Plan the route reasonably to avoid waste.
In hydropower engineering, it is very important to plan the route reasonably. Shortening the routing distance and reducing bending are the key points. When the straight line section of the line exceeds 20m or there are more than three right-angle bends, remember to add the intermediate junction box. This can not only reduce waste, but also facilitate future maintenance.
The circuit wiring should be protected by PVC pipes.
Circuit wiring must be protected by PVC pipes, and sufficient distance should be kept between strong and weak current. Indoor wiring of TV, telephone and network cable cannot be connected in series. This can prevent signal interference and ensure the stable operation of home network, telephone, TV and other equipment.
Safety comes first in hydropower projects.
Pressure test should be done for water supply pipeline and leakage test should be done for drainage pipeline. These steps are essential, don't bother! Safety is the top priority of decoration!
Record a road map or a real photo.
Finally, don't forget to leave a road map or a real photo of the water circuit. In this way, once there is a problem after check-in, the problem can be found quickly, which is convenient for maintenance and avoids causing greater losses.