Current location - Education and Training Encyclopedia - Education and training - Summary of personal work in coal mine safety
Summary of personal work in coal mine safety
Article 1:

Under the correct guidance of Huaneng Group and the strong leadership of various engineering departments, our mine follows the guiding ideology of "intrinsically safe, life first" of Xukuang, aiming at creating intrinsically safe, high-yield and efficient mines in different places, pioneering and innovating, gradually improving the management system, safely constructing projects, constantly improving supporting facilities and providing strong life logistics support. We have worked hard on Qi Xin, a cadre and worker in the whole mine, optimizing design, making scientific arrangements and strengthening management. The production situation of our mine was carefully organized and planned, and the leap-forward transformation from capital mine to production mine was successfully realized, and the roadway was successfully constructed, and the above indicators were completed ahead of schedule.

In the whole year, the total driving footage was 789.6 meters, and the raw coal output was 654.38+200,000 tons. It has laid a solid foundation for the long-term development of our mine in the future. In the past 20xx years, we have mainly done the following work:

First, pay close attention to mine construction and successfully complete the goal.

(1) completed the construction, installation, commissioning and commissioning of the main production system in the mine.

1, three alleys in the north wing have been opened for more than 600 meters, and the substation in the panel has penetrated the nest, which basically constitutes the system. Substation and water pump house have been put into use, the inner water bin is in use, the water bin has been excavated, and the main roadway is being poured.

2. The first mining face is put into production safely. 30 10 1 working face and its supporting equipment were installed in August, and the joint trial operation was carried out. On September 3rd, 20xx was officially put into production. Up to now, * * * has produced 0/20,000 tons of raw coal (from September 3rd to June 30th, 15, 15).

3. Raw coal transportation and material transportation are safe and reliable. Raw coal transportation system 30 10 1 conveyor belt, centralized transportation roadway belt and main shaft belt were installed on June 23rd. After the formal production, the belt transportation volume is verified according to the actual situation, and the belt speed of the raw coal system is adjusted successively with the coal preparation plant to ensure the stability of the whole coal flow system. Auxiliary transportation: 50T crane in the underground loading chamber, 50T gantry crane on the ground and 50T crane in the fully mechanized equipment library have been installed one after another, and the underground trackless rubber-tyred vehicle has also been put into use. A track of 30kg/m and 900mm has been laid from the shaft to the bottom of the well, which greatly improves the underground transportation conditions.

4, the power system orderly and reliable power supply. The power supply of 35KV substation in our mine is from Panyunjie substation, with the capacity of 1 10KV, and it supplies power to the whole mine through two transformers with the capacity of 12500KVA. Ventilation room, main inclined shaft drive room, auxiliary shaft winch room, fully mechanized equipment library and other key places all adopt double-circuit power supply, all kinds of mechanical equipment are in good condition and all kinds of protective devices are in place.

5, mine ventilation system basically formed. The whole mine adopts 2-in 1 circulation (that is, the main and auxiliary inclined shafts take in air and the air shaft returns air), and the ventilation of 301kloc-0/working face adopts 3-in 1 circulation (air is taken by two measures for transportation and returned air is transported back). After the ventilation system of the north wing return air roadway and panel substation is safe and accurate, a perfect ventilation system is established.

6. The drainage system gradually forms a complete system. Before June, the temporary water storage tank at the lower mouth of the main inclined shaft was used, and two D46 horizontal multistage centrifugal pumps were used to drain water through a 4-inch pipeline in the main shaft. In September, five MD280-43×7 centrifugal pumps were installed and put into use in the main pump room, drainage pipes were installed in the 3010/kloc-0 working face and its upper and lower pipelines, and special drainage pipes were installed in the main tunnels underground. All the underground water poured into the inner water bin, and the outer water bin of 320xx just completed roadway excavation, 65438+ 65438+in February.

(two) gradually establish and improve the "six systems" of coal mine safety.

1, the monitoring system is put into normal use, and the ground control station is located in the safety production dispatching command center. In the production process, there are subsystems such as dynamic monitoring of roof, stress monitoring of bolt support, working resistance of fully mechanized mining support and stress monitoring of coal and rock drilling. It can dynamically track the production changes of key underground places around the clock, which is conducive to unified scheduling, overall command and coordinated production, and plays an irreplaceable role. Contact the manufacturer many times during the operation to continuously maintain the safe operation effect of the system.

2. The underground personnel positioning system was installed in July, 20xx, and officially put into use on August, 20xx, which simplified the attendance procedure, realized automation, integrated attendance, positioning and inquiry, and greatly facilitated the management of employees.

