The first chapter is the main contents and requirements of safety technical data management on the construction site.

The significance of the first section of the construction site safety technical data management

Section 2 Construction Site Safety Technology Management System

In the third quarter, the establishment of construction site safety technical data

Section 4 Classification of Safety Technical Data on Construction Site

Chapter II Construction Site Safety Management Information

Section 1 Safety Supervision of Construction in Progress and Relevant Certificates (First File)

The responsibility system for production safety in the second quarter (the second file box)

The third section target management (the third file box)

The fourth section safety construction organization design (the fourth file box)

The fifth section division (disciplines) engineering safety technical disclosure (fifth file box)

Section 6 Safety Inspection (Section 6 File Box)

Section 7 Safety Education (File Box 7)

Section 8 Pre-shift Safety Activities (File Box 8)

Section 9 Certificates Related to Special Operations (File Box 9)

Section 10 industrial accidents (Section 10 file box)

Section 11 Safety Signs (eleventh file box)

Section 12 management of certificates related to safety protection articles and mechanical equipment (file box 12)

Section 13 Acceptance Test Record of Mechanical Equipment and Facilities (file box 13)

Section 14 temporary power consumption for construction (file box 14)

Section 15 Civilized Construction (file box 15)

The production of labor protection data 1 and safety technical data is the product and crystallization of safety production process. Because of the scientific, standardized and standardized data management, the on-site construction safety management can be continuously upgraded to a higher level and level, making the overall management of the construction site more scientific, standardized and standardized.

2. The orderly management of safety technical data is one of the important contents of the whole process management of safety supervision, subsection acceptance and comprehensive evaluation.

3. Establish and improve the formal professional data management to ensure the originality and authenticity of the safety technical data on the construction site. 4. Real and reliable safety technical data is the basis for guiding future work and leading work decisions. Orderly safety production can reduce unnecessary time waste and expense loss, further standardize safety production technology, improve labor production efficiency and reduce the frequency of casualty accidents.

5. The effective preservation of data provides reliable evidence for the treatment of casualty accidents in the construction process, and provides reference for the future accident prediction and prevention.

In the second quarter, the construction site safety technical data management system

I. Management system

Construction enterprises should strengthen the management of safety technical data, implement the project manager responsibility system, and set up on-site safety librarians at the construction site to be responsible for the management of safety technical data. The safety documenter must be trained by the competent department of the industry and hold relevant certificates after passing the examination.

Second, establish a safety technical data management system.

1, management system:

& lt 1 & gt; The safety technical data of the construction site shall be filled in by the relevant departments and the person in charge of safety technical operation, and shall be responsible for the authenticity of the records. & lt2> When filling in, it shall be arranged in time with the progress of the project, and it shall not be filled in in advance or delayed. & lt3> Data should be filled in with complete items, accurate and true contents, neat handwriting, complete procedures and no omissions. & lt4> Various materials shall be reviewed by the on-site safety documenter, and shall be signed and filed by the on-site safety documenter after passing the review. On-site safety librarians should supervise and manage the authenticity of the data and be responsible for the validity and authenticity of the data.

2, security documenter post responsibility system:

& lt 1 & gt; Should be familiar with the standards, norms, regulations and requirements of the administrative departments of the Ministry, province and city for safety inspection, testing and acceptance of the construction site. & lt2> strictly follows the requirements of the safety technical data management system.

& lt3> According to the construction progress, timely urge relevant personnel to sort out and report safety technical data. The content should be accurate and true, the items should be complete, the procedures should be complete, the handwriting should be neat and clear, and it should be carefully summarized and classified in time. Do not resort to deceit, and be responsible for the integrity of information. & lt4> is responsible for signing and filing the safety data of this site, and it is forbidden to file unqualified data. & lt5> Strengthen file management, and all kinds of archived documents shall not be borrowed from others without the consent of the leaders, so as not to be lost or damaged.

