Textbooks are the basis of learning. Candidates must understand the structure of the textbook, form the context of the textbook, and then start reviewing. In the review process, they should mark the key points and difficulties and remove some unnecessary contents. Through repeated review and memorization of test sites, the key points of the book can be clearly displayed in your mind, so that you can use it at any time when you do the problem.
First, BIM skill level 1 (those who meet one of the following conditions can apply for this level)
1, the recommended training time for reaching this skill level;
2. Continuously engaged in BIM modeling or related work 1 year or more.
Second, BIM skill level 2 (those who meet one of the following conditions can declare this level)
1, which has obtained the first-level assessment certificate of this skill and reached the training time recommended by the second level of this skill;
2. Engaged in BIM modeling and application for more than 2 years.
Three. BIM skill level 3 (those who meet one of the following conditions can declare this level)
1, which has obtained the second-level assessment certificate of this skill and reached the training time recommended by the third level of this skill;
2. Engaged in BIM design and professional application for more than 2 years.
It is suggested that the training time should be no less than 300 hours for level I, 300 hours for level II and 250 hours for level III. High-level training time refers to the time added on the basis of low-level training time.
BIM engineers are required to submit the following materials to registered candidates:
A scanned copy of the reverse side of the ID card and a scanned copy of the academic certificate; BIM application engineer professional technical course training assessment record; Color 2-inch photo with blue background.
It is difficult to control the cost, schedule, quality and safety of a project. And very important. However, due to the appearance of BIM, the accuracy, comprehensiveness and updating efficiency of model information are used to help design, construction, owners and supervisors strengthen the control of the project, thus putting an end to many accidents in the construction process.