Current location - Education and Training Encyclopedia - Education and training - Xi' an decoration company, what matters should be paid attention to in the renovation of new houses?
Xi' an decoration company, what matters should be paid attention to in the renovation of new houses?
What matters should be paid attention to in the renovation of new houses:

1, design first

The first thing to pay attention to in decoration is the design before decoration. Naturally, the design is to measure the room in detail according to your own habits and preferences. There are many things to be measured, such as tile area, wall paint area, wallpaper area and floor area. Especially the wall size of furniture needs special attention.

2. Main structure

After the design is completed, enter the construction stage. The first stage of construction is the main construction, including wall demolition, wall building, wall covering, heating removal, plastic steel window replacement, etc.

3. Hydropower transformation

After the main building is basically completed, the water circuit can be transformed, but before the transformation, there is still a link that can not be ignored, that is, the measurement of cabinets. The first measurement here actually has no actual content, because the walls and floors of the room have not been treated, and the designer can't give specific dimensions. Just put forward some suggestions on the position of water inlet and socket on range hood. After the waterway reconstruction is completed, the bathroom needs to be waterproof, and the kitchen does not need to be waterproof.

4, woodworking program

Woodworking, bricklayer and oiler are three consecutive links in interior decoration, and the general order is woodworking, bricklayer and oiler. The basic principle is "whoever is dirty comes first".

5, wall coating

The next step is wall treatment, painting and so on, as well as painting some wooden furniture. Many people will wonder if it is the last time to finish painting. In fact, according to experience, leaving the top coat is of little significance, because the next operation steps will not be dirtier than painting.

Step 6 install kitchen cabinets

Generally, after the ceiling is completed, the door-to-door installation of cabinets can be carried out, which basically takes one day to complete. The cabinet is also equipped with a sink and a gas stove. It is best to turn on the gas before installation.

Step 7 install the floor

After the wooden door is installed, you can install the floor. When installing the floor, we need to pay attention to the following problems: first, investigate whether the ground needs leveling or local leveling; Before laying the floor, clean the floor to ensure that the floor is dry; When the floor is installed, the floor must be cut in the corridor, because indoor cutting will pollute the wall more seriously.