In the third quarter, the establishment of construction site safety technical data

A, the construction site safety technical data management should include the content;

According to the requirements of JGJ59-99, the contents of safety technical data management on the construction site mainly include the following fifteen categories:

1, safety supervision of construction in progress and related documents 2, responsibility system for production safety 3, management by objectives

4, construction organization design 5, division (disciplines) engineering safety technical disclosure 6, safety inspection

7. Safety education

Section 4 Classification of Safety Technical Data on Construction Site

1. Safety supervision of construction in progress and relevant certificates.

Section 5: 1. General situation of the project and on-site investigation. Site filing and project overview are hung at the door.

2. Site archiving of planning permit 3. Letter of acceptance. building permit

5. Enterprise safety qualification certificate

6. Safety supervision application form

7. Evaluation Form for Safety Standards of Building Engineering (foundation construction stage, structure and decoration construction stage)

8. Confirmation of safety standards for construction projects

9. List of project management personnel (or roster) and relevant certificates

10. Appointment documents of main project managers

1 1. The on-site safety management guarantee system is filed and hung in the corresponding position.

12. Site layout and safety sign layout

13, other relevant documents filed on site.

Second, the responsibility system for production safety

1, the responsibility system for production safety of all levels, departments and managers shall be filed at the site and hung in the corresponding position.

2. On-site archiving of the roster of management personnel

3, production safety management system (including safety management responsibility target assessment method)

4, the project department production safety responsibility target decomposition table

5, management personnel safety production responsibility target assessment form

6. Economic contract

7, each type of work and the main machine safety technical operation procedures on-site archiving, hanging in the corresponding position.

8, full-time security officer, security documenter equipped with situation and related documents on-site filing, show certificates.

9, the project department safety duty system on-site archiving.

10. The safety table of the project department is filed on site and hung in an obvious position.

1 1. The safety duty record of the project department shall be filed on site and put in the duty room of the project department.

Three-objective management

1, safety management responsibility target assessment method

2, the project department security responsibility target decomposition table

3, safety management objectives monthly breakdown assessment form

4, safety management target department assessment form

5, the project manager safety responsibility target assessment form

6, quality controller safety responsibility target assessment form

7, construction technical personnel safety responsibility target assessment form

8, construction management personnel safety responsibility target assessment form

9, safety officer safety responsibility target assessment form

10 class (group) long safety responsibility target assessment form

Fourth, the construction organization design

1, construction organization design

2, safety construction organization design

3, professional project safety construction organization design (scheme, technical measures)

4, engineering geology (environment) survey report

5, construction organization design (scheme, technical measures) form

6, construction organization design (scheme, technical measures) change approval sign form

7, the main working procedure starts (use) application form

8, construction organization design (scheme, technical measures) directory

Five divisions, subdivisional work safety technical disclosure

1, safety technical disclosure regulations

2, safety technical disclosure registration form

3, basic engineering safety technical disclosure

4, the main project safety technical disclosure

5, roof engineering safety technical disclosure

6, decoration engineering safety technical disclosure

7, doors and windows engineering safety technical disclosure

8, scaffolding engineering safety technical disclosure

9, temporary electrical engineering safety technical disclosure

10, safety technical disclosure of vertical transportation machinery

1 1, safety technical disclosure of construction machinery and equipment

12, water heating and ventilation engineering safety technical disclosure

13, safety technical disclosure of electrical installation project

14, fire engineering safety technical disclosure

15, other engineering safety technical disclosure

16, safety technical disclosure of each type of work

17, safety technical disclosure

18, technical disclosure of foundation construction safety

19 installation (removal) safety technical disclosure

6. Security check

1, safety inspection system

2, safety inspection score [JGJ59-99 "building construction safety inspection standard"]

3, the project department safety daily inspection records

4, project safety inspection records on a regular basis

5, security risks rectification notice

6, accident hidden danger rectification report

7. Notice of Punishment

8, disciplinary personnel education records

Seven safety education

1, on-site archiving of safety education and training system

2, employee safety education and training roster

3, employee safety education documents

4, safety education records

5, handover safety education records

6, special operations personnel safety education and training records

7, construction management personnel annual safety training registration form

8. Employee labor contract

9, full-time security officer annual assessment form

Safety activities before eight shifts

1, filed in security team activity system.

