In daily study, work and life, people gradually realize the importance of meeting minutes, which are narrative and introductory documents processed and sorted out on the basis of meeting minutes. Don't you know when you will draft the minutes of the meeting? The following is a sample essay (6 selected articles) of the minutes of the on-site safety production meeting organized by me for you. Welcome to reading. I hope you will like it.
1 Minute of on-site safety production meeting: 20XX.4.30
Location:
Moderator:
Recorder:
Content:
First, Cao Yongsheng, the project manager, introduced the company's safety requirements.
1. Make sure that every intersection on the construction site has signs and guide card.
2. The construction team must wear safety helmet and safety warning clothing at the construction site.
3, temporary water and electricity must arrange someone who's in charge.
4, do a good job in the project department office life, to ensure the freshness and quality of food; Fire prevention and anti-theft measures should be taken in offices and living quarters.
The project manager divides the work among the employees and puts the responsibility on people. If there are hidden dangers, eliminate them in time. It also introduces the parts that are prone to hidden dangers. Ma Boru, the person in charge of project safety, put forward the following requirements for the construction personnel entering the site:
1. Operators entering the construction site must attend safety education and training first, and can only work at their posts after passing the examination. Those who have not been trained or failed the examination shall not be allowed to work at their posts.
2, personnel engaged in special operations, must carry out physical examination, no disease that interferes with this type of work and has a suitable educational level.
3./kloc-Minor workers under the age of 0/8 are not allowed to engage in construction work.
4. Obey the command of leaders and safety inspectors, concentrate on their work, stick to their posts, do not engage in non-work tasks without permission, and do not work after drinking.
5. Construction personnel must be familiar with the safety operation procedures, safety technical disclosure and the safety production management system of the construction site, do not operate illegally, have the right to refuse the instruction of illegal operation, and have the responsibility to stop others from operating illegally.
6, team (team) leader, every day before going to work, must convene all the staff of the team (team) under his jurisdiction, in view of the construction task of the day, combined with the content of safety technical measures, the working environment, facilities, equipment safety status and the technical quality, safety knowledge, self-protection awareness and state of mind of the team (team) personnel, to carry out targeted pre-shift education activities, put forward specific matters needing attention, and follow up and implement them well.
7, team (team) and team (team) full-time (part-time) security officer must carefully check the working environment, facilities and equipment before going to work every day, and solve the unsafe hidden dangers immediately; Major hidden dangers should be reported to the superior leaders to solve, and risky operations are strictly prohibited. In the process of operation, patrol inspection shall be conducted to correct violations at any time and solve new unsafe hidden dangers; Before coming off work, check whether the electromechanical switch is turned off, whether the door is locked, whether the fire is extinguished, whether the construction waste is produced and sold, and whether the site is cleared after work, and then leave the site after confirmation.
8, enter the construction site personnel must wear safety helmet correctly, fasten the chin strap; Wear personal protective equipment correctly according to the operation requirements and dress neatly; Fasten your seat belt when working at heights [2m above or including 2m] without reliable safety protection facilities; It is forbidden to wear shoes with hard soles and hard nails that are easy to slide when working at height, and it is forbidden to throw materials down. It is forbidden to wear slippers and high heels barefoot to enter the construction site.
9, walking in the construction site should pay attention to safety, not climbing scaffolding, tic-tac-toe frame, gantry.
10, all kinds of safety facilities, equipment, warning signs and safety signs on the construction site shall not be dismantled and moved at will without the consent of the superior leaders.
1 1, before the construction work, carefully check whether the safety protection of the hole, limb, scaffold fence, baseboard and set net is complete and firm; Whether scaffold boards are properly spaced and fastened as required, and whether there are probe plates and gaps.
12, gale, rainstorm, heavy snow and foggy weather with magnitude 6 or above, open-air heights and hoisting operations should be stopped.
13. If unsafe dangers are found during operation, you must immediately stop the operation, evacuate the dangerous area, report to the leader for solution, and do not take risks.