3. Communication system The permanent communication system adopts Huaheng SH-3000 dispatching communication system, and 38 wireless communication explosion-proof substations are deployed for wireless communication, covering the main underground tunnels and key places. 20xx was put into operation in September, and it is running well at present.

4, compressed air self-help pipeline laid in place. Four sets of upper and lower lanes are installed at 30 10 1 respectively, and three sets are installed at the liaison office of the third lane, totaling 1 1 set. The equipment needs to be installed on the heading face when the next heading face is heading.

5. The water supply and rescue system is also built accordingly, and the installation position is the same as the compressed air self-rescue device.

6. The emergency escape system is still in operation, and the rescue capsule has not been ordered.

Two, adhere to the essential safety, to achieve a good overall security situation throughout the year.

20xx is a crucial year for Liuxiang Coal Mine to link the past with the future. Adhere to the policy of "safety first, prevention first", start with basic work, and unremittingly pay attention to on-site safety management. The overall safety situation was good throughout the year, with 0,000 minor injuries and 44 "three violations" detected.

1, establish and improve the organization. After the establishment of Liuxiang Coal Mine in April, we set up technical department, safety department and ventilation work area according to the actual needs of the site, and equipped with relevant special types of work and management technicians; Improve the organization and management personnel of grass-roots units such as electromechanical work area, transportation work area, tunneling area 1 and area 2; At present, all institutions can operate effectively and give full play to their due functions. The newly allocated college students and technical school students have greatly filled the shortage of technicians, and all the work has been carried out in an orderly manner.

2. Carry out safety publicity and education activities. Hold safety work meetings before production, including 12 safety office meeting, 15 special safety management meeting and 10,000-person dispatching meeting. Organized and implemented June Safety Month, "ankang cup" competition, learning Shenhua spirit, and "12.8" safety warning education conference, which created a good safety education environment.

3. Formulate safety rules and regulations. The guiding documents such as 1 documentNo. 20xx safety work opinions, No.2 documentNo. 20xx Liuxiang coal mine safety management regulations, and assessment methods for managers' safety failure to perform their duties have been formulated successively. According to the particularity of safety production in Liuxiang Coal Mine, the management systems of ground crane and underground chamber crane, dustproof management system, waterproof management system, rubber-tyred vehicle use management system, Liuxiang Coal Mine fire control management regulations, inclined lane transportation management regulations, personnel driving operation management regulations and Liuxiang Coal Mine safety production operation permit management system were formulated.

4. Strengthen safety supervision and inspection. Fully implement the responsibility system for production safety, strengthen on-site safety management, and organize various forms of supervision and inspection regularly and irregularly. In 20xx, * * * organized 32 safety and quality inspections, general preventive inspections 10, electromechanical inspections 24 times, collaborative inspections 14 times, and hidden dangers investigation 175, all of which were rectified; Huaneng Coal Industry is welcome to inspect for 8 times, and 68 hidden dangers have been inspected. After inspection and tracking by the safety supervision department, the rectification rate of various hidden dangers reached 96%. Adhere to the principle of severe punishment and adopt the method of combining punishment with education. During the year, * * * detected 44 "three violations". Through help and education, they can standardize operation and safety work, effectively curb accidents and achieve the purpose of safety education.

5. Focus on monitoring weak links. Inclined roadway transportation is the focus of safety management in our mine. We have strengthened the inspection and maintenance of the anti-running car device in the auxiliary shaft, and contacted the manufacturer for debugging and improving the anti-running car device many times. The safety supervision department tracks and supervises the daily rope inspection and the maintenance of people and vehicles. During the first caving period of 30 10 1, the working resistance of the support and advance support roadway in the working face was dynamically monitored for 24 hours, which ensured the safe caving of the working face. Safety officers are conscientious, and duty officers supervise and inspect all leaders, thus preventing many accidents.

6. Pay close attention to the investigation and management of hidden dangers. Organized and implemented the "fight against illegal publications" special campaign, the "Looking Back" campaign, the "Safe Month in June" and ankang cup. In-depth investigation and management of hidden dangers have been carried out, and obvious results have been achieved. The hidden dangers have been reduced from more than 1 00 in/month to more than 80.

7. Gradually form a systematic working procedure. Hidden dangers investigation forms a closed-loop management, and rectification and implementation are in place in time; The governance of "three violations" has formed a perfect governance procedure and is being institutionalized; The accident investigation is meticulous and thorough, and the combination of punishment and education is standardized; The accident reporting procedure is clear, with strong deployment and quick response; Maintenance establish maintenance ledger, and key equipment is well documented.

