Personal Work Summary of Measurement Technician 1 After three years of study and work experience accumulation, I gradually became the main force of the company's measurement from a student with no practical experience in measurement, and completed several measurement projects. Because I work hard, seek truth from facts, bear hardships and stand hard work, the survey project I am responsible for has been praised by the entrusting party, the designer and the construction unit many times. After graduation, I worked in Gezhouba No.1 Engineering Co., Ltd. and was assigned to Dalongtan Project Department in Enshi, Hubei Province. In the first month, I learned the most basic things, including systematically understanding the use of measuring instruments, the details that should be paid attention to in field topographic survey and the compilation of indoor topographic map, and then I followed some experienced surveying engineers to learn field cataloging and compilation. This process has benefited me a lot and given me an overall understanding of the measurement work. Knowing the basic methods and work of measurement has also tempered my spirit of hard work, which will greatly promote my future work and will become a fortune for my future work.
In the last two months, under the hands-on guidance of old employees and my earnest study, I gradually mastered some basic professional knowledge and work skills, and began to complete some simple projects independently, including site reconnaissance, site selection, instrument operation, data collation, report writing, etc. Later, I often went to the foundation construction site to observe and study, and was responsible for the construction setting-out of the project and the setting-out of the foundation construction.
After a year of study and thinking, I left the Dalongtan Project Department in May of xx, where I got a deeper understanding of the investigation and got a greater play. This project has a large scale and is divided into upper and lower reservoirs. The lower reservoir is mainly a dam and diversion tunnel, and the upper reservoir has two main dams, two auxiliary dams and a permanent highway. , from the survey control network, and then the original topographic survey, vegetation is not completely removed, and ran away. There are no cars in the traffic. I leave at six every morning and come back at six or seven in the afternoon. At first, I was a little unhappy. Others are not so bitter, and I am getting used to it. Since you have chosen this position, you should work diligently and practically. Only in this way can I realize my life value. After the initial survey, I led a team to work. I was very careful and worked hard, and started the excavation stage, preparing for the construction lofting of excavation sideline and various building sideline, collecting earthwork and surveying and mapping in the office. These tasks are either very hard or very big, and it takes time and energy to finish them seriously.
On June+10, xx, 5438, I returned to the rear of the company from xx to participate in the company's international engineering training, and soon told me to go abroad to xxx. I am very happy. Since then, I have been working in xxxx Project Department, preparing relevant survey data of the Project Department, reading drawings, studying contracts, international codes, etc. I am looking forward to it for the first time. I will greet it with full enthusiasm.
At the same time, the company arranged basic knowledge and theoretical mechanics training for us at an appropriate time, which strengthened the theoretical basis of our work and further improved our professional level and work skills. After three years' work experience, from theoretical study to work practice, I have gradually become familiar with various professional technologies and skills of surveying and mapping, and have a full understanding of the industry. I participated in all kinds of projects, large and small, which gave me confidence to successfully complete all kinds of large, medium and complex projects. But I know there is still a long way to go before me, and there are still many things I need to learn. Only by continuous efforts to improve their professional ability can we be worthy of the society, the company and achieve greater results.
Survey technician's personal work summary 2 closely cooperates with the construction, and adheres to the work style of seeking truth from facts and being serious and responsible.
Before measurement, understand the design intent, study and check the drawings; Understand the construction deployment and make a reasonable survey and lofting plan.
Conduct on-site calibration of traverse control points and red line piles in conjunction with the owner or supervisor. Responsible for the verification and calibration of measuring instruments.
Cooperate closely with supervision, design, etc., make full preparations in advance, and work out a feasible survey and setting-out scheme synchronized with construction.
Pay-off and inspection shall be done well in all stages and main parts of the whole construction process, carefully check the measuring and setting-out scheme and calculation steps, strengthen the guidance and recheck of pile position and formed structure before measurement, and avoid rework.
Before setting out, the correctness of calculation must be strictly and carefully checked by various methods.
According to the actual construction progress, pay-off is actively carried out, and preventive requirements are put forward for measuring and paying-off before the start of measuring and paying-off scheme and before the construction of each major stage, so as to truly nip in the bud.
Accurate measurement of elevation: responsible for filling in the daily lofting records in time, and sorting out and improving the measurement data such as baseline review and indoor work.
Matters needing attention
1, carefully check the corresponding dimensions of drawings before lofting.
2. The calculation results must be tested by one method and multiple methods.
3, lofting need to check whether the instrument meets the requirements of lofting.
4, hot weather, rainy days must have protective measures or stop working.
5. After lofting, the instrument shall be rechecked.
6. After lofting, check whether the position is correct with reference to the drawings.
7, disclosure data must ensure that the calculation, lofting is correct.
8, nail pile must be in the original position, are not allowed to be arbitrary or greatly deviated.