2, safety meeting system

3. security team activity record

4, the project department safety meeting record

5, full-time security officer work log

9. Special operations related certificates.

1, management measures for on-site filing of special operations personnel

2, special operations personnel roster

3, special operations personnel related certificates

4, special equipment installation qualification certificate

X. Handling of industrial accidents

1, on-site filing of industrial accident investigation and handling system.

2, inductrial injury accident record

3, casualty accident report

4, the construction system of enterprise employee casualty monthly (annual) report

5, casualties (major attempted) accident records

6, because of work-related casualties investigation and handling of the closing table

7. Employee accident insurance. Other relevant information

1 1 safety signs

1, the safety sign account is filed on site.

2. Site safety signs shall be filed and hung on site.

3, floor safety sign layout

Twelve safety precautions

Management of documents related to tools and mechanical equipment

1, on-site construction machinery and equipment registration form filed on site 2, on-site safety protection articles registration form

3, mechanical equipment installation record table 4, construction machinery safety inspection notice

5, safety protection equipment (mechanical equipment) use record.

6. Relevant documents such as production license, factory certificate, product quality and technical appraisal report of mechanical equipment (protective equipment).

13 kinds of facilities and equipment acceptance inspection

Records (except temporary electricity consumption for construction)

1, external scaffolding intermediate layer erection acceptance summary table on-site archiving.

2, floor scaffolding acceptance record

3, cantilever scaffold acceptance record

4, portal scaffold acceptance record

5, hanging scaffolding acceptance record

6, attached lifting scaffolding (whole lifting frame or climbing frame) acceptance record.

7, electric lifting scaffolding overall acceptance record

8, template engineering acceptance record

9, concrete compressive strength inspection report

10, template removal application report

1 1, template removal acceptance record

12 foundation pit support acceptance record

13, tower crane acceptance record

14, original record of tower crane installation and disassembly process.

15, original records of tower crane construction site inspection.

16, tower crane handover record

17, original records of safety inspection on the elevator construction site with SS SSE series materials.

18 material hoist installation acceptance record

19, foundation acceptance record

20. Inspection record of base tank

2 1 Inspection and Acceptance Record of Concealed Works

22, material hoist succession records

23. Original records of safety inspection of SC series construction elevators

24, external elevator site installation acceptance record

25, external elevator safety device test records

26, external use elevator succession records

27, planing acceptance record

28, circular saw acceptance record

29, electric welding machine acceptance record

30, steel cold drawing machine acceptance record

3 1 Acceptance Record of Steel Bending Machine

Acceptance of thirteen kinds of facilities and equipment

Detection record

(Except for temporary electricity consumption for construction)

32, mixer acceptance record performance field archive

33, small and medium-sized machinery inspection records at ordinary times

34, mechanical equipment construction (production) operation records

35, mechanical equipment maintenance records

36, safety net hanging inspection acceptance record

37, safety protection facilities acceptance record

38. Application form for commencement (installation, use and removal) of major processes

14. Temporary electricity consumption for construction

1, the system of periodic inspection of temporary electricity consumption for construction is filed on site.

2, electrician responsibilities

3, temporary electricity construction organization design (scheme)

4, the construction of temporary electricity technical disclosure

5, temporary electricity acceptance table

6, leakage protector operation test records

7, electrical insulation resistance test records

8, electrical grounding resistance test records

9, electrician daily inspection patrol record

10, electrician maintenance record

Construction of tenth five-year civilization

1, civilized construction organization design (scheme) on-site archiving

2, the guard system on-site archiving, hanging at the gate of the guard room.

3, dormitory health management system on-site archiving, and dormitory hanging.

4. The fire protection system is filed on site and hung on the site.

5. Public safety system

6, construction dust, noise, nuisance prevention measures on-site archiving.

7, safety duty system

8, the construction site safety production emergency plan

9, the construction site janitor succession records filed at the scene, the janitor duty room to save.

10, visitor registration form

1 1, night construction application report filed on site.

12, civilized construction day look-up table 13, first-class hot work permit

14, Grade II Hot Work Permit 15, Grade III Hot Work Permit

16 fire safety daily inspection record

17, civilized construction guarantee system diagram is filed at the scene and hung in the corresponding position.

18, construction site safety sign layout and floor safety sign layout

19, construction site layout