14, scaffolding without acceptance is strictly prohibited.
15. When working in ditches, troughs and pits, the stability of the walls of ditches, troughs and pits must be checked frequently, and ramps or ladders must be used for going up and down ditches, troughs and pits.
16, smoking is strictly prohibited in the construction site, and smoking is allowed in the smoking room.
17, fire in the construction site, should apply for a fire permit, assign personnel to watch the fire, it is strictly prohibited to fire in places where fireworks are prohibited.
18, the general contractor shall be responsible for the safety production on the construction site, and all subcontractors shall obey the management, supervision and inspection of the general contractor.
19. In case of casualties on the construction site, it is necessary to report to the leader immediately to rescue the wounded and protect the site.
Participants:
recorder
observer
Minute time of the second on-site safety production meeting: February 8, 20xx
Venue: conference room on the second floor of xx Street
Moderator: Director of Chen xx Sub-district Office
Recorder: Xie Pingze, deputy director of xx sub-district office.
Participants: all cadres of the street office; Person in charge of production safety in the village (community)
In charge of leadership; Captain and vice captain of all production teams in each village.
Conference theme: recent gas safety management to prevent carbon monoxide poisoning.
Meeting contents:
1, Deputy Director Xie Pingze, the leader in charge of production safety in xx Sub-district Office, conveyed the spirit of the emergency meeting on production safety in urban areas on the evening of February 7, and reported the carbon monoxide poisoning accident in xx village 1 1 team on the evening of February 7.
Since the beginning of this year, gas poisoning accidents in Quannanning City have caused 38 deaths, including 6 deaths in Xixiangtang District (4 accidents). The accident mainly happened in the rental house in the village. On the evening of February 7th, two people died of carbon monoxide poisoning in xx Village 1 1 Team, and the city leaders attached great importance to it. They called the municipal leading group and the main leaders and leaders in charge of the street offices to hold an emergency work meeting on production safety overnight to study and deploy accident handling work and make clear instructions on strengthening gas safety work. It is required to achieve "three households", that is, "warm tips to households, publicity materials to households, and letters of commitment to households".
2. Chen, director of 2.xx Sub-district Office, delivered an important speech. The next step of the sub-district office is to do a good job of publicity, post publicity materials and distribute them to the residents in each village (street). Village (community) cadres should do their best to do this work and ensure that it is distributed in place before tonight. The following points are necessary:
(1) attaches great importance to it and works hard.
(2) extensive publicity and proper work.
(3) Check in place. Including warehousing and logistics, enterprises, hotels, rental houses, etc. Must be inspected.
Meng Yan, secretary of the Party Working Committee of xx Street, made a concluding speech.
In the death accident of carbon monoxide poisoning in xx village on the evening of February 7th, the two deceased were young people of about 2 1, so the gas safety publicity should focus on young people and the elderly. The following work is required:
(1) After the meeting, all villages and communities should hold relevant working meetings immediately. In addition to cadres, all building directors and production captains should attend.
(2) Leaflets should be sent to each rental house, and the villages should open an account in the afternoon.
(3) Tomorrow (February 8) morning, the city will supervise our office, so all villages and communities must publicize it in place.
(4) Measures are in place. When the publicity materials of villages and communities are distributed to rental houses, the owners must be required to sign for them. At the same time, the owner should also sign a contract with the tenant.
(5) All rental owners must do a good job in supporting safety facilities, such as fans and exhaust fans.
(6) Investigate and deal with hidden dangers, and do a good job of rectification.
(seven) do a good job in rental housing registration.
Xx sub-district office
20xx February 8th
Minutes of on-site safety production meeting 3 Name of meeting Safety meeting
Meeting time: afternoon of February 5th, X year.