9. Maintenance of appliances and instruments.
10. The instrument box is not allowed to operate.
Survey technician's personal work summary III. I graduated from the Department of Surveying and Mapping Engineering in changchun university of science and technology in XX, and now I work in xxxx No.1 Engineering Co., Ltd. After three years of study and work experience accumulation, I gradually became the main force of the company's surveying from a student with no practical experience in surveying, and completed a number of surveying projects. Because I work hard, seek truth from facts, bear hardships and stand hard work, the survey project I am responsible for has been praised by the entrusting party, the designer and the construction unit many times. After graduation, I worked in Gezhouba No.1 Engineering Co., Ltd. and was assigned to Dalongtan Project Department in Enshi, Hubei Province. In the first month, I learned the most basic things, including systematically understanding the use of measuring instruments, the details that should be paid attention to in field topographic survey and the compilation of indoor topographic map, and then I followed some experienced surveying engineers to learn field cataloging and compilation. This process has benefited me a lot and given me an overall understanding of the measurement work. Knowing the basic methods and work of measurement has also tempered my spirit of hard work, which will greatly promote my future work and will become a fortune for my future work.
In the last two months, under the hands-on guidance of old employees and my earnest study, I gradually mastered some basic professional knowledge and work skills, and began to complete some simple projects independently, including site reconnaissance, site selection, instrument operation, data collation, report writing, etc. After that, I often went to the foundation construction site to observe and study, and was responsible for the construction of the project and the foundation construction.
After a year's study and thinking, I left the Dalongtan Project Department in May of xx and went to the xxx Project Department, where I got a deeper understanding of the investigation and got a greater play. This project is relatively large, and the lower reservoirs are mainly dams and diversion tunnels. The upper reservoir has two main dams, two auxiliary dams and a permanent road. From the survey control network, then the original topographic survey, and the vegetation was not completely removed, so I ran away. There are no cars in the traffic. I leave at six every morning and come back at six or seven in the afternoon. At first, I was a little unhappy. Others are not so bitter, and I am getting used to it. Since you have chosen this position, you should work diligently and practically. Only in this way can I realize my life value. After the initial survey, I led a team to work. I was very careful and worked hard, and started the excavation stage, preparing for the construction lofting of excavation sideline and various building sideline, collecting earthwork and surveying and mapping in the office. These tasks are either very hard or very big, and it takes time and energy to finish them seriously.
65438+ 10, June xx, I returned to the rear of the company from xxx, participated in the company's international engineering training, and soon informed me to go abroad to xxx. I am very happy. Since then, I have been working in xxxx Project Department, preparing relevant survey data of the Project Department, reading drawings, studying contracts, international codes, etc. My first contact with international engineering. I am looking forward to it, and I will meet it with full enthusiasm.
At the same time, the company arranged basic knowledge and theoretical mechanics training for us at an appropriate time, which strengthened the theoretical basis of our work and further improved our professional level and work skills. After three years of work experience, from theoretical study to work, I have gradually become familiar with various professional technologies and skills of surveying and mapping, and have a full understanding of the industry. I participated in all kinds of projects, large and small, which gave me confidence to successfully complete all kinds of large, medium and complex projects. But I know there is still a long way to go before me, and there are still many things I need to learn. Only by continuous efforts to improve their professional ability can we be worthy of the society, the company and achieve greater results.
Summary of personal work of measurement technician 4. My name is xx, and I am currently the vice captain of the measurement team of xxXX Project Department of XXX Company. I have been working in the company for one year. In this year, with the care of leaders, the help of colleagues and my own efforts, I have become familiar with related businesses and can complete my work. At the beginning of xx, I came to the project department of Linlian Expressway Management Department to participate in the survey. Through this year's work, I have learned a lot of professional knowledge and summarized some experiences through practical theory. First of all, I must be familiar with the drawings, make a survey plan, and write a set of survey procedures for specific structures and road routes to facilitate the survey work. The work of this year is summarized as follows:
A, wire and field measurement control
At the beginning, because our survey department had large personnel changes and few personnel, the field situation was urgent and the task was heavy, Captain X and I actively cooperated with the surveyors of various subgrade teams, and used a few days to conduct the third and fourth leveling survey of traverse points across the line. At that time, I was still studying, and the measurement work was in the familiar stage, but I studied hard with a warm and loving attitude. This is an opportunity and a process. Traverse retest is very hard. We ran back and forth on the subgrade of 1 1 km with heavy instruments on our backs. At first, I was not familiar with measuring instruments and wire retesting. Because I don't have time to explore slowly, I work overtime in the office every night, read books on measurement and instruments, learn the setting and use of instruments, and go out to measure wires with Captain X during the day. I have been paying attention to how he uses instruments and how to measure wires with instruments. During the whole traverse survey, Captain Yang and I both found that the traverse in many places was artificially destroyed or displaced, as well as the traverse buried in the forest due to seasonal changes in winter. Because the leaves were dense in summer and the crops in the crops were blocked, it was impossible to survey again, so we had to re-encrypt and rearrange the traverse points, which indirectly caused a large traverse deviation. Through two traverse surveys, we must observe and pay attention to whether the geographical location will be invisible in the future when learning lessons. The key of conductor embedding lies in the selection and control of conductor position. According to the needs of the project and the requirements of the supervisor, we made a serious joint survey of the traverse and elevation of the whole line, and reported the results of the joint survey to the supervision team for review in time, which made a good foundation for the smooth construction of the project in the future.