Three, pay attention to learning and training, improve the professional quality of employees.

In order to improve the safety quality of cadres and workers in the whole mine, enhance self-protection awareness, and prevent and reduce all kinds of casualties, according to the requirements of superiors, combined with the actual situation of the mine, we focused on training the basic knowledge and on-site operation skills of safety production management personnel and special equipment operation management personnel, and completed the annual training task as planned, which improved the talent guarantee and intellectual support for promoting the safety production work in our mine and creating an intrinsically safe mine.

1, strengthen the organization and leadership of safety training. By employing part-time teachers, the effect of safety training is strengthened, safety training is brought into the integrated management of coal mine safety production, and the leadership responsibility system and target responsibility system of safety training are strengthened and improved; Five deputy mine managers attended the training course in stages.

2. Fully organize all-staff training. Every time a new miner enters the mine, he is carefully trained before taking up his post, so that he can master safety knowledge and on-site operation skills and enhance the safety awareness of employees. At present, there are 258 holders of special jobs and 25 managers, which basically meet the requirements. Completed the training of newly assigned 13 college students, 4 technical school students and several new miners.

3. Do a good job in retraining and certification of expired certificates. Full-time safety inspectors, department heads, engineers and technicians, special operators, ordinary workers and special operators who have been transferred or left their posts for more than one year and resumed their posts need to attend retraining.

Fourth, strictly control the quality of the project and strive to create a high-quality highlight project.

1, complete all the excavation tasks of the main water tank, accurately connect the main water tank with the main pump room, nail rail is completed, and pouring is currently under way;

2. The return air lane in the north wing and the return air duct of the panel substation have been connected safely and accurately, forming a perfect ventilation system;

3, 30 10 1 5 water exploration holes have been completed in the roof of the working face, and the sixth hole is currently under construction;

4. The hydraulic fracturing control technology of hard top coal roof has achieved the expected effect. Due to the scientific arrangement of drilling holes and strict construction, the roof lithology has weakened after a certain period of time. With the advance of the working face and the action of mine pressure, the direct roof and the main roof crack regularly and gradually collapse, and the pressure in front of the coal wall in the working face is weakened, which ensures the safety of the working face.

5. The main shaft and auxiliary shaft have been illuminated successively, and explosion-proof lighting lamps have been installed in the whole roadway, which improves the safety factor of inclined shaft traffic and pedestrians and provides good lighting conditions for normal maintenance.

6. Explosion-proof iron gates were installed in the central substation and pump room, and heaters were installed in the main shaft and auxiliary shaft, which greatly improved the supporting facilities of the mine.

Five, strengthen technical management, standardize various procedures and systems.

1. Strict operation procedures and safety technical measures examination and approval system: adopt the system of joint examination of operation procedures and safety technical measures in advance, abide by the measures examination and approval procedures, and complete the measures examination and approval and the study and communication before commencement.

2. Hold regular technical meetings. By holding regular technical meetings and one ventilation and three prevention meetings every month, we can not only summarize last month's technical work, but also arrange the focus of next month's work, which is conducive to finding problems, putting forward preventive measures, and making technical work advanced and instructive.

3. Complete data collection, sorting and filing in strict accordance with technical management regulations. Ensure that each project has a complete data storage, which is easy to find, strictly implement "one project, one measure" and put an end to the phenomenon of construction without measures.

4, optimize the layout, reasonable arrangement of production. Before putting into production, it is necessary to closely focus on the established joint debugging and testing goal of Liuxiang Coal Mine, speed up the project progress, optimize the design, rationally allocate and carefully organize the construction, especially during the shutdown period from March 26th to May 27th, carefully arrange the grass-roots units, eliminate all unfavorable factors, and actively organize the installation of 301KLOC-0/working face, belt installation of main shaft, pipeline laying of various systems and underground auxiliary facilities. Especially after Huamei's withdrawal, scientific organization of construction and rational deployment of personnel have realized the scientific and economical labor organization. 65438+ 10 65438+June 6, after the working face stopped production, the safety inspection was organized in conjunction with various professions, and the problems found were rectified in time during the shutdown. At present, the design of 30 103 working face has been completed, and the follow-up work is being carried out in an orderly manner.

