Team Commitment Letter 1 Our team contracted the formwork fabrication and installation project of Building # in Huangdui Community. In order to complete the task with good quality and quantity and better cooperate with the project department, we made the following commitments:
1. In the process of template production and installation, ensure the completion of the contracted floor according to the weekly schedule of the project department. If it is not implemented according to the schedule of the project department, 500 yuan will be fined for every day of delay.
2. Our team actively cooperates with the construction of other types of work, obeys and cooperates with the management of on-site management personnel. If there is any ambiguity, we will ask questions and negotiate with technicians at any time, and we shall not change the intention of the drawings without authorization, and timely rectify any quality problems, and we shall not argue irrationally. If the rectification notice is refused or the rectification fails to meet the requirements within the specified time, the technical management personnel have the right to arrange personnel for rectification at a high price, and will be given an economic penalty of 200~20xx yuan according to the seriousness of the case, and bear the direct and indirect losses caused to the project.
3. Do not refuse to accept the relevant rectification notice issued by the project, or you will be fined 65,438+0,000 yuan each time, and bear all the responsibilities arising therefrom; After receiving the notice, you must designate a special person to implement it and reply in time within the specified time. Those who fail to execute or reply within the time limit will be fined 200 ~ 1000 yuan each time.
4. Ensure the template installation quality and pass the supervision acceptance at one time. If the acceptance is unqualified due to axis position, verticality, section size, bent frame erection and other reasons, all consequences shall be borne by our team.
5. Panels, bay windows, air-conditioning panels, parapets and other nodes and the main body are formed at one time to ensure that they are not missed. Not according to the drawings, each fine of 200 ~ 1000 yuan; The blue prints.the design, project issuance, design change, project negotiation, etc. It must be strictly enforced. If it is not implemented, it will be fined 500~20xx yuan each time.
6. Template, wood square material is reasonable, don't waste materials. Long material, aniseed must use wooden template, wood square. If there is any waste of sawing, it will be fined every time 100 ~ 500 yuan.
7. Formwork support must be carried out in strict accordance with the construction scheme, technical disclosure and construction specifications to ensure no formwork explosion or leakage. In addition to the quality penalty, the concrete leakage of 1 0,000 yuan /m3 shall be deducted from the project payment of the responsible team, and the repair and treatment expenses shall be borne.
I have carefully read and abided by the above commitments. If I seriously violate the above commitments and the Measures for Rewards and Punishment of Construction Site Management, I will voluntarily accept the punishment of the Project Department and bear the corresponding consequences that may result therefrom.
Commitment:
Date:
Team Commitment Chapter II I: Home Address: ID Number:
As the contractor of the subordinate team of Anhui Wuwei Construction Labor Service Co., Ltd., I took the lead in contracting projects. In order to ensure the realization of the management objectives of the project, on behalf of all the staff of ZuoYeDui, I made the following written commitments to the labor service company and the contractor's project department:
1. Before signing the construction labor contract agreement, I paid the target management performance bond (4% of the total contract amount) and the deposit (1% of the total contract amount) to the general contractor project department at one time. The return time of the deposit is subject to the provisions of the agreement;
2. I have understood the requirements of construction drawings, time limit for a project, project quality and target management, strictly implemented the contract price determined by the agreement, never bargained when settling accounts, and put an end to disputes with the project department;
3. Before the employees enter the site, the team is responsible for compiling the employee roster and submitting it to the labor manager of the project department together with the original employee ID card. Every employee in the team should have an ID card, and the on-site laborers should be relatively stable to meet the needs of construction progress;
4, strictly implement the company's' life logistics management' rules and regulations, obey the logistics administrator to arrange staff dormitory; No dragging in the dormitory, no cooking, cooking and boiling water with electrical appliances, no liquefied gas stoves, no mixed sex, no stealing and gambling, no fighting. Once found, it will take the initiative to punish;
5. I promise to manage the team at the construction site, arrange the production, grasp the progress and ensure the quality and safety. In special circumstances, if I leave the site without authorization, I will voluntarily accept the punishment of 200 yuan/day and ask for leave from the project department before leaving the site;
6. The project I contracted will not be subcontracted to a second party, and the piecework system will be adopted, and I will be responsible for organizing the construction of employees. Once I find subcontracting, I will voluntarily accept the punishment of the project department, including fines and repayment as illegal acts;
7. Carry out the management requirements of the company, make the employee payroll within the specified time every month, and submit it to the project department for review to ensure that the salary is paid to each employee, and there will be no work account disputes and wage disputes;
8. Before the employees enter the site, I am responsible for signing the construction labor contract with each employee, and handling the three-level safety education card for employees while conducting safety education for employees. I won't arrange employees to take up their posts before signing the employment contract and conducting safety education. Once found, I will voluntarily accept the punishment of the project department;
9. According to the requirements of engineering quality management procedures, each working procedure team has self-inspection and inspection procedures, and does not enter the next working procedure without the consent of the project department; The rectification opinions put forward by the project department shall be guaranteed to be completed with good quality and quantity within the specified time, and they shall be willing to bear the responsibility that the rectification delay will affect the construction period, and accept the punishment and pay the helper fees arranged by the project department;
10. If the project quality is poor or reworked due to the team's own reasons, the project cost shall be borne by the team. In addition to accepting punishment, the team will also obey the helper arrangement of the project department, and the team is willing to bear the wages and consumables of the helper;
165438+
12, strictly implement the material quota according to the terms of the agreement, the team that exceeds the consumption index shall be responsible for compensation, and the waste found in the construction process shall be punished by the on-site management personnel;