It is equally important to observe reconciliation. According to the requirements of provincial high index, actively cooperate with the settlement observation work of provincial high index. In the process of settlement measurement, because the settlement plate was originally buried by each subgrade team, the subgrade in charge of the third subgrade team was buried by their subgrade team. After the third subgrade team finished its work, it failed to hand over the specific positions of the settlement points of the survey team in time, resulting in the loss of several settlement points in the paragraphs it was responsible for. It also brings unnecessary trouble to our settlement measurement. For the future settlement work, it is necessary to bury the settlement disk in time, count the settlement data and file the settlement ledger in order to find evidence.
In the field construction, each construction team should contact our surveyors half a day or one day in advance to cooperate with their work, so that we can arrange the work plan reasonably and make it orderly. Don't wait until today to inform us that we need to cooperate with the survey work, which will disrupt our work arrangement and delay the construction progress on site. In the future work, our survey team will explain this to them in writing or other forms in advance, and the normal construction inspection of the bridge on site can be paid off for inspection in time.
Second, the data calculation and information in the industry, ledger
In the indoor work, our survey team can be serious and responsible, prepare construction lofting sheets and leveling records in time, and memorize every drawing and specification. Due to the progress of on-site construction, the workload of our indoor data has also increased, and every colleague of our survey team has worked overtime to carefully sort out, record and archive every piece of data. Our data has been greatly recognized in the supervision, and the company has provided accurate measurement software for our measurement team. It has brought great convenience to the investigation work of the investigation team, improved the work efficiency of our investigation team and ensured the accuracy of the investigation data. In order to exercise our calculation ability, * * * carefully studied the calculation formula of the survey, worked out every data, and rechecked it with the survey software, so as to be foolproof and make no mistakes. After some data at the end of the project were archived, we put one in the checklist because we needed a survey construction lofting sheet. Unexpectedly, when handing over the materials, we neglected to register some of the materials handed over, which led to the loss of some original materials. I don't know who lost it and need our investigation team to make it up again. This is the unshirkable responsibility of our investigation team. We hope and will do this in the future office registration and bookkeeping, and we must not be careless and lazy. Once the data is lost, we will have to rework it all, and laziness will be small. But once an accident happens, it is a question of responsibility, which is also a lesson for us. In the future, the members of the investigation team will carry out all the work in strict accordance with the indoor work system.
Third, the measurement department management
When it comes to department management, we should learn from leaders with an open mind. We began to take charge of the overall work of the survey department in 20xx 10. As the head of a department, we still have a lot to learn. Although I lack experience in department management, we often consult and communicate with leading colleagues. No problem. What we feel most now is management. How to do it well if the management is not good? At the very least, I will set an example, work hard, be proactive and conscientious, and set a good example for every colleague in the department. Although I am the vice captain of surveying, regardless of my colleagues' age and experience, there is something we need to learn. We will try our best to make up for our own shortcomings, strengthen our professional knowledge and live up to the expectations of our leaders. It has been a busy year to be a qualified person in charge of the measurement department in the future work, and the members of the measurement team have a deep understanding. Measurement is a complex and arduous technical work, which requires not only a comprehensive understanding of professional knowledge and measuring instruments, but also frequent on-site observation, attention to the on-site situation and the measurement work that needs cooperation. For the survey work, we need to always maintain a meticulous and serious attitude towards every work of this project, strictly control the elevation and plane position of subgrade, small structures and bridges, strictly demand the construction according to the drawings, provide more accurate data, and seriously abide by and implement the rules and regulations of the survey team. Busy work makes us feel that time flies, and a year has passed in a blink of an eye. This year, I learned a lot of professional knowledge at most, and also absorbed some practical experience in my work. I hope that the on-site quality inspector of our project department knows more or less about the measurement. Surveying is not only as simple as setting out and controlling elevation, but also plays an important role in engineering. Just like the pile foundation of a bridge, a good pile foundation can ensure a good start. No matter how well the superstructure is made, the pile foundation will fall down one day! Unite and cooperate, win with one heart, peak the team and create the future together! Colleagues should shout slogans to us, communicate more, talk about some difficulties, and think about how to solve them together, so that we can learn more lessons and grow up quickly.