Meeting place project department
Principal holder
record
Attending member
Meeting contents:
The safety management planning stage of our project department is basically completed: the responsibilities of the safety organization and related personnel have been determined; Relevant safety systems have been established and improved; All kinds of personnel have received safety training and education; Hazard identification and risk assessment have been completed, and major hazards have been effectively controlled and managed; Special construction scheme has been prepared for dangerous projects; Various emergency plans have been prepared and carefully rehearsed. Some deficiencies in industry and site management have been rectified and implemented with the guidance and help of leaders at all levels. The recent work related to production safety is reported in detail as follows:
First, attach great importance to nip in the bud.
Project department leaders and departments attach great importance to it and strengthen organizational leadership. Pay close attention to the implementation of safety work with the sense of responsibility that "construction safety is more important than Mount Tai, and people's lives and property are above everything else". Effectively refine the safety responsibility, decompose the responsibility layer by layer, clarify the standards and norms, and truly implement the supervision of safety production responsibility to every post, every work link and every responsible person. The deputy manager in charge of safety personally led a team to inspect the construction site many times, investigated and dealt with many hidden dangers, effectively eliminated hidden dangers before they occurred, and ensured the construction safety.
Second, supervision is in place and implemented safely.
All departments should strengthen management and safety supervision. The security department strengthens safety supervision, strictly implements the safety responsibility management system, determines the leaders, responsible persons, specialized agencies and personnel in charge of fire safety supervision, implements the fire safety supervision team, and implements the duties and tasks of fire safety production supervision. Take a variety of ways to carry out inspections and spot checks, notify the departments that do not implement the work, and hold the relevant responsible persons accountable.
Three, safety self-examination, found that the problem on the spot rectification.
Fire safety self-inspection has been carried out many times in each work area. Self-inspection focuses on the construction site, mixing station, oil depot and other key parts, as well as all office places, staff canteens and dormitories. Take precautions before they happen. Immediately rectify the problems found in the inspection until they meet the requirements.
Four, the key investment, the main station to strengthen the distribution of special care.
In view of the construction site of each work area and key fire-fighting parts such as oil depots and mixing stations, we will increase investment in safety precautions, enrich rescue teams, strengthen rescue equipment, clarify responsible persons, and establish a long-term working mechanism for fire safety and emergency response.
Verb (abbreviation of verb) Report on the rectification of the problems raised in the safety inspection of the Provincial Communications Department
On April 2 1 day, the safety inspection team of the Provincial Communications Department conducted a comprehensive inspection on the safety production of our bid section, and put forward valuable opinions and suggestions. According to the requirements and instructions of the department leaders, our project department set off another round of hidden dangers rectification work climax.
1. Hold a meeting in time to deploy the rectification work. After the inspection by the inspection team of the Communications Department, the leaders of the project department attached great importance to it, organized a special work meeting to study and deploy the rectification work, and appointed the deputy project manager in charge of safety to take the lead and form a working group to be responsible for it.
2. Seriously carry out supervision and inspection. The working group shall inspect and supervise the safety work in each work area, handle the work on site and solve the problems on site.
3, pay close attention to the safety emergency plan revision and exercise. Our project department completed the revision of various emergency plans in late April, and organized relevant leaders, emergency teams and full-time security personnel to study and drill according to the work arrangement.
Sixth, the focus of the next step
In the next step, our safety production management has entered the stage of risk control and inspection. We will continue to take construction safety as the top priority of all work and strive to do the following work.
1. Strengthen the safety management of engineering construction, and actively carry out irregular special inspections based on the progress of the project on the basis of consolidating the existing safety inspection mechanism.
2. Strengthen the responsibility for production safety, strive to implement the responsibility system and safety assessment objectives of the work area and construction team under its jurisdiction, earnestly do a good job, track hidden dangers and rectify them, and ensure the realization of the annual safety production objectives.
4. Intensify the rectification of potential safety hazards. Further strengthen construction safety management, carry out in-depth safety inspection, carefully investigate potential safety hazards, establish management files of major hidden dangers and major hazard sources for existing accident hazards and hazards, and have special personnel to monitor them to ensure safe production of enterprises.