13. As an annex to the construction labor contract agreement, this undertaking is equally binding.
Commitment:
Contact telephone number:
Commitment time: year month day
Team Commitment Article 3 Team Name:
The wages of all our team members have been paid in full in May and before May of the second Oxx year, and we promise not to default on the wages of migrant workers. If there are any petitions and other accidents, we will take full responsibility.
Amount received (in figures):
Person in charge of labor service unit (signature):
Person in charge ID number:
Commitment letter (signed by the team leader):
Date:
Contact telephone number:
ID number:
20 15 Work Area Commitment Letter of No.4 Team in Mechanical and Electrical Maintenance Area As the team leader of the Mechanical and Electrical Maintenance Area, in order to conscientiously implement the laws, regulations, standards, policies and related system requirements of the group company and the mine on safety production, actively implement the main responsibility of safety production, strive to do a good job in on-site safety production, and reduce and eliminate safety production accidents, we hereby solemnly promise:
1. Earnestly implement the safety production policy of "safety first, prevention first, hands-on by all employees and comprehensive management", abide by various safety production systems and regulations, and achieve "four no injuries", that is, do not hurt yourself, others, others.
2, no illegal command, no illegal operation, no violation of labor discipline, resist illegal command, correct illegal behavior.
3. Strictly implement the safety operation ticket system. The 27 abnormal operation items specified in the mine must all be operated according to the specified procedures, and unlicensed operation is not allowed.
4. Dress for posts according to regulations, wear labor protection articles, and strictly abide by the prohibitions and regulations on fire prevention, explosion prevention and safety of underground transport vehicles.
5, take the initiative to accept safety education and training and assessment, show certificates. I can call the emergency rescue telephone, use the direct dial telephone, save myself and each other, and skillfully use the facilities and equipment such as self-rescuer and fire extinguisher.
6. It is my important commitment to strictly fulfill the post safety responsibility, that is, the system of "one post and two responsibilities" for safety production.
7. Check the operating equipment regularly, handle the problems in time when found, and report to the relevant leaders of the office and operation department in time if they cannot be handled.
Oath of safety commitment: I have received safety education in this post and am familiar with safety commitment.
Commitment letter of Team Five: Our team contracted the formwork fabrication and installation works of Shang Ceng Minglou 1, 3 # and 4#, as well as commercial outlets and underground garages. In order to complete the task with good quality and quantity and better cooperate with the project department, we make the following commitments:
1. In the process of template production and installation, ensure the completion of the contracted floor according to the weekly schedule of the project department. If it is not implemented according to the schedule of the project department, 500 yuan will be fined for every day of delay.
2. Our team actively cooperates with the construction of other types of work, obeys and cooperates with the management of on-site management personnel. If there is any ambiguity, we will ask questions and negotiate with technicians at any time, and we shall not change the intention of the drawings without authorization, and timely rectify any quality problems, and we shall not argue irrationally. If the rectification notice is refused or the rectification fails to meet the requirements within the specified time, the technical management personnel have the right to arrange personnel for rectification at a high price, and will be given an economic penalty of 200~20xx yuan according to the seriousness of the case, and bear the direct and indirect losses caused to the project.
3. Do not refuse to accept the relevant rectification notice issued by the project, or you will be fined 65,438+0,000 yuan each time, and bear all the responsibilities arising therefrom; After receiving the notice, you must designate a special person to implement it and reply in time within the specified time. Those who fail to execute or reply within the time limit will be fined 200 ~ 1000 yuan each time.
4. Ensure the template installation quality and pass the supervision acceptance at one time. If the acceptance is unqualified due to axis position, verticality, section size, bent frame erection and other reasons, all consequences shall be borne by our team.