5. Actively promote the application of new technologies and new processes: (1) In view of the large amount of dust generated during the excavation of the water bunker boring machine in our mine, which caused serious pollution to the workplace and caused serious harm to the health of employees (the dust removal device purchased by Party A was not effective), the original ventilation and dust removal system was reformed: from the original forced ventilation to the extraction type, which achieved good economic and social benefits; (2) The comprehensive water use scheme of the auxiliary shaft air shaft is designed, and the water from the auxiliary shaft is introduced into the air shaft ditch through the 82m borehole, and then enters the reservoir, which solves the water shortage problem, overcomes the problem that the vertical and horizontal pipes of the auxiliary shaft affect the driving of vehicles, and creates great safety and economic benefits for enterprises.

Although we have made regrettable achievements after one year's efforts, there are still many problems and deficiencies in our work. The basic work of safety needs to be further strengthened, and the habitual violation of regulations by employees has not been eliminated, which needs us to seriously solve in the new year. The core is as follows:

1, belt conveyor in main inclined shaft lacks short belt protection and automatic sprinkler, and dust-proof sprinkler is not formed.

2. Workers' operating skills and safety awareness need to be improved, and training needs to be strengthened to improve the management level of talents and equipment in our mine.

3. The professional level of managers can not meet the needs of modern high-yield and high-efficiency mines, and various training courses are being prepared to improve work efficiency.

4, all kinds of assessment and incentive mechanism is not perfect, establish and improve the long-term competition incentive mechanism, the competition activities throughout the coal mine safety work, to stimulate the labor enthusiasm and independent innovation spirit of cadres and workers. Promote quality standardization and establish intrinsically safe mines.

5. There is a serious shortage of core technical talents, and key equipment can only be contacted for help. The shortage of technical talents has seriously restricted the normal and safe production of our mine.

Article 2:

This month, under the correct leadership of the company, with the strong support and help of various departments and units, I led all the staff of the Supply Department to unite as one, and Qi Xin made concerted efforts to complete various tasks and achieved good results. The work of this month is summarized as follows:

First, focus on the center and strive to do a good job in supply.

This month, our mine1011kloc-0/fully mechanized mining face equipment acceptance confirmation. I led all the staff in the supply department to do a good job in equipment procurement to ensure the smooth acceptance and confirmation of the equipment in the fully mechanized mining face. At the beginning of this month, under the condition of few personnel and heavy tasks, I made careful plans and arrangements for equipment procurement, and carried out the tasks, requiring all suppliers to work hard and purchase equipment in time, without affecting the equipment installation progress of fully mechanized mining face. In the middle of this month, some equipment did not arrive in time, which seriously affected the equipment installation progress of fully mechanized mining face. In this case, we actively contact suppliers and ask them to attach great importance to it, speed up the production progress of the equipment and deliver the equipment to our company on time. In order to ensure the installation progress, we sent people to the factory twice to urge. After our efforts, the equipment arrived in time, which basically did not affect the installation of101kloc-0/0/fully mechanized mining face equipment. In the second half of this month, the equipment installation of fully mechanized mining face is coming to an end, but the lack of some sporadic materials still seriously restricts the installation progress of fully mechanized mining face equipment, such as some high-pressure hoses and lubricating oil used by the equipment. In this case, we set up a special office to collect and report the number of varieties lacking sporadic materials to the company, and at the same time actively contact suppliers to make the missing sporadic materials arrive in time and minimize the impact on the equipment installation progress of fully mechanized mining face.

Second, work hard to complete the warehouse inventory.

Due to the installation of10110/fully mechanized mining face equipment this month, our task is heavy and our work is tense. In the face of heavy work, we carry out warehouse inventory work according to the company's requirements. In order to do a good job in warehouse inventory, we held a meeting, studied company documents, and made careful arrangements on how to do a good job in warehouse inventory, requiring inventory personnel to do a good job in warehouse inventory with a responsible attitude, so as to ensure that the accounts are consistent with the certificates, the accounts are consistent with the facts, and the accounts are consistent with each other. Through the concerted efforts and hard work of Qi Xin, we found out the inventory situation of the auxiliary shaft warehouse, and the bulk materials of the main shaft warehouse were basically completed, and the inventory was reported as scheduled on the 25th. While doing a good job in warehouse inventory, it puts forward new requirements for strengthening warehouse management and improving the level of material management, and strives to manage the warehouse better and make contributions to the company's development.

This month, I worked very hard, worked very hard, completed all the tasks and achieved good results. Next month is the first month of coal mining in our company 10 1 1 fully mechanized working face. Under the correct leadership of the company, I will further invigorate my spirit and get up the courage according to the company's work spirit and work deployment, and lead all the staff in the supply department to do all the work well, serve the company's production and promote the company's healthy and rapid development.