectified to ensure the construction quality of the project; All the systems and equipment in the warehouse have been debugged, and all the fire fighting systems, sprinklers, water testing and fire hydrants have been tested. The existing problems have been recorded one by one. Later, the rectification test was carried out to ensure that all equipment and facilities operated normally after the oil depot was operated. 2. Strengthen personnel training and improve the construction of rules and regulations. According to the company's arrangement, in August of 20xx, all the personnel of Keke Oil Depot were in place, and Keke Oil Depot made a detailed personnel training plan. After the personnel were in place, they were trained in Golmud Island Training Base for two months, which strengthened their understanding of the theoretical knowledge of oil depot. During this period, employees were arranged in turn to Keke Oil Depot and Golmud Oil Depot for practical operation, and they were familiar with the technological process and the use of equipment and facilities. In June, all staff were arranged to study the knowledge of the practice 1 1 system oil depot in Zhuzhou, Hunan Province. Through the study and training, the employees' profound understanding of the work has been improved, and their post responsibilities and awareness of safety in production have been strengthened. With the basic construction of the oil depot basically completed, the oil depot actively improves the rules and regulations of the oil depot. Keke Oil Depot has formulated some relevant rules and regulations by learning from the experiences of Xining Oil Depot, Golmud Oil Depot and Zhuzhou Oil Depot in Hunan, and is constantly improving them. It has laid a solid institutional foundation for the experience management of oil depots in the future. By strengthening personnel training and improving the construction of rules and regulations, Keke Oil Depot has the trial operation capability. Looking back on this year's work, under the cordial leadership and care of the company's leaders, Keke oil depot has grown from scratch, from drawings to reality, during which we have encountered many difficulties and challenges, but when faced with smooth roads, clean office buildings and brand-new equipment and facilities, we feel that all the hard work and sweat are worth it. Facing the achievements, all the staff of Keke Oil Depot will not be complacent. We will, as always, work hard, strive for the normal operation of Keke oil depot as soon as possible, and complete all indicators and tasks assigned by the company. There are still many shortcomings in our actual work, and we will try our best to overcome and improve them in our future work.
Summary of oil depot work 21 years passed quickly, and a new year is coming soon. Looking back on this year's work, as the administrator of Shanghai Logistics Tianjin Warehouse, I completed all the tasks assigned by the company under the correct leadership of the company's leaders. Now I summarize the work this year as follows:
I. Basic work situation
1, participated in the establishment of Tianjin rdc. At the beginning of XX, with the help and support of leaders and under the guidance of Master Shen of Shanghai Warehouse, rdc was completed from scratch. XX years into the company, in the face of strange environment, strange work, little understanding of enterprise operation. With the guidance and help of Master Shen, I quickly mastered my work and business, and became familiar with warehousing operation, warehousing management, warehousing operation, report making and fee collection management. Participate in the third-party inventory of sabic, coordinate the delivery driver to deal with abnormal situations accurately and timely, handle all kinds of work details, and obey the work arrangement and management system of superiors and companies.
I am familiar with the work in the factory at first. Due to the busy work of the office in XX, the demand exceeds the supply, and the leaders should arrange to work in Dagang Petrochemical Plant for a short time. Through my work in the factory, I am familiar with the workflow and work content of the resident office, the process steps of handling the documents delivered by the factory, and coordinating the relationship with the resident staff of sabic and the business department of the petrochemical plant. When the delivery truck of the delivery driver approaches, handle the relationship between the factory site and the forklift of the warehouse keeper of the delivery class. Understand the problems and difficulties that other departments need to face in their work, and lay a good foundation for mutual cooperation and understanding between departments in the future.
3. Overcome the difficulties in the work and solve some problems encountered in the work. Because the work needs to meet various relationships, such as warehouses, motorcades, delivery drivers, dealers, sabic related leaders and so on. And each aspect is an independent interest body, and each aspect has its own interests. In the face of these aspects, keep in mind the instructions of the leaders, strive for unity, work carefully and make some compromises. Strive to be the best and contribute to the development of the company. At the same time, through one year's experience, I have grown a lot in coordination and improved my ability. Thank you for your support and training.
Second, the basic experience and shortcomings.