5. Panels, bay windows, air-conditioning panels, parapets and other nodes and the main body are formed at one time to ensure that they are not missed. Not according to the drawings, each fine of 200 ~ 1000 yuan; The blue prints.the design, project issuance, design change, project negotiation, etc. It must be strictly enforced. If it is not implemented, it will be fined 500~20xx yuan each time.
6. Template, wood square material is reasonable, don't waste materials. Long material, aniseed must use wooden template, wood square. If there is any waste of sawing, it will be fined every time 100 ~ 500 yuan.
7. Formwork support must be carried out in strict accordance with the construction scheme, technical disclosure and construction specifications to ensure no formwork explosion or leakage. In addition to the quality penalty, the concrete leakage of 1 1,000 yuan /m3 is deducted from the project payment of the responsible team, and the repair and treatment costs are also borne by the responsible team.
I have carefully read and abided by the above commitments. If I seriously violate the above commitments and the Measures for Rewards and Punishment of Construction Site Management, I will voluntarily accept the punishment of the Project Department and bear the corresponding consequences that may result therefrom.
Commitment:
Date:
Team commitment letter 6 commitment letter
Sichuan Yilong Yongchun Labor Service Development Co., Ltd.:
Type of work: _ _ _ _ _ _ Team leader's name: _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ Number of team members: _ _ _ _ _ _ Our team voluntarily cooperates with your company to complete _ _ based on the principle of "safety, quality and progress first".
1, our team fully implements all the contents of the contract documents.
2. Our team promises to enter the site in time according to the requirements of your company, to ensure that the number of people in the team is _ _ _, and the personnel stability rate is above 98%, and to ensure that no old, weak, sick and disabled construction personnel enter the construction site, otherwise our team is willing to bear all the responsibilities and expenses of all accidents caused by the above reasons.
3. Duration commitment: The construction shall be carried out in strict accordance with the construction drawings, negotiation, change, construction design scheme, technical disclosure and relevant requirements. Ensure that the duration of the subcontract is _ _ _ _ _ days.
4. Project quality commitment: ensure that the sub-items reach the _ _ _ _ _ _ _ standard and ensure the completion acceptance.
5. Commitment to safe and civilized construction: ensure that no work-related injuries and heavy casualties occur on the construction site, and take full responsibility and expenses for all safety accidents that occur or are caused by itself.
6, our team put an end to all fighting, drinking, going out without permission, and bear all the responsibilities and expenses caused by fighting, drinking, going out without permission; The perpetrator cleaned up the scene within 2 hours.
7. Because of our team, we can't meet the standards and plans of your company's construction period, quality and civilized construction, and still cause obstacles or serious losses after adjustment and correction. Our team took the initiative to cancel the contract and leave, and your company only settled according to 60% of the qualified quantities actually completed by our team.
8, consciously abide by the contractor, supervision, your company's project department management personnel about the time limit for a project, quality, safety and civilized construction of the management system; And obey the command and management.
9. Save materials, water and electricity: put an end to all waste of materials, and our team will compensate for the waste, excess and theft of materials according to the terms of the contract.
Commitment and team representative (seal):
date month year
Team Commitment 7 Limited:
I am in charge of the construction of this project, which has been completely completed. My commitment to engineering quantity, engineering quality, wages of migrant workers, invoices and materials is as follows:
1. If the reported quantity exceeds 5% of the verified quantity-10% (including10%), a penalty of 30% of the excess shall be paid.
2. If the reported quantity exceeds the verified quantity by 10%-30% (including 30%), a penalty of 40% of the excess shall be paid.
3. If the reported quantity exceeds 30% of the verified quantity, a penalty of 50% of the excess shall be paid.
4. If there is any underreporting or omission of engineering quantity, the underreported engineering quantity shall be returned after verification by the functional departments of the company, and 20% of the underreported engineering quantity shall be voluntarily borne as related expenses such as review and measurement.
5. I will organize the construction in strict accordance with the construction drawing, change contact list and national construction acceptance specifications during the construction process, and keep all matters such as project quality, safe and civilized construction and intellectual property confidential, and never disclose them to a third party, otherwise all the responsibilities arising therefrom will be borne by me, and the losses caused will be compensated by me.
6. I guarantee that the wages of migrant workers in our team will be paid in full, and there will be no phenomenon of migrant workers petitioning. If there is petition, my borrowing behavior has nothing to do with the company, and I am willing to compensate the company for the loss of 1000 yuan per person.
7. The invoice provided by this project is absolutely true and legal. If there is any falsehood, once it is verified by the relevant departments, it will take the initiative to compensate the company for 50% of the face value and bear legal responsibility.
8. I accept the warranty responsibility, waste of materials, compensation for breach of contract and other related expenses without objection.
Commitment unit (person): year month day.