With the end of our project, the bell of 20XX New Year is about to ring. The new year is a new beginning, and new projects and new jobs are all started from scratch. We will make up for the defects and deficiencies in our work in the past year, learn from the lessons of the past year, accumulate the experience of the past year, and bring it all into our new work to prevent similar situations from happening again in the future. The investigation team will be proactive in its future work. Ask if you don't understand, and consult the leader humbly. Through all kinds of problems that happened this year, it actually reflects that we still need to constantly learn and enrich ourselves. Every link is very important, from on-site measurement control to the arrangement of internal data account, and then to the management of measurement department. First of all, poor on-site control directly affects the preparation and signing procedures of internal materials, and poor internal work also directly indicates that there is a problem with departmental management, which is interlocking and crucial. Everyone in our investigation team is aware of its importance, and we will treat our future work with a new look. Finally, thank you for your support and encouragement over the past year, which enabled me to break through myself. Our survey team will do its best to contribute to road and bridge construction and company development.
Five years passed in a blink of an eye. I have been engaged in measurement technology since I came to the company. Technology is the core strength of the company. For mining enterprises, geology, surveying and mining are the foundations of mining enterprises. With the care of my leaders and the help of my colleagues, I have made some achievements in all aspects. What have I done in these five years? What achievements and experiences have you gained from your work? What are the shortcomings and deficiencies in it, so as to do better in the future, continue to maintain advantages, overcome disadvantages, gradually improve their technical level and business ability, and keep up with the pace of the company's development.
During the five years of working in Yunnan Hualian Zinc-indium Co., Ltd., I have always kept in mind the main idea of measurement, carefully applied measurement theory and related business knowledge, and analyzed the * * * and non-* * characteristics of coal mines and non-coal mines. I have mastered some deeper knowledge and skills of mine survey through the actual survey operation in underground and ground at ordinary times. Because the surveying work can not be completed by one person's strength and conception, only the cooperation and unity of team members can complete the work quickly and efficiently, so all the work must be closely coordinated, which requires the surveyors to be serious, responsible and careful in their work and lay a good foundation for the next work.
The following is a summary of my personal work in recent years:
I. During my work in the company, my work as a survey technician was as follows:
1. Under the leadership of the leaders, the quarterly stope grid inspection was completed on time: the grid inspection area reached 4.5 square kilometers, and field sampling was carried out according to the ratio of 1: 500. The average distance between points is 0.5 m ×0.5 m, covering 4.5 square kilometers requires 65438+ million points, and per square kilometer,
2. Update the topographic map of the mining area once every quarter: because there are too many points to be updated each time and need to be accurate, the coordinates (x, y, z) must be checked before they can be replaced. This work is very tedious and time-consuming. Now we begin to use two mining softwares, 3DMine and Surpac, to work with the traditional CASS software and learn from each other.
3. Topographic survey of the dump: According to the design requirements, topographic survey of the whole dump is carried out. It is very dangerous to measure the spoil ground. If you are not careful, you will be hit by falling stones.
4. Monitoring of all tailings ponds in the company: monitor the displacement and operation of all new and old tailings ponds in the middle of each month and submit a report. During the monitoring, it was found that the dam crest of the foundation dam of Dagou tailings pond in Tong Jie sank, and the reasons were found in time to eliminate the danger. It was found that the dry beach slope of Wanlongshan tailings pond failed to meet the standard twice, and the report required Daping workshop to rectify it.
5. Assist in completing the mining and stripping plan: Survey is the first-hand information of design, and assist Geology and Minerals to complete the mining and stripping plan twice, which has been affirmed by the company's top management.
6. Geological logging and lofting: assist geology in geological logging and mining construction lofting.
7. Weekly planning: Every Thursday, the terrain of the mine stripping place should be updated once, so that miners can make mining design.
8. We have also completed the relevant survey work of sporadic projects in various departments and workshops.
Second, adapt to the needs of development and constantly learn new knowledge.
With the continuous development of society and the continuous updating of knowledge, new technologies, new processes and new materials have appeared in mine survey. As a skilled worker, if you don't study and supplement in time, you will not be able to meet the development needs of society and enterprises. I use my spare time to learn and skillfully operate total station, CAD electronic drawings and CAD multi-layer composite drawings. Our investigation team actively participated in various training, education and cultural and sports activities organized by the company, which was well received by the company's trade unions and youth league committees. However, we still need to further strengthen our own surveying and mapping level and expand our professional knowledge. Now I am learning from two mining softwares, 3DMine and Surpac, and strive to make knowledge develop horizontally in the next one to two years, so that it can handle certain geological work and mining design work, which has been well received by the company's trade unions and youth league committees. I took the time to learn from my colleagues in geology and mineral resources and make progress together, so that my professional level has reached a new level.