1. Dedication is the premise of doing your job well. Because I am engaged in warehouse management, I must first be familiar with the model, characteristics and packing rules of warehouse goods. Because there were not many plastic particles before, it was almost a blank sheet of paper. I am determined to do a good job, starting with distinguishing the characteristics and packaging of polypropylene and linear goods. The stacking rules to the warehouse, the problems that need to be paid attention to from the warehousing to the warehousing, and so on. I finally sorted out the work.
2, not afraid of hardship, not afraid of fatigue, maintain respect for people, and stick to their professional ethics. At the beginning of my work, because I was unfamiliar with the work and the staff were nervous, I hardly took a day off for three months and often worked overtime to ensure the smooth completion of the work. Whether it is snowy and windy in winter or hot and rainy in summer. As long as the work needs to overcome difficulties, satisfy them. At work, some pick-up drivers can't pick up the goods because of the limited load of the vehicle, so they put cash in the driving license or follow me into the toilet. I refused to bend the rules, and always adhered to the process and listened to the instructions of the leaders.
3, lack of flexibility, can not handle the relationship between seeking truth from facts and flexibility. In my daily work, I still lack flexibility, which is the deficiency in my work and the direction of my future efforts.
In the new year, I will do my job more conscientiously, do my job dutifully with a down-to-earth attitude, constantly improve and perfect my work ability, and better complete all the work assigned by my superiors.
The above is my personal annual work summary, please supervise and correct me!
Summary of Oil Depot Work Since I joined the work in 20xx, I have been strict with myself, studying hard, working hard, being conscientious, doing well in all aspects and doing my duty as an oil worker. The work in 20xx years is summarized as follows.
First, keep learning and improving.
Oil depot work is a comprehensive work, involving a wide range. Only by strengthening one's knowledge and ability in many aspects can one successfully complete various tasks. In order to adapt to this important work, I consciously strengthen my study after work, learn from books, leaders, colleagues and the masses, test my knowledge in practice, reflect, summarize, accumulate and improve in practice. In 20xx, he participated in the primary skill appraisal examination for oil storage and transportation blending workers organized by the company and passed it smoothly.
Second, do a good job of on-site supervision to ensure the safety of oil depot construction.
There are many oil depot constructions in 20xx, among which the larger projects are: renovation of process pipeline, roof waterproofing of office building, renovation and maintenance of waterway oil pump shed, installation of combustible gas alarm, replacement of camera in oil depot, maintenance of business building, etc. These construction operations have great safety risks, and the construction period is long and there are many hidden projects. I can do a good job of monitoring these construction projects on site and ensure the quality of the project on the premise of ensuring construction safety.
Third, do a good job in oil depot fire safety.
Fire safety is always the top priority of oil depot. As the monitor of the oil depot, the fire safety work of 20xx oil depot is carried out as planned, and the responsibility is clearly defined to do the fire safety work well, and the hidden dangers are rectified in time, so that the fire safety work can be carried out in an organized, led and planned way this year. This year, employees in oil depots have been trained in the basic knowledge of fire safety twice, and fire safety drills have been conducted many times. In addition, fire drills in oil depots and docks have been completed in conjunction with maritime affairs, fire protection and security inspection departments.
Four, maintain the normal operation of oil depot network information
In 20xx, I continued to do a good job in the maintenance of oil depot network information to ensure the normal operation of oil depot invoicing system and highway oil payment system. Cooperate with CNC engineer to add servers for oil depot system and be responsible for maintenance. Basic fault maintenance of oil depot office computer, maintenance and basic maintenance of oil depot network.
Verb (abbreviation of verb) has its shortcomings.
20xx years are about to pass. Looking back one year, there are still some shortcomings in my work. Among them, there are still loopholes in the management of outsourced police: inspection in the warehouse without overalls, and no regular maintenance of fire-fighting equipment. I also have procrastination in my work, which will be something I need to improve in my future work.
The work plan of intransitive verbs for next year
Earnestly implement post responsibilities and earnestly perform their duties. Strengthen study, actively participate in various trainings and activities organized by working institutions, and strive to pass the intermediate examination for oil storage, transportation and blending workers. Correct your bad habit of procrastination.