5. Strengthen safety precautions to ensure production safety. Take effective measures to rectify the safety problems found immediately to prevent penny wise and pound foolish. Further pay special attention to the three-level education of employees, and order those who violate the rules with poor safety awareness to stop work, study and re-educate, and they can only take up their posts after passing the examination.
6, conscientiously do a good job of fire control on duty. A 24-hour fire duty system has been established, and the fire duty room and personnel on duty have been implemented. The working group has also conducted spot checks on the duty of each work area many times to ensure that the duty is foolproof.
3. Pay special attention to the safety skills and safety protection knowledge training of front-line operators, and constantly improve their awareness of prevention. Strive to complete the construction task on time with good quality and quantity, and live up to a road builder.
Minute time of the fourth on-site safety production meeting: 20XX May 10
Venue: Office of Project Department
Participants: heads of various departments of the project department, construction team leader, etc.
Moderator: XXX
Recorder: XXX
Specific content:
The safety inspection in May was conducted in the morning of this month 10. Participants in this safety inspection are: heads of various departments of the project department, construction team leader, etc. *** 10 people. After the on-site inspection, XXX, manager of the project department, presided over a special meeting on production safety. The minutes of the meeting are as follows:
Construction of beam slab prefabrication yard of Dongkou Third Bridge started. As the site is located in Dongkou Village, it is necessary to strengthen site safety management to ensure construction safety. Site management personnel should always keep in mind the principle of "safety in production, prevention first".
1, personnel entering the construction site must correctly wear qualified safety helmets, fasten chin straps and lock buckles;
2. Personal protective equipment must be used correctly according to regulations, and the clothes should be neat. It is forbidden to enter the construction site barefoot, wearing slippers and high heels;
3, in the absence of reliable safety protection facilities of high (more than 2 meters including 2 meters) and steep slope construction, must fasten the qualified seat belt, the seat belt should be fastened, high hanging low use, at the same time, high work shall not wear hard bottom and nail shoes, wear non-slip rubber shoes;
4, the new approach of homework personnel, must first attend the entrance safety education and training, after passing the exam can mount guard, without education and training or exam unqualified, shall not work at his post;
5, personnel engaged in special operations, must hold relevant certificates, it is forbidden to operate without a license, it is forbidden to operate machinery and equipment that has nothing to do with themselves;
6, smoking is prohibited on the construction site, it is forbidden to chase slapstick, it is forbidden to drink homework;
7. Various safety protection facilities and safety signs on the construction site. Without the approval of the leader and safety officer, it is forbidden to dismantle and move.
8. For reconstruction projects with one side widened or two sides widened, the pavement of the original road should be reserved first to maintain traffic.
9. In the widened section, if you need to transport earthwork on the original road, you should use motor vehicles to transport it. If it is transported by trolleys, part of the road surface can be divided for trolleys, and the following measures should be taken:
10, the rest of the road width should ensure the safety of motor vehicles.
1 1. Use red and white railings and other isolation facilities to separate from motor vehicles.
12, with full-time personnel to direct traffic.
Minutes of on-site safety production meeting 5 Training time:
1October 8th 20xx 65438+9: 30.
Location:
Xx company office
Speaker:
Xxx (project manager)
Participants:
Xx, etc
First, the purpose of training:
Strict management, comprehensive implementation of the specific work of safety production, so that all personnel fully realize the importance of safety production, put an end to hidden dangers of safety production. Strengthen the safety production training for construction personnel, and understand how to prevent and manage, as well as the handling and rescue measures in case of safety accidents.
Second, the training content:
1, fully understand the importance of safety in production.
2. Strengthen the safety production training of construction workers.
3. A safety production license is required.
4. Carry out in-depth rectification and investigation of hidden dangers in production safety.
5. Strictly implement the company's relevant specifications and put an end to the "five noes" project.
6, each unit should have the responsibility system for production safety, production safety emergency plan, production safety work plan. Special operations personnel should hold relevant certificates. To improve the system of safety technical measures, there should be special contents in the construction plan.
Third, the specific requirements:
1, each type of work personnel must learn, be familiar with the relevant safety operation technical regulations and strictly abide by them in operation.
2. New employees must receive safety education before entering the construction site, and can work at their posts only after passing the examination. Construction personnel shall undergo pre-job training and have corresponding training records; Special operations personnel should be qualified and hold relevant certificates, and corresponding fire safety protection measures should be taken for open flame operations such as electric welding and gas welding.
3, before the implementation of the process with potential safety hazards, safety production disclosure should be carried out. All kinds of potential safety hazards that can be rectified immediately should be rectified on the spot. If the rectification is not in place or there are major safety hazards, it is necessary to immediately stop work for rectification, formulate rectification measures, and rectify within a time limit, so as to promote rectification through inspection and safety through rectification.
4, the correct use of personal protective equipment, earnestly implement the safety protection measures, enter the construction site, must wear a helmet.
5. No drinking is allowed before going to work and during operation, and you should concentrate at work to avoid safety and quality accidents caused by carelessness.
6. Protective measures and danger warning signs should be set up at main construction sites, operating points and dangerous parts such as ditches, pits and wells on the construction site.
7, such as after the accident, homework personnel first to rescue the wounded and eliminate danger, to prevent the accident from expanding, secondly to protect the scene of the accident, and timely report to the superior units and relevant departments.
Xx company
20xx65438+1October 8th
Minutes of on-site safety production meeting 6 Meeting time:
20xx March 4th at 6 p.m.
Meeting place:
Meeting room on the second floor of the project department
Participants:
All staff of the project department (attached with meeting sign-in form)
Moderator:
Li Guangtian
1. "Five certificates and one map" is hung at the gate of the on-site project department; The processing area and the material stacking area should be clearly partitioned to meet the requirements of safety, fire control and hygiene. Warning signs, announcements and warning lines should be set up in the construction area, and various safety measures should be taken.
2. Before the project starts, the contractor shall make technical disclosure to the construction personnel of this project, establish and improve the safety responsibility system, strictly implement the safety technical operation rules and the safety system of each type of work, make safety disclosure records, safety education and training records, safety inspection records, employee three-level education records and safety team activities records, and strictly perform the hot work examination and approval procedures.
3. In the process of construction, we should put safety work in the first place, conscientiously implement the policy of "safety first, prevention first", do a good job in safety management, persist for a long time and make unremitting efforts; Attention should be paid to the daily maintenance and overhaul of machinery and equipment to avoid injury to machinery and equipment.
4. Other personnel are prohibited from entering the construction site at will in the construction area. Construction personnel should enter the site in strict accordance with the requirements of safety regulations, wear safety helmets, and aerial work personnel should fasten their safety belts and work in strict accordance with aerial work regulations. At the same time, they will never be allowed to work after drinking.
5, construction with external protection should control the safe distance, tightly closed; Grounding and neutral protection system should be implemented according to the requirements of relevant specifications; The distribution box and switch box adopt three-level distribution and two-level protection, and the distribution line adopts five-core cable.
6. The lifting equipment (tower crane) must be inspected, calibrated and maintained every month 1 day.
7, temporary electricity need to prepare electricity specifications and procedures, distribution box should be properly set up, to ensure that there is no naked phenomenon.
8. A special safety construction scheme should be prepared for projects with high risks.
9, must do a good job in employee pre-job safety training, education materials and safety technical disclosure records.
10, special operations personnel must hold relevant certificates, and those without them must be filled within the prescribed time limit.
1 1, the safety system must be implemented in the specific construction.
12, foundation pit excavation must be sloping and well protected.
13, aerial work personnel must wear safety helmet and fasten your seat belt.
14, the construction director must pay special attention to the project quality management and site civilized construction management.
It is hoped that the construction unit will always keep safety in mind during the construction, and never take safety seriously to ensure the safe and smooth completion of the construction.
;